Environmental Assessment and Finding of No Significant Impact, Peach Bottom Atomic Power Station, Unit 3 (TAC No. M91028).

Environmental Assessment and Finding of No Significant Impact, Peach Bottom Atomic Power Station, Unit 3 (TAC No. M91028). PDF Author: U.S. Nuclear Regulatory Commission
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 10

Get Book Here

Book Description

Environmental Assessment and Finding of No Significant Impact, Peach Bottom Atomic Power Station, Unit 3 (TAC No. M91028).

Environmental Assessment and Finding of No Significant Impact, Peach Bottom Atomic Power Station, Unit 3 (TAC No. M91028). PDF Author: U.S. Nuclear Regulatory Commission
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 10

Get Book Here

Book Description


Critical Evaluation of the Nonradiological Environmental Technical Specifications. Volume 3. Peach Bottom Atomic Power Station Units 2 and 3

Critical Evaluation of the Nonradiological Environmental Technical Specifications. Volume 3. Peach Bottom Atomic Power Station Units 2 and 3 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
A comprehensive study of the data collected as part of the environmental Technical Specifications program for Units 2 and 3 of the Peach Bottom Nuclear Power Plant was conducted for the Office of Regulatory Research of the U.S. Nuclear Regulatory Commission. The program included an analysis of both the hydrothermal and ecological monitoring data collected from 1967 through 1976. Specific recommendations are made for improving both the present hydrothermal and ecological monitoring programs. Hydrothermal monitoring would be improved by more complete reporting of in-plant operating parameters. In addition, the present boat surveys could be discontinued, and monitoring efforts could be directed toward expanding the present thermograph network. Ecological monitoring programs were judged to be of high quality because standardized collection techniques, consistent reporting formats, and statistical analyses were performed on all of the data and were presented in an annual report. Sampling for all trophic groups was adequate for the purposes of assessing power plant induced perturbations. Considering the extensive period of preoperational data (six years) and operational data (three years) available for analysis, consideration could be given to reducing monitoring effort after data have been collected for a period when both units are operating at full capacity. In this way, an assessment of the potential ecological impact of the Peach Bottom facility can be made under conditions of maximum plant induced perturbations.

Peach Bottom Atomic Power Station

Peach Bottom Atomic Power Station PDF Author: James G. Smith
Publisher:
ISBN:
Category : Indexes
Languages : en
Pages : 24

Get Book Here

Book Description


Peach Bottom Nuclear Power Station, Units 2-3, Operation

Peach Bottom Nuclear Power Station, Units 2-3, Operation PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Washington Nuclear Project No.3, Proposed Settlement of Lawsuits; Environmental Assessment (EA) B1; Revised Environmental Assessment (EA) B2; Finding of No Significant Impact (Finding of No Significant Impact (FONSI)) B3; Agreements and Exhibits

Washington Nuclear Project No.3, Proposed Settlement of Lawsuits; Environmental Assessment (EA) B1; Revised Environmental Assessment (EA) B2; Finding of No Significant Impact (Finding of No Significant Impact (FONSI)) B3; Agreements and Exhibits PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 22

Get Book Here

Book Description


A Critical Evaluation of the Nonradiological Environmental Technical Specifications

A Critical Evaluation of the Nonradiological Environmental Technical Specifications PDF Author: S. M. Adams
Publisher:
ISBN:
Category : Nuclear power plants
Languages : en
Pages :

Get Book Here

Book Description


Environmental Assessment and Finding of No Significant Impact Related to Approval of an Ownership Transfer

Environmental Assessment and Finding of No Significant Impact Related to Approval of an Ownership Transfer PDF Author: U.S. Nuclear Regulatory Commission
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 6

Get Book Here

Book Description


Generic Environmental Impact Statement for License Renewal of Nuclear Plants

Generic Environmental Impact Statement for License Renewal of Nuclear Plants PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Report, Site Environmental Studies, Proposed Units 2 and 3, Peach Bottom Nuclear Power Station, Peach Bottom, Pennsylvania [for] Philadelphia Electric Company

Report, Site Environmental Studies, Proposed Units 2 and 3, Peach Bottom Nuclear Power Station, Peach Bottom, Pennsylvania [for] Philadelphia Electric Company PDF Author: Philadelphia Electric Company
Publisher:
ISBN:
Category : Nuclear power plants
Languages : en
Pages :

Get Book Here

Book Description


Fair Station Unit No.2 Balance Draft Conversion, Environmental Assessment (EA)-Finding of No Significant Impact (FONSI)-Environmental Report

Fair Station Unit No.2 Balance Draft Conversion, Environmental Assessment (EA)-Finding of No Significant Impact (FONSI)-Environmental Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 16

Get Book Here

Book Description