Corte Madera Creek Flood Control Project, Marin County, Statement of Findings

Corte Madera Creek Flood Control Project, Marin County, Statement of Findings PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 14

Get Book

Book Description

Corte Madera Creek Flood Control Project, Marin County, Statement of Findings

Corte Madera Creek Flood Control Project, Marin County, Statement of Findings PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 14

Get Book

Book Description


Corte Madera Creek Flood Control Project, Marin County

Corte Madera Creek Flood Control Project, Marin County PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 184

Get Book

Book Description


Final Environmental Impact Statement

Final Environmental Impact Statement PDF Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category : Corte Madera Creek (Calif.)
Languages : en
Pages : 228

Get Book

Book Description


Corte Madera Creek Flood Control Project, Unit 4, Town of Ross, Marin County, California

Corte Madera Creek Flood Control Project, Unit 4, Town of Ross, Marin County, California PDF Author:
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 176

Get Book

Book Description


Interim Operation and Maintenance Manual

Interim Operation and Maintenance Manual PDF Author:
Publisher:
ISBN:
Category : Corte Madera Creek (Marin County, Calif.)
Languages : en
Pages : 26

Get Book

Book Description


Corte Madera Creek, Marin County, California, Modified Unit 4 Sedimentation Study

Corte Madera Creek, Marin County, California, Modified Unit 4 Sedimentation Study PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0

Get Book

Book Description
Sediment deposition occurs in the lower reaches of the concrete-lined Corte Madera Creek flood control channel because the elevation of the channel bottom is below sea level. These sediment deposits, combined with the presence of tube worms and barnacles on the channel walls, reduce the flood-carrying capacity of the channel. The upstream portion of the original flood control project was not completed and flood flows above 3,000 cfs are not contained in the natural channel upstream. Thus, there is reduced flow competency to carry the coarse sediment load delivered by flood flows. With annual maintenance and upstream containment of breakout flows, most of the sediment deposited in the concrete channel from seasonal antecedent flow can be washed out by the time the flood peak occurs. An HEC-6 numerical sedimentation model study was conducted to evaluate several alternative plans to provide flood containment and sediment storage while also maintaining the natural characteristics of the upstream channel.

Corte Madera Creek Flood Control Project, Marin County

Corte Madera Creek Flood Control Project, Marin County PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 104

Get Book

Book Description


Corte Madera Creek Flood Control Project Unit 4, Town of Ross, Marin County, California

Corte Madera Creek Flood Control Project Unit 4, Town of Ross, Marin County, California PDF Author:
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 114

Get Book

Book Description


Managing Flood Risk

Managing Flood Risk PDF Author: Anna Serra-Llobet
Publisher: Springer
ISBN: 3319716735
Category : Science
Languages : en
Pages : 164

Get Book

Book Description
The past half century has seen an evolution in thinking from ‘flood control’ to ‘flood risk management’, recognizing that risk results from both hazard and vulnerability. Rather than rely only on engineering structures to reduce flood magnitude or extent, recent policies emphasize avoiding construction in flood-prone areas (or moving people from floodplains), reducing impacts on exposed populations through early warning systems, and insurance to aid in recovery. Implementing this new approach faces many challenges but also offers opportunities for synergies, as described in this book for a range of large floodplain rivers and smaller urban streams across North America and Europe. This book is unique in presenting the voices of those on the front lines of implementing a new paradigm in flood risk management, each river with a unique set of challenges and opportunities derived from its specific geography as well as differences in governance between the American and European contexts.

Corte Madera Creek, Marin County, California, Modified Unit 4 Sedimentation Study

Corte Madera Creek, Marin County, California, Modified Unit 4 Sedimentation Study PDF Author: Ronald R. Copeland
Publisher:
ISBN:
Category : Corte Madera Creek (Calif.)
Languages : en
Pages : 78

Get Book

Book Description