Corridor Location Study for Interstate 73 Through Virginia

Corridor Location Study for Interstate 73 Through Virginia PDF Author: Virginia. Transportation Planning Division
Publisher:
ISBN:
Category : Express highways
Languages : en
Pages : 46

Get Book Here

Book Description

Corridor Location Study for Interstate 73 Through Virginia

Corridor Location Study for Interstate 73 Through Virginia PDF Author: Virginia. Transportation Planning Division
Publisher:
ISBN:
Category : Express highways
Languages : en
Pages : 46

Get Book Here

Book Description


Supplemental Corridor Location Study for I-73 Through Virginia

Supplemental Corridor Location Study for I-73 Through Virginia PDF Author: Virginia. Department of Transportation
Publisher:
ISBN:
Category : Express highways
Languages : en
Pages :

Get Book Here

Book Description


I-73 Location Study Between Roanoke and the North Carolina State Line, Bedford, Botetourt, Franklin, Henry and Roanoke Counties

I-73 Location Study Between Roanoke and the North Carolina State Line, Bedford, Botetourt, Franklin, Henry and Roanoke Counties PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 524

Get Book Here

Book Description


Interstate 73 Economic Impact Analysis

Interstate 73 Economic Impact Analysis PDF Author: James S. Gillespie
Publisher:
ISBN:
Category : Express highways
Languages : en
Pages : 8

Get Book Here

Book Description
The Transportation Planning Division (TPD) of the Virginia Department of Transportation (VDOT) is currently considering seven corridors along which VDOT may build the future Interstate 73. The division describes these seven routes and their variants in a report entitled Possible Interchange Locations/Potential I-73 Corridors (December 1993). The purpose of this technical assistance project is to estimate the impact that construction of I-73 along any one of these corridors would have on the state's economy. The project estimates the economic impact by two different methods. The first method, called the "Exits" method in this report, is undertaken in cooperation with the Virginia Employment Commission (VEC)'s Economic Information Services Division. A published study of development around the interchanges along I-95 in North Carolina forms the basis for predicting the number and types of business establishments that would be attracted to each interchange along each proposed corridor. VEC's IMPLAN computer model uses these predictions to forecast the impact on employment and income for each corridor under consideration. A separate fifteen-page report, An Economic Impact Analysis of the Potential Interstate 73 Corridors (VEC/EISD, February 1994), describes the first method and its results. The second method, called the "Dollar" method in this report, assigns a dollar value to the existing highway net in the localities affected by each of the corridors under consideration; the value is equal to estimated replacement cost. A productivity multiplier or "elasticity" value is selected from the range of such values estimated in recent research efforts. The magnitude of the projected cost for the future I-73 in comparison with the value of the existing road net, together with the chosen elasticity, determines for each corridor an estimate of the impact on taxable sales and adjusted gross income in each locality through which I-73 would pass, and an estimate of the impact on taxable sales and adjusted gross income in the state as a whole. A six-page report, Interstate 73 Economic Impact Analysis Part 2 (VDOT/VTRC, February 1992), describes the second method and its results. This third report summarizes the findings of this project. First it translates the forecasts from the first two reports into equivalent terms so that the forecast quantities can be compared. Next it discusses, and attempts to explain, the evident differences between the forecasts. Finally it suggests using a weighted average of the two sets of forecasts to create a best low-end, middle, and high-end forecast for each potential I-73 corridor from among the numbers generated. Tables V, VI, and VII attached to this report give the low, middle, and high forecasts of each potential corridor's impact on employment, total employee compensation, taxable sales, and adjusted gross income.

Interstate 73 Economic Impact Analysis, Part 2

Interstate 73 Economic Impact Analysis, Part 2 PDF Author: James S. Gillespie
Publisher:
ISBN:
Category : Express highways
Languages : en
Pages : 6

Get Book Here

Book Description
The Transportation Planning Division of the Virginia Department of Transportation (VDOT) is currently considering seven corridors along which VDOT may build the future Interstate 73. The purpose of this technical assistance project is to estimate the impact that construction of I-73 along any one of these corridors would have on the state's economy.

The National Highway System and Ancillary Issues Relating to Highway and Transit Programs

The National Highway System and Ancillary Issues Relating to Highway and Transit Programs PDF Author: United States. Congress. House. Committee on Public Works and Transportation. Subcommittee on Surface Transportation
Publisher:
ISBN:
Category : Federal aid to transportation
Languages : en
Pages : 896

Get Book Here

Book Description


Booker T. Washington National Monument, General Management Plan

Booker T. Washington National Monument, General Management Plan PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 250

Get Book Here

Book Description


General Management Plan

General Management Plan PDF Author:
Publisher:
ISBN:
Category : Grasslands
Languages : en
Pages : 256

Get Book Here

Book Description


APCo 765 KV Transmission Line

APCo 765 KV Transmission Line PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 692

Get Book Here

Book Description


Federal Register

Federal Register PDF Author:
Publisher:
ISBN:
Category : Administrative law
Languages : en
Pages : 900

Get Book Here

Book Description