Davis Dam to Riviera 230 KV Transmission Line and Associated Facilities, Mohave County, Environmental Assessment (EA)-Finding of No Significant Impact (FONSI).

Davis Dam to Riviera 230 KV Transmission Line and Associated Facilities, Mohave County, Environmental Assessment (EA)-Finding of No Significant Impact (FONSI). PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 32

Get Book Here

Book Description


Davis Dam to Riviera 230 kV transmission line and associated facilities, Mohave County, environmental assessment

Davis Dam to Riviera 230 kV transmission line and associated facilities, Mohave County, environmental assessment PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0

Get Book Here

Book Description


Coolee Dam National Recreation Area, Interpretive Prospectus (1975) B1; Interpretive Prospectus (1975) B1; Statement for Management (1979) B2; Environmental Assessment (EA) for the General Management Plan (GMP) B3; Finding of No Significant Impact (FONSI) for the General Management Plan (GMP) (1980) B4; General Management Plan (GMP) (1980)

Coolee Dam National Recreation Area, Interpretive Prospectus (1975) B1; Interpretive Prospectus (1975) B1; Statement for Management (1979) B2; Environmental Assessment (EA) for the General Management Plan (GMP) B3; Finding of No Significant Impact (FONSI) for the General Management Plan (GMP) (1980) B4; General Management Plan (GMP) (1980) PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 42

Get Book Here

Book Description


Finding of No Significant Impact and Final Supplemental Environmental Assessment to the Folsom Dam Safety and Flood Damage Reduction Final Environmental Impact Statement/environmental Impact Report

Finding of No Significant Impact and Final Supplemental Environmental Assessment to the Folsom Dam Safety and Flood Damage Reduction Final Environmental Impact Statement/environmental Impact Report PDF Author:
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 118

Get Book Here

Book Description


Environmental Assessment and Finding of No Significant Impact: Interim Measures for the Mixed Waste Management Facility Groundwater at the Burial Ground Complex at the Savannah River Site

Environmental Assessment and Finding of No Significant Impact: Interim Measures for the Mixed Waste Management Facility Groundwater at the Burial Ground Complex at the Savannah River Site PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
The U.S. Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed interim measures for the Mixed Waste Management Facility (MW) groundwater at the Burial Ground Complex (BGC) at the Savannah River Site (SRS), located near Aiken, South Carolina. DOE proposes to install a small metal sheet pile dam to impound water around and over the BGC groundwater seepline. In addition, a drip irrigation system would be installed. Interim measures will also address the reduction of volatile organic compounds (VOCS) from ''hot-spot'' regions associated with the Southwest Plume Area (SWPA). This action is taken as an interim measure for the MWMF in cooperation with the South Carolina Department of Health and Environmental Control (SCDHEC) to reduce the amount of tritium seeping from the BGC southwest groundwater plume. The proposed action of this EA is being planned and would be implemented concurrent with a groundwater corrective action program under the Resource Conservation and Recovery Act (RCRA). On September 30, 1999, SCDHEC issued a modification to the SRS RCRA Part B permit that adds corrective action requirements for four plumes that are currently emanating from the BGC. One of those plumes is the southwest plume. The RCRA permit requires SRS to submit a corrective action plan (CAP) for the southwest plume by March 2000. The permit requires that the initial phase of the CAP prescribe a remedy that achieves a 70-percent reduction in the annual amount of tritium being released from the southwest plume area to Fourmile Branch, a nearby stream. Approval and actual implementation of the corrective measure in that CAP may take several years. As an interim measure, the actions described in this EA would manage the release of tritium from the southwest plume area until the final actions under the CAP can be implemented. This proposed action is expected to reduce the release of tritium from the southwest plume area to Fourmile Branch between 25 to 35 percent. If this proposed action is undertaken and its effectiveness is demonstrated, it may become a component of the final action in the CAP. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR 1500-1508); and the DOE Regulations for Implementing NEPA (10 CFR 1021). NEPA requires the assessment of environmental consequences of Federal actions that may affect the quality of the human environment. Based on the potential for impacts described herein, DOE will either publish a Finding of No Significant Impact (FONSI) or prepare an environmental impact statement (EM).

Clear Creek Dam Rehabilitation, Yakima Project, Washington

Clear Creek Dam Rehabilitation, Yakima Project, Washington PDF Author: United States. Bureau of Reclamation. Pacific Northwest Region
Publisher:
ISBN:
Category : Dam safety
Languages : en
Pages : 67

Get Book Here

Book Description


Environmental Assessment -- Test Area North Pool Stabilization Project Update

Environmental Assessment -- Test Area North Pool Stabilization Project Update PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 36

Get Book Here

Book Description
The purpose of this Environmental Assessment (EA) is to update the ''Test Area North Pool Stabilization Project'' EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped from the EA/FONSI issued May 6, 1996. A new drying process was subsequently developed and is analyzed in Section 2.1.2 of this document. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.

Echo Dam, Weber River Project, Summit County, Utah, Safety of Dams Modification, Environmental Assessment and Finding of No Significant Impact, PRO-EA-05-003

Echo Dam, Weber River Project, Summit County, Utah, Safety of Dams Modification, Environmental Assessment and Finding of No Significant Impact, PRO-EA-05-003 PDF Author: United States. Bureau of Reclamation. Provo Area Office
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 51

Get Book Here

Book Description


Ein unkanntes Werk Angelo Gallis

Ein unkanntes Werk Angelo Gallis PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 138

Get Book Here

Book Description


DOE/FERC.

DOE/FERC. PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 192

Get Book Here

Book Description