Metro Gold Line Foothill Extension--Azusa to Montclair

Metro Gold Line Foothill Extension--Azusa to Montclair PDF Author: Metro Gold Line Foothill Extension Construction Authority
Publisher:
ISBN:
Category : Azusa (Calif.)
Languages : en
Pages :

Get Book Here

Book Description
The Metro Gold Line Foothill Extension from Azusa to Montclair is the second and final phase of the Foothill Extension. It expands the Gold Line alignment 12.3 miles to the east and includes six new stations in the cities of Glendora, San Dimas, La Verne, Pomona, Claremont, and Montclair. The project will provide light-rail transit service from the Azusa-Citrus Station in Azusa to the City of Montclair Transcenter. The project will share right-of-way with Metrolink but would operate on separate tracks and platforms.

Metro Gold Line Foothill Extension--Azusa to Montclair

Metro Gold Line Foothill Extension--Azusa to Montclair PDF Author: Metro Gold Line Foothill Extension Construction Authority
Publisher:
ISBN:
Category : Azusa (Calif.)
Languages : en
Pages :

Get Book Here

Book Description
The Metro Gold Line Foothill Extension from Azusa to Montclair is the second and final phase of the Foothill Extension. It expands the Gold Line alignment 12.3 miles to the east and includes six new stations in the cities of Glendora, San Dimas, La Verne, Pomona, Claremont, and Montclair. The project will provide light-rail transit service from the Azusa-Citrus Station in Azusa to the City of Montclair Transcenter. The project will share right-of-way with Metrolink but would operate on separate tracks and platforms.

Gold Line Foothill Extension Azusa to Montclair Draft Environmental Impact Report, Volume 2 Appendices

Gold Line Foothill Extension Azusa to Montclair Draft Environmental Impact Report, Volume 2 Appendices PDF Author: Metro Gold Line Foothill Extension Construction Authority
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :

Get Book Here

Book Description


Gold Line Phase II Pasadena to Montclair - Foothill Extension 2A

Gold Line Phase II Pasadena to Montclair - Foothill Extension 2A PDF Author: Metro Gold Line Foothill Extension Construction Authority
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages : 323

Get Book Here

Book Description
The Metro Gold Line Foothill Extension Construction Authority (the “Authority”) previously prepared a Draft Environmental Impact Statement/Environmental Impact Report (Draft EIS/EIR) for the Gold Line Foothill Extension Project (the “Project”). The Gold Line Foothill Extension is referred to as Phase 2 of the overall Gold Line Foothill Extension Project and, at complete build out, would span from the cities of Pasadena to Montclair. The Foothill Extension Project was divided into two subsequent phases: Phase 2A, spanning from Pasadena to Azusa, and Phase 2B, spanning from Azusa to Montclair. In conjunction with Authority’s decision to proceed with Phase 2A, a Final EIR was prepared based on the Draft EIS/EIR and was certified in 2007, though only for the purposes of extension’s Phase 2A. Because no federal action or funding is involved in Phase 2A, no NEPA action is required. The portion of the Phase 2A from Pasadena to Azusa includes 11.5 miles of track through six cities (Pasadena, Arcadia, Monrovia, Duarte, Irwindale, and Azusa), six stations, and the construction of a new Maintenance and Operation Facility (M&O Facility).

Gold Line Phase II, Pasadena to Montclair, Los Angeles and San Bernardino Counties

Gold Line Phase II, Pasadena to Montclair, Los Angeles and San Bernardino Counties PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 176

Get Book Here

Book Description


Gold Line Phase II

Gold Line Phase II PDF Author: United States. Department of Transportation
Publisher:
ISBN:
Category : Local transit
Languages : en
Pages :

Get Book Here

Book Description


Newhall Ranch Resource Management and Development Plan and Spineflower Conservation Plan

Newhall Ranch Resource Management and Development Plan and Spineflower Conservation Plan PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 682

Get Book Here

Book Description


Federal Register

Federal Register PDF Author:
Publisher:
ISBN:
Category : Delegated legislation
Languages : en
Pages : 230

Get Book Here

Book Description


Federal Register Index

Federal Register Index PDF Author:
Publisher:
ISBN:
Category : Administrative law
Languages : en
Pages : 968

Get Book Here

Book Description


Congressional Record

Congressional Record PDF Author: United States. Congress
Publisher:
ISBN:
Category : Law
Languages : en
Pages : 1482

Get Book Here

Book Description
The Congressional Record is the official record of the proceedings and debates of the United States Congress. It is published daily when Congress is in session. The Congressional Record began publication in 1873. Debates for sessions prior to 1873 are recorded in The Debates and Proceedings in the Congress of the United States (1789-1824), the Register of Debates in Congress (1824-1837), and the Congressional Globe (1833-1873)

Project Definition Report

Project Definition Report PDF Author: Metro Gold Line Foothill Extension Construction Authority
Publisher:
ISBN:
Category : Railroad crossings
Languages : en
Pages :

Get Book Here

Book Description
This report summarizes the refinement of the LPA as a result of further analysis and comments received during the public review period pertaining to station locations, parking facility locations, the LRT/freight tracks alignment, grade crossings, traction power substation locations, and typical mitigation measures. This refined project definition will be the basis for the environmental analysis in the Final EIS/R (FEIS/R) and for the Advanced Conceptual Engineering work efforts to support the FEIS/R."