Author: Paul W. Hirt
Publisher: University Press of Kansas
ISBN: 0700618732
Category : History
Languages : en
Pages : 472
Book Description
The Pacific Northwest holds an abundance of resources for energy production, from hydroelectric power to coal, nuclear power, wind turbines, and even solar panels. But hydropower is king. Dams on the Columbia, Snake, Fraser, Kootenay, and dozens of other rivers provided the foundation for an expanding, regionally integrated power system in the U.S. Northwest and British Columbia. A broad historical synthesis chronicling the region's first century of electrification, Paul Hirt's new study reveals how the region's citizens struggled to build a power system that was technologically efficient, financially profitable, and socially and environmentally responsible. Hirt shows that every energy source comes with its share of costs and benefits. Because Northwest energy development meant river development, the electric power industry collided with the salmon fishing industry and the treaty rights of Northwest indigenous peoples from the 1890s to the present. Because U.S. federal agencies like the Army Corps of Engineers and the U.S. Bureau of Reclamation built many of the large dams in the region, a significant portion of the power supply is publicly owned, initiating contentious debates over how that power should best serve the citizens of the region. Hirt dissects these ongoing battles, evaluating the successes and failures of regional efforts to craft an efficient yet socially just power system. Focusing on the dynamics of problem-solving, governance, and the tense relationship between profit-seeking and the public interest, Hirt's narrative takes in a wide range of players-not only on the consumer side, where electricity transformed mills, mines, households, commercial districts, urban transit, factories, and farms, but also power companies operating at the local and regional level, and investment companies that financed and in some cases parasitized the operators. His study also straddles the international border. It is the first book to compare energy development in the U.S. Northwest and British Columbia. Both engaging and balanced in its treatment of all the actors on this expansive stage, The Wired Northwest helps us better understand the challenges of the twenty-first century, as we try to learn from past mistakes and re-design an energy grid for a more sustainable future.
The Wired Northwest
Author: Paul W. Hirt
Publisher: University Press of Kansas
ISBN: 0700618732
Category : History
Languages : en
Pages : 472
Book Description
The Pacific Northwest holds an abundance of resources for energy production, from hydroelectric power to coal, nuclear power, wind turbines, and even solar panels. But hydropower is king. Dams on the Columbia, Snake, Fraser, Kootenay, and dozens of other rivers provided the foundation for an expanding, regionally integrated power system in the U.S. Northwest and British Columbia. A broad historical synthesis chronicling the region's first century of electrification, Paul Hirt's new study reveals how the region's citizens struggled to build a power system that was technologically efficient, financially profitable, and socially and environmentally responsible. Hirt shows that every energy source comes with its share of costs and benefits. Because Northwest energy development meant river development, the electric power industry collided with the salmon fishing industry and the treaty rights of Northwest indigenous peoples from the 1890s to the present. Because U.S. federal agencies like the Army Corps of Engineers and the U.S. Bureau of Reclamation built many of the large dams in the region, a significant portion of the power supply is publicly owned, initiating contentious debates over how that power should best serve the citizens of the region. Hirt dissects these ongoing battles, evaluating the successes and failures of regional efforts to craft an efficient yet socially just power system. Focusing on the dynamics of problem-solving, governance, and the tense relationship between profit-seeking and the public interest, Hirt's narrative takes in a wide range of players-not only on the consumer side, where electricity transformed mills, mines, households, commercial districts, urban transit, factories, and farms, but also power companies operating at the local and regional level, and investment companies that financed and in some cases parasitized the operators. His study also straddles the international border. It is the first book to compare energy development in the U.S. Northwest and British Columbia. Both engaging and balanced in its treatment of all the actors on this expansive stage, The Wired Northwest helps us better understand the challenges of the twenty-first century, as we try to learn from past mistakes and re-design an energy grid for a more sustainable future.
