Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 620
Book Description
Marine Corps Base Camp Pendleton, Santa Margarita River Flood Control Project, Basilone Road Bridge Replacement
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 620
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 620
Book Description
Record of Decision for the Santa Margarita River Flood Control Project and Basilone Road Bridge Replacement at Marine Corps Base, Camp Pendleton, California
Author: United States. Navy Department
Publisher:
ISBN:
Category : Camp Pendleton (Calif.)
Languages : en
Pages : 38
Book Description
Publisher:
ISBN:
Category : Camp Pendleton (Calif.)
Languages : en
Pages : 38
Book Description
Record of Decision for the Santa Margarita River Flood Control Project and Basilone Road Bridge Replacement Project at Marine Corps Base, Camp Pendleton, California
Author: Naval facilities engineering command san diego ca
Publisher:
ISBN:
Category :
Languages : en
Pages : 21
Book Description
Purauant to Section 102(c) of the National Environmental Policy Act (NEPA) of 1969, and the Council on Environmental Quality Regulations (40 CFR 1500-1508), the Department of the Navy announces its decision to construct a 14,500 foot-long levee and a 2,3OO foot floodwall combination and associated stormwater management system and a replacement Basilone Road Bridge at Marine Corps Base (MCB) Camp Pendleton, California. The Environmental Impact Statement (EIS) for these projects was prepared jointly by the Department of the Navy and Army Corps of Engineers. In addition, the U.S. Fish and Wildlife Service and the San Diego Regional Water Quality Control Board served as cooperating agencies during the analysis of potential impacts to the environment that may occur during construction, operation and maintenance of these projects.
Publisher:
ISBN:
Category :
Languages : en
Pages : 21
Book Description
Purauant to Section 102(c) of the National Environmental Policy Act (NEPA) of 1969, and the Council on Environmental Quality Regulations (40 CFR 1500-1508), the Department of the Navy announces its decision to construct a 14,500 foot-long levee and a 2,3OO foot floodwall combination and associated stormwater management system and a replacement Basilone Road Bridge at Marine Corps Base (MCB) Camp Pendleton, California. The Environmental Impact Statement (EIS) for these projects was prepared jointly by the Department of the Navy and Army Corps of Engineers. In addition, the U.S. Fish and Wildlife Service and the San Diego Regional Water Quality Control Board served as cooperating agencies during the analysis of potential impacts to the environment that may occur during construction, operation and maintenance of these projects.
Final Environmental Impact Statement
Author: United States. Army. Corps of Engineers. Los Angeles District
Publisher:
ISBN:
Category : Camp Pendleton (Calif.)
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Camp Pendleton (Calif.)
Languages : en
Pages :
Book Description
Draft Environmental Impact Statement Santa Margarita River Flood Control Project (P-010), Basilone Road Bridge Replacement Project (P-030), and Draft Clean Water Act 404(b)(1) Evaluation, Camp Pendleton, California
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 595
Book Description
Marine Corps Base (MCB) Camp Pendleton and Marine Corps Air Station (MCAS) Camp Pendleton maintain and operate facilities and provide services to support operations of aviation activities and units of operational forces of the United States Marine Corps (USMC). MCB Camp Pendleton is the USMC's only west coast military installation where a comprehensive air, sea, and ground assault training scenario can be executed. Facilities and operations in the southern portion of MCB Camp Pendleton adjacent to the Santa Margarita River are located in the 100-year floodplain for the river. Heavy rainfall in 1993 resulted in the flooding of MCAS Camp Pendleton, portions of MCB Camp Pendleton and the destruction of Basilone Road Bridge. The readiness and ability to support the missions of MCB Camp Pendleton and MCAS Camp Pendleton were seriously jeopardized because of the flooding and resulting damage. The flood damage caused operations to cease in the flood damaged areas and reduced the ability of the installation to perform the required missions for a period of 7 months. The flooding threatened the safety of personnel working in a portion of MCB Camp Pendleton and MCAS Camp Pendleton. The flooding also damaged structures and facilities, including buildings in the historic Santa Margarita Ranch House complex, structures in the Chappo (22) Area, and Sewage Treatment Plant (STP) No. 3. To prevent future damage to property and disruption of essential operations, the MCB Camp Pendleton has proposed construction of a flood control project.
Publisher:
ISBN:
Category :
Languages : en
Pages : 595
Book Description
Marine Corps Base (MCB) Camp Pendleton and Marine Corps Air Station (MCAS) Camp Pendleton maintain and operate facilities and provide services to support operations of aviation activities and units of operational forces of the United States Marine Corps (USMC). MCB Camp Pendleton is the USMC's only west coast military installation where a comprehensive air, sea, and ground assault training scenario can be executed. Facilities and operations in the southern portion of MCB Camp Pendleton adjacent to the Santa Margarita River are located in the 100-year floodplain for the river. Heavy rainfall in 1993 resulted in the flooding of MCAS Camp Pendleton, portions of MCB Camp Pendleton and the destruction of Basilone Road Bridge. The readiness and ability to support the missions of MCB Camp Pendleton and MCAS Camp Pendleton were seriously jeopardized because of the flooding and resulting damage. The flood damage caused operations to cease in the flood damaged areas and reduced the ability of the installation to perform the required missions for a period of 7 months. The flooding threatened the safety of personnel working in a portion of MCB Camp Pendleton and MCAS Camp Pendleton. The flooding also damaged structures and facilities, including buildings in the historic Santa Margarita Ranch House complex, structures in the Chappo (22) Area, and Sewage Treatment Plant (STP) No. 3. To prevent future damage to property and disruption of essential operations, the MCB Camp Pendleton has proposed construction of a flood control project.
Draft Environmental Impact Statement
Author: United States. Army. Corps of Engineers. Los Angeles District
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages :
Book Description
Marine Corps Base Camp Pendleton, Sewage Effluent Compliance Project, Lower Santa Margarita Basin
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 382
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 382
Book Description
Sewage Effluent Compliance Project, Lower Santa Margarita Basin, Marine Corps Base Camp Pendleton, San Diego County, California
Author:
Publisher:
ISBN:
Category : Camp Pendleton (Calif.)
Languages : en
Pages : 386
Book Description
Publisher:
ISBN:
Category : Camp Pendleton (Calif.)
Languages : en
Pages : 386
Book Description
Tertiary Treatment Plan and Associated Facilities, MCB Camp Pendleton
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 730
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 730
Book Description
Marine Corps Base Camp Pendleton, Sewage Effluent Compliance Project, Las Pulgas and San Mateo Areas
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 152
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 152
Book Description