Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 28

Get Book

Book Description
CVN-78 and CVN-79 are the first two ships in the Navy's new Gerald R. Ford (CVN-78) class of nuclear-powered aircraft carriers. CVN-78 was procured in FY2008 and is scheduled to enter service in 2015. The ship's procurement cost is estimated in the proposed FY2010 budget at $10,846 million in then-year dollars--$389 million (about 3.7%) more than the estimate in the FY2009 budget. Although CVN-78 was procured in FY2008, it is being funded with four-year incremental funding across FY2008-FY2011. The proposed FY2010 requests $739.3 million in procurement funding to help complete the ship's procurement cost. The Congressional Budget Office (CBO) reported in June 2008 that it estimates that CVN-78 will cost about $900 million more than the Navy estimates, and that if "CVN-78 experienced cost growth similar to that of other lead ships that the Navy has purchased in the past 10 years, costs could be much higher still." The Government Accountability Office (GAO) and other observers have expressed concern that difficulties in developing the CVN-78's new electromagnetic aircraft catapult (called the electromagnetic aircraft launch system, or EMALS), could delay the schedule for building the ship and increase the ship's construction cost. GAO highlighted the issue in a March 2009 report to Congress. The issue was the subject of a July 16, 2009, hearing before the Seapower and Expeditionary Forces subcommittee of the House Armed Services Committee.

Navy Ford (CVN-78) Class (CVN-21) Aircraft Carrier Program

Navy Ford (CVN-78) Class (CVN-21) Aircraft Carrier Program PDF Author: Ronald O'Rourke
Publisher:
ISBN:
Category : Aircraft carriers
Languages : en
Pages : 6

Get Book

Book Description


Navy Ford (Cvn-78) Class Aircraft Carrier Program

Navy Ford (Cvn-78) Class Aircraft Carrier Program PDF Author: Congressional Service
Publisher: Createspace Independent Publishing Platform
ISBN: 9781723259111
Category :
Languages : en
Pages : 88

Get Book

Book Description
CVN-78, CVN-79, CVN-80, and CVN-81 are the first four ships in the Navy's new Gerald R. Ford (CVN-78) class of nuclear-powered aircraft carriers (CVNs). CVN-78 (named for Gerald R. Ford) was procured in FY2008. The Navy's proposed FY2019 budget estimates the ship's procurement cost at $12,964.0 million (i.e., about $13.0 billion) in then-year dollars. The ship received advance procurement (AP) funding in FY2001-FY2007 and was fully funded in FY2008-FY2011 using congressionally authorized four-year incremental funding. To help cover cost growth on the ship, the ship received an additional $1,394.9 million in FY2014-FY2016 and FY2018 cost-to-complete procurement funding. The ship was delivered to the Navy on May 31, 2017, and was commissioned into service on July 22, 2017. CVN-79 (named for John F. Kennedy) was procured in FY2013. The Navy's proposed FY2019 budget estimates the ship's procurement cost at $11,341.4 million (i.e., about $11.3 billion) in then-year dollars. The ship received AP funding in FY2007-FY2012, and was fully funded in FY2013-FY2018 using congressionally authorized six-year incremental funding. The ship is scheduled for delivery to the Navy in September 2024. CVN-80 (named Enterprise) was procured in FY2018. The Navy's proposed FY2019 budget estimates the ship's procurement cost at $12,601.7 million (i.e., about $12.6 billion) in then-year dollars. The ship received AP funding in FY2016 and FY2017, and the Navy plans to fully fund the ship in FY2018-FY2023 using congressionally authorized six-year incremental funding. The Navy's proposed FY2019 budget requests $1,598.2 million in procurement funding for the ship. The ship is scheduled for delivery to the Navy in September 2027. CVN-81 (not yet named) is scheduled to be procured in FY2023. The Navy's proposed FY2019 budget estimates the ship's procurement cost at $15,088.0 million (i.e., about $15.1 billion) in then-year dollars. The Navy plans to request AP funding for the ship in FY2021 and FY2022, and then fully fund the ship in FY2023-FY2028 using congressionally authorized six-year incremental funding. The Navy's FY2019 budget submission programs the initial increment of AP funding for the ship in FY2021. The ship is scheduled for delivery to the Navy in September 2032. Oversight issues for Congress for the CVN-78 program for FY2019 include the following: whether to approve, reject, or modify the Navy's FY2019 procurement funding requests for the CVN-78 program; whether to accelerate the procurement of CVN-81 from FY2023 to an earlier year, or use a block buy contract to procure multiple aircraft carriers, or pursue a combined material buy for multiple aircraft carriers, or do some combination of these things; cost growth in the CVN-78 program, Navy efforts to stem that growth, and Navy efforts to manage costs so as to stay within the program's cost caps; whether to conduct the shock trial for the CVN-78 class in the near term, on the lead ship in the class, or years later, on the second ship in the class; CVN-78 program issues that were raised in a January 2018 report from the Department of Defense's (DOD's) Director of Operational Test and Evaluation (DOT&E); and whether the Navy should shift at some point from procuring large-deck, nuclear-powered carriers like the CVN-78 class to procuring smaller aircraft carriers.

