Final Sitewide Environmental Assessment for Continued Development of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming

Final Sitewide Environmental Assessment for Continued Development of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Final Sitewide Environmental Assessment EA-1008 for Continued Development of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming

Final Sitewide Environmental Assessment EA-1008 for Continued Development of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming PDF Author: United States. Department of Energy
Publisher:
ISBN:
Category : National Petroleum Reserve (Wyo.)
Languages : en
Pages :

Get Book Here

Book Description


Final Sitewide Environmental Assessment for Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming

Final Sitewide Environmental Assessment for Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 195

Get Book Here

Book Description
The Secretary of Energy is authorized to produce the Naval Petroleum Reserves No. 3 (NPR-3) at its maximum efficient rate (MER) consistent with sound engineering practices, for a period extending to April 5, 2000 subject to extension. Production at NPR-3 peaked in 1981 and has declined since until it has become a mature stripper field, with the average well yielding less than 2 barrels per day. The Department of Energy (DOE) has decided to discontinue Federal operation of NPR-3 at the end of its life as an economically viable oilfield currently estimated to be 2003. Although changes in oil and gas markets or shifts in national policy could alter the economic limit of NPR-3, it productive life will be determined largely by a small and declining reserve base. DOE is proposing certain activities over the next six years in anticipation of the possible transfer of NPR-3 out of Federal operation. These activities would include the accelerated plugging and abandoning of uneconomic wells, complete reclamation and restoration of abandoned sites including dismantling surface facilities, batteries, roads, test satellites, electrical distribution systems and associated power poles, when they are no longer needed for production, and the continued development of the Rocky Mountain Oilfield Testing Center (RMOTC). DOE has prepared this environmental assessment that analyzes the proposed plugging and abandonment of wells, field restoration and development of RMOTC. Based on the analysis in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). The preparation of an environmental impact statement is not required, and DOE is issuing this Finding of No Significant Impact (FONSI).

Predecisional Sitewide Environmental Assessment EA-1008 for Continued Development of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming

Predecisional Sitewide Environmental Assessment EA-1008 for Continued Development of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming PDF Author: United States. Department of Energy
Publisher:
ISBN:
Category : National Petroleum Reserve (Wyo.)
Languages : en
Pages :

Get Book Here

Book Description


Sitewide Environmental Assessment EA-1236 for Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming

Sitewide Environmental Assessment EA-1236 for Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 196

Get Book Here

Book Description
The Proposed Action includes the following principal elements: (1) The accelerated plugging and abandoning of uneconomic wells over the next six years. Uneconomic wells are operating wells which can no longer cover their direct and indirect costs. DOE estimates that there are 900 wells to be plugged and abandoned over the next six years, leaving approximately 200 wells for transfer by 2003. (2) Complete reclamation and restoration of abandoned sites. Restoration would include dismantling surface facilities, batteries, roads, test satellites, electrical distribution systems and associated power poles, when they are no longer needed for production. Soil contaminated by hydrocarbons would be biologically treated. Roads, facilities, batteries, and well sites would be ripped up, recontoured, disked and seeded with native vegetation. (3) The continued development of the Rocky Mountain Oilfield Testing Center (RMOTC) through the establishment of a consortium of university, state and private institutions. RMOTC would continue to provide facilities and support to government and private industry for testing and evaluating new oilfield and environmental technologies. Based on the findings of the EA, DOE has determined that the proposal does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. Therefore, an environmental impact statement is not required.

Final Sitewide Environmental Assessment EA-1236 for Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3 (NPR-3)

Final Sitewide Environmental Assessment EA-1236 for Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3 (NPR-3) PDF Author:
Publisher:
ISBN:
Category : Petroleum
Languages : en
Pages :

Get Book Here

Book Description


Effective Environmental Assessments

Effective Environmental Assessments PDF Author: Charles Eccleston
Publisher: CRC Press
ISBN: 1420032437
Category : Law
Languages : en
Pages : 489

Get Book Here

Book Description
Although upwards of 50,000 Environmental Assessments (EA) are prepared annually, the focus of the National Environmental Policy Acts (NEPA) Regulations is clearly on defining requirements for preparing environmental impact statements. Surprisingly, until now, there has been no authoritative and comprehensive guide on how to prepare Environmental As

Site-wide Environmental Assessment for the Divestiture of Rocky Mountain Oilfield Testing Center and Naval Petroleum Reserve No. 3

Site-wide Environmental Assessment for the Divestiture of Rocky Mountain Oilfield Testing Center and Naval Petroleum Reserve No. 3 PDF Author:
Publisher:
ISBN:
Category : Petroleum
Languages : en
Pages :

Get Book Here

Book Description
"DOE issued a Draft EA to assess potential environmental impacts of the proposed discontinuation of DOE operations at, and the proposed divestiture of, the Rocky Mountain Oilfield Testing Center (RMOTC) and Naval Petroleum Reserve Number 3 (NPR-3)."--Dept. of Energy website.

Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 1000

Get Book Here

Book Description


Joint Environmental Assessment for Western NPR-1 3-dimensional Seismic Project at Naval Petroleum Reserve No. 1, Kern County, California

Joint Environmental Assessment for Western NPR-1 3-dimensional Seismic Project at Naval Petroleum Reserve No. 1, Kern County, California PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 134

Get Book Here

Book Description
The Department of Energy (DOE), in conjunction with the Bureau of Land Management (BLM), has prepared an Environmental Assessment (DOE/EA-1124) to identify and evaluate the potential environmental impacts of the proposed geophysical seismic survey on and adjacent to the Naval Petroleum Reserve No. 1 (NPR-1), located approximately 35 miles west of Bakersfield, California. NPR-1 is jointly owned and operated by the federal government and Chevron U.S.A. Production Company. The federal government owns about 78 percent of NPR-1, while Chevron owns the remaining 22 percent. The governments̀ interest is under the jurisdiction of DOE, which has contracted with Bechtel Petroleum Operations, Inc. (BPOI) for the operation and management of the reserve. The 3-dimensional seismic survey would take place on NPR-1 lands and on public and private lands adjacent to NPR-1. This project would involve lands owned by BLM, California Department of Fish and Game (CDFG), California Energy Commission (CEC), The Nature Conservancy, the Center for Natural Lands Management, oil companies (Chevron, Texaco, and Mobil), and several private individuals. The proposed action is designed to provide seismic data for the analysis of the subsurface geology extant in western NPR-1 with the goal of better defining the commercial limits of a currently producing reservoir (Northwest Stevens) and three prospective hydrocarbon bearing zones: the {open_quotes}A Fan{close_quotes} in Section 7R, the 19R Structure in Section 19R, and the 13Z Structure in Section 13Z. Interpreting the data is expected to provide NPR-1 owners with more accurate locations of structural highs, faults, and pinchouts to maximize the recovery of the available hydrocarbon resources in western NPR-1. Completion of this project is expected to increase NPR-1 recoverable reserves, and reduce the risks and costs associated with further exploration and development in the area.