Draft Environmental Impact Statement for the Gateway West Transmission Line Project

Draft Environmental Impact Statement for the Gateway West Transmission Line Project PDF Author:
Publisher:
ISBN:
Category : Electric power transmission
Languages : en
Pages : 3263

Get Book Here

Book Description

Draft Environmental Impact Statement for the Gateway West Transmission Line Project

Draft Environmental Impact Statement for the Gateway West Transmission Line Project PDF Author:
Publisher:
ISBN:
Category : Electric power transmission
Languages : en
Pages : 3263

Get Book Here

Book Description


Draft Environmental Impact Statement for the Gateway West Transmission Line Project

Draft Environmental Impact Statement for the Gateway West Transmission Line Project PDF Author:
Publisher:
ISBN:
Category : Electric power transmission
Languages : en
Pages : 3263

Get Book Here

Book Description


Gateway West Transmission Line Project [draft Supplemental] Environmental Impact Statement

Gateway West Transmission Line Project [draft Supplemental] Environmental Impact Statement PDF Author:
Publisher:
ISBN:
Category : Electric power transmission
Languages : en
Pages :

Get Book Here

Book Description
On May 7, 2007, Idaho Power Company and PacifiCorp (doing business as Rocky Mountain Power), collectively known as the Proponents, applied to the Bureau of Land Management (BLM) for a right-of-way (ROW) grant to use the National System of Public Lands for portions of the Gateway West Transmission Line Project (Gateway West or Project). The original application was revised in October 2007, August 2008, May 2009, and January 2010 to reflect changes and refinements in their proposed Project and in response to feedback from the public regarding routing alternatives. The Plan of Development (POD) has been revised several times in response to Project changes and recommendations from the BLM, other reviewing agencies, and public comment. This supplemental environmental impact statement (SEIS) evaluates the revised proposed action for Segments 8 and 9 as stated in the application including environmental protection measures. It also examines the environmental impacts of four other route alignments and two route variations. The BLM has identified seven action alternatives, two of which have been selected as Co-Preferred Alternatives by the BLM. Granting of the ROW for the Revised Proposed Routes or other route alignments would require amendments to BLM Resource Management Plans and BLM Management Framework Plans. Proposed amendments have been identified. Significant impacts were identified from construction and operations of the transmission line on historical resources (historic trails), visual quality, and cumulative impacts on several resources based on past and present levels of disturbance. A framework for compensatory mitigation has been added. The comment period on the Draft SEIS will close 90 days from the date of publication of the U.S. Environmental Protection Agency’s Notice of Availability in the Federal Register.

Draft Supplemental Environmental Impact Statement for Segments 8 and 9 of the Gateway West Transmission Line Project

Draft Supplemental Environmental Impact Statement for Segments 8 and 9 of the Gateway West Transmission Line Project PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Energy Gateway South Transmission Project

Energy Gateway South Transmission Project PDF Author:
Publisher:
ISBN:
Category : Electric power transmission
Languages : en
Pages :

Get Book Here

Book Description
This Environmental Impact Statement has been prepared to analyze and disclose the impacts of granting a right-of-way across federal land to PacifiCorp (doing business as Rocky Mountain Power, the Applicant) for the purpose of constructing, operating, and maintaining the single-circuit, alternating current, 500-kilovolt transmission line and amending Bureau of Land Management and U.S. Forest Service land use plans to accommodate the proposed transmission line. The transmission line would begin near Medicine Bow, Carbon County, Wyoming, at the planned Aeolus Substation and would extend south and west to the Clover Substation (currently under construction) near Mona, Juab County, Utah, a distance between 400 and 500 miles, depending on the route selected.

Final Environmental Impact Statement and Proposed Land-use Plan Amendments for the Energy Gateway South Transmission Project

Final Environmental Impact Statement and Proposed Land-use Plan Amendments for the Energy Gateway South Transmission Project PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Draft Environmental Impact Statement and Land-use Plan Amendments for the Energy Gateway South Transmission Project

Draft Environmental Impact Statement and Land-use Plan Amendments for the Energy Gateway South Transmission Project PDF Author: United States. Bureau of Land Management
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Draft Environmental Impact Statement

Draft Environmental Impact Statement PDF Author:
Publisher:
ISBN:
Category : Electric lines
Languages : en
Pages : 276

Get Book Here

Book Description


Draft Environmental Impact Statement and Land Use Plan Amendments for the Boardman to Hemingway Transmission Line Project

Draft Environmental Impact Statement and Land Use Plan Amendments for the Boardman to Hemingway Transmission Line Project PDF Author:
Publisher:
ISBN:
Category : Electric lines
Languages : en
Pages :

Get Book Here

Book Description


Draft Environmental Impact Statement

Draft Environmental Impact Statement PDF Author: United States. Department of Agriculture
Publisher:
ISBN:
Category : Electric power-plants
Languages : en
Pages :

Get Book Here

Book Description