Advanced Light Water Reactor Utility Requirements Document: ALWR evolutionary plant

Advanced Light Water Reactor Utility Requirements Document: ALWR evolutionary plant PDF Author:
Publisher:
ISBN:
Category : Nuclear engineering
Languages : en
Pages :

Get Book Here

Book Description

Advanced Light Water Reactor Utility Requirements Document: ALWR evolutionary plant

Advanced Light Water Reactor Utility Requirements Document: ALWR evolutionary plant PDF Author:
Publisher:
ISBN:
Category : Nuclear engineering
Languages : en
Pages :

Get Book Here

Book Description


NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document. Passive Plant Designs, Chapters 2-13, Project Number 669

NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document. Passive Plant Designs, Chapters 2-13, Project Number 669 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 634

Get Book Here

Book Description
The Electric Power Research Institute (EPRI) is preparing a compendium of technical requirements, referred to as the {open_quotes}Advanced Light Water Reactor [ALWR] Utility Requirements Document{close_quotes}, that is acceptable to the design of an ALWR power plant. When completed, this document is intended to be a comprehensive statement of utility requirements for the design, construction, and performance of an ALWR power plant for the 1990s and beyond. The Requirements Document consists of three volumes. Volume I, {open_quotes}ALWR Policy and Summary of Top-Tier Requirements{close_quotes}, is a management-level synopsis of the Requirements Document, including the design objectives and philosophy, the overall physical configuration and features of a future nuclear plant design, and the steps necessary to take the proposed ALWR design criteria beyond the conceptual design state to a completed, functioning power plant. Volume II consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant [approximately 1350 megawatts-electric (MWe)]. Volume III contains utility design requirements for nuclear plants for which passive features will be used in their designs (approximately 600 MWe). In April 1992, the staff of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, issued Volume 1 and Volume 2 (Parts 1 and 2) of its safety evaluation report (SER) to document the results of its review of Volumes 1 and 2 of the Requirements Document. Volume 1, {open_quotes}NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Program Summary{close_quotes}, provided a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review.

NRC Review of Electric Power Research Institutes̀ Advanced Light Water Reactor Utility Requirements Document. Passive Plant Designs, Chapter 1, Project Number 669

NRC Review of Electric Power Research Institutes̀ Advanced Light Water Reactor Utility Requirements Document. Passive Plant Designs, Chapter 1, Project Number 669 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 555

Get Book Here

Book Description
The Electric Power Research Institute (EPRI) is preparing a compendium of technical requirements, referred to as the {open_quotes}Advanced Light Water Reactor [ALWR] Utility Requirements Document{close_quotes}, that is acceptable to the design of an ALWR power plant. When completed, this document is intended to be a comprehensive statement of utility requirements for the design, construction, and performance of an ALWR power plant for the 1990s and beyond. The Requirements Document consists of three volumes. Volume 1, {open_quotes}ALWR Policy and Summary of Top-Tier Requirements{close_quotes}, is a management-level synopsis of the Requirements Document, including the design objectives and philosophy, the overall physical configuration and features of a future nuclear plant design, and the steps necessary to take the proposed ALWR design criteria beyond the conceptual design state to a completed, functioning power plant. Volume II consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant [approximately 1350 megawatts-electric (MWe)]. Volume III contains utility design requirements for nuclear plants for which passive features will be used in their designs (approximately 600 MWe). In April 1992, the staff of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, issued Volume 1 and Volume 2 (Parts 1 and 2) of its safety evaluation report (SER) to document the results of its review of Volumes 1 and 2 of the Requirements Document. Volume 1, {open_quotes}NRC Review of Electric Power Research Institutes̀ Advanced Light Water Reactor Utility Requirements Document - Program Summary{close_quotes}, provided a discussion of the overall purpose and scope of the Requirements Document, the background of the staffs̀ review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review.

NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document: Evolutionary plant designs

NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document: Evolutionary plant designs PDF Author:
Publisher:
ISBN:
Category : Light water reactors
Languages : en
Pages :

Get Book Here

Book Description


Advanced Light Water Reactor Utility Requirements Document: ALWR passive plant

Advanced Light Water Reactor Utility Requirements Document: ALWR passive plant PDF Author:
Publisher:
ISBN:
Category : Nuclear engineering
Languages : en
Pages :

Get Book Here

Book Description


Advanced Light Water Reactor Utility Requirements Document

Advanced Light Water Reactor Utility Requirements Document PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 24

Get Book Here

Book Description
The ALWR Requirements Document is a primary work product of the EPRI Program. This document is an extensive compilation of the utility requirements for design, construction and performance of advanced light water reactor power plants for the 1990s and beyond. The Requirements Document's primary emphasis is on resolution of significant problems experienced at existing nuclear power plants. It is intended to be used with companion documents, such as utility procurement specifications, which would cover the remaining detailed technical requirements applicable to new plant projects. The ALWR Requirements Document consists of several major parts. This volume is Part I, The Executive Summary. It is intended to serve as a concise, management level synopsis of advanced light water reactors including design objectives and philosophy, overall configuration and features and the steps necessary to proceed from the conceptual design stage to a completed, functioning power plant.

Advanced Light Water Reactor Utility Requirements Document. Part 1, Executive Summary

Advanced Light Water Reactor Utility Requirements Document. Part 1, Executive Summary PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 24

Get Book Here

Book Description
The ALWR Requirements Document is a primary work product of the EPRI Program. This document is an extensive compilation of the utility requirements for design, construction and performance of advanced light water reactor power plants for the 1990s and beyond. The Requirements Document's primary emphasis is on resolution of significant problems experienced at existing nuclear power plants. It is intended to be used with companion documents, such as utility procurement specifications, which would cover the remaining detailed technical requirements applicable to new plant projects. The ALWR Requirements Document consists of several major parts. This volume is Part I, The Executive Summary. It is intended to serve as a concise, management level synopsis of advanced light water reactors including design objectives and philosophy, overall configuration and features and the steps necessary to proceed from the conceptual design stage to a completed, functioning power plant.

Advanced Light Water Reactor : utility requirements document : volume 1 : ALWR policy and summary of top-tier requirements

Advanced Light Water Reactor : utility requirements document : volume 1 : ALWR policy and summary of top-tier requirements PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0

Get Book Here

Book Description


Advanced Light Water Reactor Plants System 80+{trademark} Design Certification Program. Annual Progress Report, October 1, 1992--September 30, 1993

Advanced Light Water Reactor Plants System 80+{trademark} Design Certification Program. Annual Progress Report, October 1, 1992--September 30, 1993 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 34

Get Book Here

Book Description
The purpose of this report is to provide a status of the progress that was made towards Design Certification of System 80+{trademark} during the US government's 1993 fiscal year. The System 80+ Advanced Light Water Reactor (ALWR) is a 3931 MW{sub t} (1350 MWe) Pressurized Water Reactor (PWR). The design consists of an essentially complete plant. It is based on evolutionary improvements to the Standardized System 80 nuclear steam supply system in operation at Palo Verde Units 1, 2, and 3, and the Duke Power Company P-81 balance-of-plant (BOP) that was designed and partially constructed at the Cherokee plant site. The System 80/P-81 original design has been substantially enhanced to increase conformance with the EPRI ALWR Utility Requirements Document (URD). Some design enhancements incorporated in the System 80+ design are included in the four units currently under construction in the Republic of Korea. These units form the basis of the Korean standardization program. The full System 80+ standard design has been offered to the Republic of China, in response to their recent bid specification. The ABB-CE Standard Safety Analysis Report (CESSAR-DC) was submitted to the NRC and a Draft Safety Evaluation Report was issued by the NRC in October 1992. CESSAR-DC contains the technical basis for compliance with the EPRI URD for simplified emergency planning. The Nuclear Steam Supply System (NSSS) is the standard ABB-Combustion Engineering two-loop arrangement with two steam generators, two hot legs and four cold legs each with a reactor coolant pump. The System 80+ standard plant includes a sperical steel containment vessel which is enclosed in a concrete shield building, thus providing the safety advantages of a dual containment.

Advanced Reactors R & D and New Generation Nuclear Electric Powerplants

Advanced Reactors R & D and New Generation Nuclear Electric Powerplants PDF Author: United States. Congress. House. Committee on Science, Space, and Technology. Subcommittee on Energy Research and Development
Publisher:
ISBN:
Category : Electric power-plants
Languages : en
Pages : 264

Get Book Here

Book Description