Publisher: University Press of Kansas
ISBN: 0700618732
Category : History
Languages : en
Pages : 472
Book Description
The Pacific Northwest holds an abundance of resources for energy production, from hydroelectric power to coal, nuclear power, wind turbines, and even solar panels. But hydropower is king. Dams on the Columbia, Snake, Fraser, Kootenay, and dozens of other rivers provided the foundation for an expanding, regionally integrated power system in the U.S. Northwest and British Columbia. A broad historical synthesis chronicling the region's first century of electrification, Paul Hirt's new study reveals how the region's citizens struggled to build a power system that was technologically efficient, financially profitable, and socially and environmentally responsible. Hirt shows that every energy source comes with its share of costs and benefits. Because Northwest energy development meant river development, the electric power industry collided with the salmon fishing industry and the treaty rights of Northwest indigenous peoples from the 1890s to the present. Because U.S. federal agencies like the Army Corps of Engineers and the U.S. Bureau of Reclamation built many of the large dams in the region, a significant portion of the power supply is publicly owned, initiating contentious debates over how that power should best serve the citizens of the region. Hirt dissects these ongoing battles, evaluating the successes and failures of regional efforts to craft an efficient yet socially just power system. Focusing on the dynamics of problem-solving, governance, and the tense relationship between profit-seeking and the public interest, Hirt's narrative takes in a wide range of players-not only on the consumer side, where electricity transformed mills, mines, households, commercial districts, urban transit, factories, and farms, but also power companies operating at the local and regional level, and investment companies that financed and in some cases parasitized the operators. His study also straddles the international border. It is the first book to compare energy development in the U.S. Northwest and British Columbia. Both engaging and balanced in its treatment of all the actors on this expansive stage, The Wired Northwest helps us better understand the challenges of the twenty-first century, as we try to learn from past mistakes and re-design an energy grid for a more sustainable future.
History of Pierce County, Washington
Author: William Pierce Bonney
Publisher:
ISBN:
Category : Pierce County (Wash.)
Languages : en
Pages : 658
Book Description
Publisher:
ISBN:
Category : Pierce County (Wash.)
Languages : en
Pages : 658
Book Description
The National Union Catalog, Pre-1956 Imprints
Author:
Publisher:
ISBN:
Category : Union catalogs
Languages : en
Pages : 712
Book Description
Publisher:
ISBN:
Category : Union catalogs
Languages : en
Pages : 712
Book Description
Power and the Pacific Northwest
Author: Vera Springer
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 196
Book Description
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 196
Book Description
Journal of Electricity and Western Industry
Author:
Publisher:
ISBN:
Category : Electrical engineering
Languages : en
Pages : 682
Book Description
Publisher:
ISBN:
Category : Electrical engineering
Languages : en
Pages : 682
Book Description
Journal of Electricity
Author:
Publisher:
ISBN:
Category : Electrical engineering
Languages : en
Pages : 634
Book Description
Publisher:
ISBN:
Category : Electrical engineering
Languages : en
Pages : 634
Book Description
Illustrated History of the State of Washington ...
Author: Harvey K. Hines
Publisher:
ISBN:
Category : Washington (State)
Languages : en
Pages : 846
Book Description
Publisher:
ISBN:
Category : Washington (State)
Languages : en
Pages : 846
Book Description
BPA and the Struggle for Power at Cost
Author: Gene Tollefson
Publisher:
ISBN:
Category : Electric utilities
Languages : en
Pages : 450
Book Description
Publisher:
ISBN:
Category : Electric utilities
Languages : en
Pages : 450
Book Description
Electric Power
Author:
Publisher:
ISBN:
Category : Electric power
Languages : en
Pages : 454
Book Description
Publisher:
ISBN:
Category : Electric power
Languages : en
Pages : 454
Book Description
Electrical West, 1887-1962
Author:
Publisher:
ISBN:
Category : Electric industries
Languages : en
Pages : 504
Book Description
Publisher:
ISBN:
Category : Electric industries
Languages : en
Pages : 504
Book Description