Author: Michael S. Weichman
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
DES MOINES RIVERFRONT RECREATION PROJECT, DES MOINES, IOWA
Author: Michael S. Weichman
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Boundaries of the Des Moines Recreational River and Greenbelt, Iowa Project
Author:
Publisher:
ISBN:
Category : Des Moines River
Languages : en
Pages : 8
Book Description
Publisher:
ISBN:
Category : Des Moines River
Languages : en
Pages : 8
Book Description
Data Relating to H.R. 6
Author:
Publisher:
ISBN:
Category : Des Moines River
Languages : en
Pages : 6
Book Description
Publisher:
ISBN:
Category : Des Moines River
Languages : en
Pages : 6
Book Description
Des Moines River, Recreational River and Greenbelt GDM
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 352
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 352
Book Description
Final Environmental Statement: Des Moines Riverfront Development
Author: United States. Bureau of Outdoor Recreation
Publisher:
ISBN:
Category : City planning
Languages : en
Pages : 22
Book Description
Publisher:
ISBN:
Category : City planning
Languages : en
Pages : 22
Book Description
Des Moines Riverfront Development, Des Moines River
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 120
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 120
Book Description
A Phase I Archaeological Survey for the Proposed Des Moines Recreational River and Greenbelt, Botanical Center Riverfront Park, Riverfront Garden Project, Des Moines, Iowa
Author: Leah D. Rogers
Publisher:
ISBN:
Category : Des Moines (Iowa)
Languages : en
Pages : 0
Book Description
Publisher:
ISBN:
Category : Des Moines (Iowa)
Languages : en
Pages : 0
Book Description
A Phase I Archaeological Survey for the Proposed Des Moines Recreational River and Greenbelt, Botanical Center Riverfront Park, Riverfront Garden Project, Des Moines, Iowa
Author: Leah D. Rogers
Publisher:
ISBN:
Category : Des Moines (Iowa)
Languages : en
Pages : 90
Book Description
Publisher:
ISBN:
Category : Des Moines (Iowa)
Languages : en
Pages : 90
Book Description
Boundaries of the Des Moines Recreational River and Greenbelt, Iowa Project
Author:
Publisher:
ISBN:
Category : Des Moines River
Languages : en
Pages : 3
Book Description
Publisher:
ISBN:
Category : Des Moines River
Languages : en
Pages : 3
Book Description
Plan for Engineering and Design. Des Moines Recreational River and Greenbelt, Des Moines River, Iowa
Author: ARMY ENGINEER DISTRICT ROCK ISLAND IL.
Publisher:
ISBN:
Category :
Languages : en
Pages : 142
Book Description
The Des Moines Recreational River and Greenbelt was funded and conditionally authorized by Public Law 99-88, as approved on August 15, 1985. The project is for the development, operation, and maintenance of a recreation and greenbelt area on, and along, the Des Moines River from U.S. Highway 20 in Fort Dodge, Iowa, downstream to relocated U.S. Highway 92 in the vicinity of the Red Rock Dam. The Plan for Engineering and Design was prepared to establish the appropriate scope and content of the General Design Memorandum, and to describe the role of the Advisory Committee, public involvement, and project administration. Key aspects of the General Design Memorandum are discussed in the Plan for Engineering and Design. Letters of assurance are included in appendix D and are addressed in the main report to satisfy the local cooperation requirements at this stage of the study.
Publisher:
ISBN:
Category :
Languages : en
Pages : 142
Book Description
The Des Moines Recreational River and Greenbelt was funded and conditionally authorized by Public Law 99-88, as approved on August 15, 1985. The project is for the development, operation, and maintenance of a recreation and greenbelt area on, and along, the Des Moines River from U.S. Highway 20 in Fort Dodge, Iowa, downstream to relocated U.S. Highway 92 in the vicinity of the Red Rock Dam. The Plan for Engineering and Design was prepared to establish the appropriate scope and content of the General Design Memorandum, and to describe the role of the Advisory Committee, public involvement, and project administration. Key aspects of the General Design Memorandum are discussed in the Plan for Engineering and Design. Letters of assurance are included in appendix D and are addressed in the main report to satisfy the local cooperation requirements at this stage of the study.