I-93 and US-1 Interchange S-curve Straightening and Tunnel Construction, Central Artery, Boston

I-93 and US-1 Interchange S-curve Straightening and Tunnel Construction, Central Artery, Boston PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 58

Get Book Here

Book Description

I-93 and US-1 Interchange S-curve Straightening and Tunnel Construction, Central Artery, Boston

I-93 and US-1 Interchange S-curve Straightening and Tunnel Construction, Central Artery, Boston PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 58

Get Book Here

Book Description


I-93 and US-1 Interchange S-curve Straightening and Tunnel Construction, Central Artery, Boston

I-93 and US-1 Interchange S-curve Straightening and Tunnel Construction, Central Artery, Boston PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 196

Get Book Here

Book Description


Central Artery (I-93)/tunnel Project Supplemental Geotechnical Report

Central Artery (I-93)/tunnel Project Supplemental Geotechnical Report PDF Author: Massachusetts. Highway Department
Publisher:
ISBN:
Category : Roads
Languages : en
Pages :

Get Book Here

Book Description


Completing the "Big Dig"

Completing the Author: Transportation Research Board
Publisher: National Academies Press
ISBN: 0309088879
Category : Transportation
Languages : en
Pages : 60

Get Book Here

Book Description
Boston's Central Artery/Tunnel Project, a 7.8 mile system of bridges and underground highways and ramps, is the most expensive public works project ever undertaken in the United States. The original cost estimate of $2.6 billion has already been exceeded by $12 billion, and the project will not be completed until 2005, seven years late. The Massachusetts Turnpike Authority (MTA), the public steward of the project, requested that the National Research Council carry out an independent assessment of the project's management and contract administration practices, with a focus on the present situation and measures that should be taken to bring the project to a successful conclusion. This report presents the committee's findings and recommendations pertaining to cost, scheduling, and transitioning from the current organization dominated by consultants to an operations organization composed largely of full-time MTA staff. The report recommends that MTA establish an external, independent, peer-review program to address technical and management issues until the transition to operations and maintenance is complete; begin a media campaign now to teach drivers how to use the new system safely; and develop, immediately implement, and maintain a comprehensive security program.

In DEFENSE of the BIG DIG: How Politics Affected the Planning, Design and Construction of the Boston Central Artery/Tunnel Project

In DEFENSE of the BIG DIG: How Politics Affected the Planning, Design and Construction of the Boston Central Artery/Tunnel Project PDF Author: Orikaye G. Brown-West
Publisher: Lulu.com
ISBN: 1430312653
Category : History
Languages : en
Pages : 283

Get Book Here

Book Description
Tells the story of the planning, design and construction of the Big Dig, Boston's Central Artery and Tunnel project from a personal perspective. This most complex and technologically challenging project is a paradox of praises and blame. This book defends the professionals who planned, designed and constructed it; and blames the politics of project planning for the shortcomings.

Central Artery (I-93)/Third Harbor Tunnel (I-90) Project Boston, Massachusetts Final Supplemental Environmental Impact Statement, Report EOEA #4325

Central Artery (I-93)/Third Harbor Tunnel (I-90) Project Boston, Massachusetts Final Supplemental Environmental Impact Statement, Report EOEA #4325 PDF Author:
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 508

Get Book Here

Book Description


Third Harbor Tunnel, I-90/Central Artery, I-93, Boston

Third Harbor Tunnel, I-90/Central Artery, I-93, Boston PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 574

Get Book Here

Book Description


Central Artery (I-93)/Third Harbor Tunnel (I-90) Project Boston, Massachusetts Final Supplemental Environmental Impact Statement, Report EOEA #4325: Appendix

Central Artery (I-93)/Third Harbor Tunnel (I-90) Project Boston, Massachusetts Final Supplemental Environmental Impact Statement, Report EOEA #4325: Appendix PDF Author:
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 596

Get Book Here

Book Description


Central Artery (I-93)/Third Harbor Tunnel (I-90) Project Boston, Massachusetts Final Supplemental Environmental Impact Statement, Report EOEA #4325: Summary of changes to appendices

Central Artery (I-93)/Third Harbor Tunnel (I-90) Project Boston, Massachusetts Final Supplemental Environmental Impact Statement, Report EOEA #4325: Summary of changes to appendices PDF Author:
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 464

Get Book Here

Book Description


Central Artery (I-93)/tunnel (I-90) Project Geotechnical Data Report

Central Artery (I-93)/tunnel (I-90) Project Geotechnical Data Report PDF Author: Massachusetts. Department of Public Works
Publisher:
ISBN:
Category : Roads
Languages : en
Pages :

Get Book Here

Book Description