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress PDF Author: Ronald Ronald O'Rourke
Publisher:
ISBN: 9781502509345
Category :
Languages : en
Pages : 70

Get Book

Book Description
CVN-78, CVN-79, and CVN-80 are the first three ships in the Navy's new Gerald R. Ford (CVN-78) class of nuclear-powered aircraft carriers (CVNs).CVN-78 was procured in FY2008. The Navy's proposed FY2015 budget estimates the ship's procurement cost at $12,887.2 million (i.e., about $12.9 billion) in then-year dollars. The ship received advance procurement funding in FY2001-FY2007 and was fully funded in FY2008- FY2011 using congressionally authorized four-year incremental funding. The Navy did not request any procurement funding for the ship in FY2012 and FY2013. To help cover cost growth on the ship, the ship received an additional $588.1 million in procurement funding in FY2014, and the Navy is requesting another $663.0 million in procurement funding for FY2015.CVN-79 was procured in FY2013. The ship received advance procurement funding in FY2007- FY2012, and the Navy plans to fully fund the ship in FY2013-FY2018 using congressionally authorized six-year incremental funding. The Navy's proposed FY2015 budget estimates CVN- 79's procurement cost at $11,498.0 million (i.e., about $11.5 billion) in then-year dollars, and requests $1,300 million in procurement funding for the ship.CVN-80 is scheduled to be procured in FY2018. The Navy's proposed FY2015 budget estimates the ship's procurement cost at $13,874.2 million (i.e., about $13.9 billion) in then-year dollars. Under the Navy's proposed FY2015 budget, the ship is to receive advance procurement funding in FY2016-FY2017 and be fully funded in FY2018-FY2023 using congressionally authorized six-year incremental funding.

United States Navy

United States Navy PDF Author: Aune Felicity Krizman
Publisher: Nova Snova
ISBN: 9781536147681
Category : History
Languages : en
Pages : 0

Get Book

Book Description
This book provides background information and potential oversight issues for Congress on the Columbia-class program, the Gerald R. Ford (CVN-78) class aircraft carrier program, the Navy's FFG(X) program, on the Navy's Littoral Combat Ship (LCS) program and on three new ship-based weapons the Navy is developing that could improve the ability of Navy surface ships to defend themselves against missiles, unmanned aerial vehicles (UAVs), and surface craft: the Surface Navy Laser Weapon System (SNLWS), the electromagnetic railgun (EMRG), and the gun-launched guided projectile (GLGP), previously known as the hypervelocity projectile (HVP).

Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans PDF Author: Ronald O'Rourke
Publisher: DIANE Publishing
ISBN: 1437930573
Category : Transportation
Languages : en
Pages : 43

Get Book

Book Description
This is a print on demand edition of a hard to find publication. Contents: (1) Introduction; (2) Background: Proposed 313-Ship Fleet; FY 2010 Shipbuilding Request; (3) Oversight Issues for Congress: Adequacy of Proposed 313-Ship Fleet: Adequacy of Shipbuilding Plan for Maintaining 313 Ships; Shortfalls Relative to 313-Ship Goals; Affordability of Shipbuilding Plan; (4) Legislative Activity for FY 2010: FY 2010 Defense Authorization Act; FY 2010 DoD Appropriations Act; Resolution Directing Submission of FY 2010 30-Year Shipbuilding Plan; Legislation on Individual Shipbuilding Programs. Appendixes: (A) December 2009 Press Reports About Draft FY 2011 30-Year Shipbuilding Plan; (B) Adequacy of Planned 313-Ship Fleet; (C) Size of the Navy and Navy Shipbuilding Rate. Charts and tables.

Department of Defense Authorization for Appropriations for Fiscal Year 2014 and the Future Years Defense Program: Seapower

Department of Defense Authorization for Appropriations for Fiscal Year 2014 and the Future Years Defense Program: Seapower PDF Author: United States. Congress. Senate. Committee on Armed Services
Publisher:
ISBN:
Category : Military research
Languages : en
Pages : 150

Get Book

Book Description


Ford-class Aircraft Carrier

Ford-class Aircraft Carrier PDF Author: U.s. Government Accountability Office
Publisher: Createspace Independent Publishing Platform
ISBN: 9781973956372
Category :
Languages : en
Pages : 54

Get Book

Book Description
" Ford-class aircraft carriers will feature new technologies designed to reduce life-cycle costs. The lead ship, CVN 78, has been under construction since 2008, and early construction on CVN 79 is underway. In 2007 Congress established a cap for procurement costs-which has been adjusted over time. In September 2013, GAO reported on a $2.3 billion increase in CVN 78 construction costs. GAO was mandated to examine risks in the CVN 78 program since its September 2013 report. This report assesses (1) the extent to which CVN 78 will be delivered within revised cost and schedule goals; (2) if CVN 78 will demonstrate its required capabilities before ship deployment; and (3) the steps the Navy is taking to achieve CVN 79 cost goals. To perform this work, GAO analyzed Navy and contractor data, and scheduling best practices. "

Navy Shipboard Lasers for Surface, Air, and Missile Defense: Background and Issues for Congress

Navy Shipboard Lasers for Surface, Air, and Missile Defense: Background and Issues for Congress PDF Author:
Publisher: DIANE Publishing
ISBN: 1437981666
Category :
Languages : en
Pages : 53

Get Book

Book Description


The U.S. Navy and the Rise of Great Power Competition

The U.S. Navy and the Rise of Great Power Competition PDF Author: James J. Wirtz
Publisher: Taylor & Francis
ISBN: 1003837204
Category : History
Languages : en
Pages : 166

Get Book

Book Description
This volume describes how technological and geo-political trends are rapidly transforming maritime affairs. A mix of original and previously published material, this volume describes how the 21st-century great power competition is changing the face of naval operations in general, and U.S. Navy operations in the Western Pacific in particular. The rise of an assertive China and its new anti-access and area-denial capabilities threaten the aircraft carrier-based maritime dominance of the U.S. Navy. Military and political trends in the Western Pacific and beyond suggest that the world is encountering a pivotal moment when existing weapons, tactics, and operations might be rendered obsolete by techno-strategic change. This volume considers these developments from three perspectives by describing: (1) the techno-strategic setting; (2) the institutional constraints that impede the ability of the U.S. Navy to respond to these changes; and (3) a new approach to naval force planning and strategy to cope with these developments. The volume culminates in a discussion of sophisticated strategies and operational concepts that position the U.S. Navy and its maritime allies and partners to prevail in today’s techno-strategic churn. This book will be of much interest to students of naval policy, strategic studies, Asia-Pacific politics, and International Relations.