Determination of Contract Time for Highway Construction Projects

Determination of Contract Time for Highway Construction Projects PDF Author: Zohar J. Herbsman
Publisher:
ISBN:
Category : Technology & Engineering
Languages : en
Pages : 56

Get Book Here

Book Description
This synthesis will be of interest to highway administrators; design, construction, and specification engineers; project schedulers; and highway construction contractors. The synthesis describes the state of the practice with respect to procedures used throughout the United States and other countries to determine highway construction contract time, with emphasis on new methods in use. Transportation agencies must set reasonable times for completion of construction projects. Factors to be considered in determining contract time include materials, equipment, labor, cost, and constraints such as weather, traffic conditions, utilities location, and user convenience. This report of the Transportation Research Board covers the still pertinent procedures from NCHRP Synthesis 79: Contract Time Determination (e. g., critical path methods, linear scheduling, bar charts) as well as new methods in use (e.g., A + B methods, lane rental, flexible time-to- start). In addition to information on various methods to determine contract time, information on issues related to implementing procedures for contract time determination, from both agency and contractor perspective, is included.

Determination of Contract Time for Highway Construction Projects

Determination of Contract Time for Highway Construction Projects PDF Author: Zohar J. Herbsman
Publisher:
ISBN:
Category : Technology & Engineering
Languages : en
Pages : 56

Get Book Here

Book Description
This synthesis will be of interest to highway administrators; design, construction, and specification engineers; project schedulers; and highway construction contractors. The synthesis describes the state of the practice with respect to procedures used throughout the United States and other countries to determine highway construction contract time, with emphasis on new methods in use. Transportation agencies must set reasonable times for completion of construction projects. Factors to be considered in determining contract time include materials, equipment, labor, cost, and constraints such as weather, traffic conditions, utilities location, and user convenience. This report of the Transportation Research Board covers the still pertinent procedures from NCHRP Synthesis 79: Contract Time Determination (e. g., critical path methods, linear scheduling, bar charts) as well as new methods in use (e.g., A + B methods, lane rental, flexible time-to- start). In addition to information on various methods to determine contract time, information on issues related to implementing procedures for contract time determination, from both agency and contractor perspective, is included.

Determination of Contract Time for Highway Construction Projects

Determination of Contract Time for Highway Construction Projects PDF Author:
Publisher:
ISBN:
Category : Road construction contracts
Languages : en
Pages : 43

Get Book Here

Book Description


Determination of Contract Time Durations for ISHC Highway Construction Projects

Determination of Contract Time Durations for ISHC Highway Construction Projects PDF Author: James E. Rowings
Publisher:
ISBN:
Category : Road construction contracts
Languages : en
Pages : 298

Get Book Here

Book Description


Construction Contract Time Determination

Construction Contract Time Determination PDF Author: Donn E. Hancher
Publisher:
ISBN:
Category : Road construction contracts
Languages : en
Pages : 134

Get Book Here

Book Description


Determination of INDOT Highway Construction Production Rates and Estimation of Contract Times

Determination of INDOT Highway Construction Production Rates and Estimation of Contract Times PDF Author: Yi Jiang
Publisher:
ISBN: 9781622602056
Category :
Languages : en
Pages :

Get Book Here

Book Description


Project Duration

Project Duration PDF Author: Khader I. Abu Al-eis
Publisher:
ISBN:
Category :
Languages : en
Pages : 236

Get Book Here

Book Description


Contract Time Optimization Methodologies for Highway Construction Projects

Contract Time Optimization Methodologies for Highway Construction Projects PDF Author: Yi Jiang
Publisher: Purdue University Press
ISBN: 9781622600564
Category : Transportation
Languages : en
Pages : 114

Get Book Here

Book Description
This study was conducted to develop methodologies for appropriately determining the monetary values of I/D rates of highway construction projects in Indiana. In this study, a comprehensive literature review was performed to identify possible effective methodologies for work zone effects, construction impacts, and contract time optimization. The highway production rates were developed in a previous study. The production rates were validated and adjusted with the help from INDOT field engineers. The weigh-in-motion (WIM) collected traffic data were obtained, processed, and analyzed to provide input data for user cost calculations at highway work zones. Construction data were obtained and processed to develop the relationship between the construction cost and construction time. With the traffic and construction data, the methods for user cost calculations were developed as the basis of determining appropriate I/D rates. User costs resulting from traffic delays at Indiana highway work zones were analyzed. A series of equations for estimating user costs at work zones were developed. User cost calculation sheets using MS Excel were developed based on the traffic data on Indiana highway network. Finally, a method was developed to determine I/D rates based on the relationship between construction cost and construction time in combination with the estimated user costs at given work zones. Guidelines for developing A+B bidding and I/D provisions were provided.

Development and Application of a Production Rate Resource for Contract Time Determination

Development and Application of a Production Rate Resource for Contract Time Determination PDF Author: Roberto Leandro Oramas
Publisher:
ISBN:
Category :
Languages : en
Pages : 526

Get Book Here

Book Description
Production rates are significantly important for contract time determination procedures as these are essential for estimating the duration of every activity needed to complete a highway construction project. For this reason, many estimation systems, including Texas Department of Transportation’s Contract Time Determination System (TXCTDS), explicitly depict production rate data of work items considered important in highway construction projects. Though many systems and databases available in the public domain provide an abundance of production rate data, they provide different rates for comparable work items. This research focusses on the development of the Production Rate Resource, a single, easy to use reference of production rate data gathered from publicly available sources intended to be used by TXDOT contract time estimators. The resource was developed by gathering production rate information through conducting a literature review and organizing the found data into a well assembled Excel workbook. This arrangement contains Excel sheet tabs depicting the resource’s introduction, details of the included production rate sources, a summary of the included work items and their respective production rate data, and item worksheet tabs portraying the gathered production rate data for each work item. These item worksheets also contain production rate averages, graphs that allow comparison and analysis of the data through visual aid, and specific scope information provided by the original sources. A recommended process based on the critical path method (CPM) was also developed for conducting a contract time determination using the Production Rate Resource. The gathered production rate data was then tested by conducting two contract time estimations of actual TXDOT highway construction projects using the recommended process. The results were compared with TXDOT’s contract estimations for an in-depth analysis, and the findings led to significant improvements to the resource. The final assembly of the Production Rate Resource provides production rate data for 59 highway construction work items provided by six publicly available sources.

Evaluation of Contract Time Estimation and Contracting Procedures for Louisiana Department of Transportation and Development Construction Projects

Evaluation of Contract Time Estimation and Contracting Procedures for Louisiana Department of Transportation and Development Construction Projects PDF Author:
Publisher:
ISBN:
Category : Public contracts
Languages : en
Pages : 140

Get Book Here

Book Description


A Process for Determining Construction Contract Duration for Highway Projects

A Process for Determining Construction Contract Duration for Highway Projects PDF Author: Christopher Matthew Bollig
Publisher:
ISBN:
Category : Roads
Languages : en
Pages : 192

Get Book Here

Book Description
This paper describes a process for estimating the construction contract time for highway projects. The process developed uses the critical path method (CPM) to assess complex, non-repetitive construction items, while at the same time, assessing horizontal, repetitive construction items with the linear scheduling method. This is chiefly done by the identification of strategic sequencing options and critical-path-limited scoping of the model.