Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans PDF Author: Ronald O'Rourke
Publisher: DIANE Publishing
ISBN: 1437919596
Category : Technology & Engineering
Languages : en
Pages : 43

Get Book Here

Book Description
Discusses the U.S. Navy¿s proposed FY 2010 budget requests funding for eight new Navy ships. This total includes two relatively expensive, high-capability combatant ships (a Virginia-class attack submarine and a DDG-51 class Aegis destroyer) and six relatively inexpensive ships (three Littoral Combat Ships [LCSs], two TAKE-1 auxiliary dry cargo ships, and one Joint High Speed Vessel [JHSV]). Concerns about the Navy¿s prospective ability to afford its long-range shipbuilding plan, combined with year-to-year changes in Navy shipbuilding plans and significant cost growth and other problems in building certain new Navy ships, have led to concerns about the status of Navy shipbuilding and the potential future size and capabilities of the fleet. Illus.

Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans PDF Author: Ronald O'Rourke
Publisher: DIANE Publishing
ISBN: 1437919596
Category : Technology & Engineering
Languages : en
Pages : 43

Get Book Here

Book Description
Discusses the U.S. Navy¿s proposed FY 2010 budget requests funding for eight new Navy ships. This total includes two relatively expensive, high-capability combatant ships (a Virginia-class attack submarine and a DDG-51 class Aegis destroyer) and six relatively inexpensive ships (three Littoral Combat Ships [LCSs], two TAKE-1 auxiliary dry cargo ships, and one Joint High Speed Vessel [JHSV]). Concerns about the Navy¿s prospective ability to afford its long-range shipbuilding plan, combined with year-to-year changes in Navy shipbuilding plans and significant cost growth and other problems in building certain new Navy ships, have led to concerns about the status of Navy shipbuilding and the potential future size and capabilities of the fleet. Illus.

Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans PDF Author: Ronald O'Rourke
Publisher:
ISBN: 9781542945417
Category :
Languages : en
Pages :

Get Book Here

Book Description
The current and planned size and composition of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy's shipbuilding plans have been oversight matters for the congressional defense committees for many years. On December 15, 2016, the Navy released a new force-structure goal that calls for achieving and maintaining a fleet of 355 ships of certain types and numbers. Key points about this new 355-ship force-level goal include the following: -- The 355-ship force-level goal is the result of a new Force Structure Assessment (FSA) conducted by the Navy. An FSA is an analysis in which the Navy solicits inputs from U.S. regional combatant commanders (CCDRs) regarding the types and amounts of Navy capabilities that CCDRs deem necessary for implementing the Navy's portion of the national military strategy, and then translates those CCDR inputs into required numbers of ships, using current and projected Navy ship types. The analysis takes into account Navy capabilities for both warfighting and day-to-day forward-deployed presence. The Navy conducts an FSA every few years, as circumstances require, to determine its force-structure goal. -- The new 355-ship force-level goal replaces a 308-ship force-level goal that the Navy released in March 2015. The actual size of the Navy in recent years has generally been between 270 and 290 ships. -- The figure of 355 ships appears close to an objective of building toward a fleet of 350 ships that was announced by the Trump campaign organization during the 2016 presidential election campaign. The 355-ship goal, however, reflects the national security strategy and national military strategy that were in place in 2016 (i.e., the Obama Administration's national security strategy and national military strategy). A January 27, 2017, national security presidential memorandum on rebuilding the U.S. armed forces signed by President Trump states: "Upon transmission of a new National Security Strategy to Congress, the Secretary [of Defense] shall produce a National Defense Strategy (NDS). The goal of the NDS shall be to give the President and the Secretary maximum strategic flexibility and to determine the force structure necessary to meet requirements." -- Although the 355-ship plan includes 47 more ships than the previous 308-ship plan, CRS notionally estimates that achieving and maintaining the 355-ship fleet could require adding 57 to 67 ships, including 19 attack submarines and 23 large surface combatants, to the Navy's FY2017 30-year shipbuilding plan, unless the Navy extends the service lives of existing ships beyond currently planned figures and/or reactivates recently retired ships. -- CRS estimates that procuring the 57 to 67 ships that might need to be added the 30-year shipbuilding plan to achieve and maintain a 355-ship fleet - a total that equates an average of about 1.9 to 2.2 additional ships per year over the 30-year period - could cost an average of roughly $4.6 billion to $5.1 billion per year in additional shipbuilding funds over the 30-year period, using today's shipbuilding costs. These additional shipbuilding funds are only a fraction of the total additional cost that would be needed to achieve and maintain a 355-ship fleet instead of 308-ship fleet. -- If defense spending in coming years is not increased above the caps established in the Budget Control Act of 2011, or BCA (S. 365/P.L. 112-25 of August 2, 2011), as amended, achieving and maintaining a 355-ship fleet could require reducing funding levels for other DOD programs. -- Navy officials have stated that, in general, the shipbuilding industrial base has the capacity to take on the additional shipbuilding work needed to achieve and maintain a 355-ship fleet, and that building toward the 355-ship goal sooner rather than later would be facilitated by ramping up production of existing ship designs rather than developing and then starting production of new designs.

Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans PDF Author: Ronald O'Rourke
Publisher:
ISBN:
Category :
Languages : en
Pages : 145

Get Book Here

Book Description
Updated 12/10/2020: In December 2016, the Navy released a force-structure goal that callsfor achieving and maintaining a fleet of 355 ships of certain types and numbers. The 355-shipgoal was made U.S. policy by Section 1025 of the FY2018 National Defense AuthorizationAct (H.R. 2810/P.L. 115- 91 of December 12, 2017). The Navy and the Department of Defense(DOD) have been working since 2019 to develop a successor for the 355-ship force-level goal.The new goal is expected to introduce a new, more distributed fleet architecture featuring asmaller proportion of larger ships, a larger proportion of smaller ships, and a new third tier oflarge unmanned vehicles (UVs). On December 9, 2020, the Trump Administration released a document that can beviewed as its vision for future Navy force structure and/or a draft version of the FY202230-year Navy shipbuilding plan. The document presents a Navy force-level goal that callsfor achieving by 2045 a Navy with a more distributed fleet architecture, 382 to 446 mannedships, and 143 to 242 large UVs. The Administration that takes office on January 20, 2021,is required by law to release the FY2022 30-year Navy shipbuilding plan in connection withDOD's proposed FY2022 budget, which will be submitted to Congress in 2021. In preparingthe FY2022 30-year shipbuilding plan, the Administration that takes office on January 20,2021, may choose to adopt, revise, or set aside the document that was released on December9, 2020. The Navy states that its original FY2021 budget submission requests the procurement ofeight new ships, but this figure includes LPD-31, an LPD-17 Flight II amphibious ship thatCongress procured (i.e., authorized and appropriated procurement funding for) in FY2020.Excluding this ship, the Navy's original FY2021 budget submission requests the procurementof seven new ships rather than eight. In late November 2020, the Trump Administrationreportedly decided to request the procurement of a second Virginia-class attack submarinein FY2021. CRS as of December 10, 2020, had not received any documentation from theAdministration detailing the exact changes to the Virginia-class program funding linesthat would result from this reported change. Pending the delivery of that information fromthe administration, this CRS report continues to use the Navy's original FY2021 budgetsubmission in its tables and narrative discussions.

U. S. Navy Shipbuilding

U. S. Navy Shipbuilding PDF Author: Gladys Clemens
Publisher: Nova Science Publishers
ISBN: 9781631171130
Category : Military planning
Languages : en
Pages : 0

Get Book Here

Book Description
This book provides background information and presents potential issues for Congress concerning the Navy's ship force-structure goals and shipbuilding plans. It also discusses, among other issues, quality problems in constructing recently delivered ships and Navy actions to improve quality and key practices employed by leading commercial ship buyers and shipbuilders to ensure quality and how these compared with Navy practices.

Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans PDF Author: O'Rourke
Publisher: CreateSpace
ISBN: 9781505432046
Category : Political Science
Languages : en
Pages : 60

Get Book Here

Book Description
This report provides background information and presents potential issues for Congress concerning the Navy's ship force-structure goals and shipbuilding plans. The planned size of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy's shipbuilding plans have been matters of concern for the congressional defense committees for the past several years. Decisions that Congress makes on Navy shipbuilding programs can substantially affect Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base.

Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans PDF Author: Ronald O'Rourke
Publisher:
ISBN:
Category : Sea-power
Languages : en
Pages : 59

Get Book Here

Book Description
The Navy in February 2006 proposed to maintain in coming years a fleet of 313 ships, including, among other things, 11 aircraft carriers, 48 attack submarines (SSNs), 88 cruisers and destroyers, 55 Littoral Combat Ships (LCSs), 31 amphibious ships, and a Maritime Prepositioning Force (Future), or MPF(F), squadron with 12 new-construction amphibious and sealift-type ships. The Navy says that for its shipbuilding plans to be affordable and executable, the Navy needs to control certain non-shipbuilding expenditures and build ships within estimated costs. The Navy's shipbuilding plans raise potential issues regarding the shipbuilding industrial base, particularly in the areas of the submarine design and engineering base, and the surface combatant construction base.

Navy Shipbuilding Acquisition Programs and Budget Requirements of the Navy's Shipbuilding and Construction Plan

Navy Shipbuilding Acquisition Programs and Budget Requirements of the Navy's Shipbuilding and Construction Plan PDF Author: United States. Congress. House. Committee on Armed Services. Subcommittee on Seapower and Projection Forces
Publisher:
ISBN:
Category : Shipbuilding
Languages : en
Pages : 160

Get Book Here

Book Description


U.S. Navy Shipbuilding Plans

U.S. Navy Shipbuilding Plans PDF Author: Brandon Carmichael
Publisher:
ISBN: 9781621006947
Category : Shipbuilding
Languages : en
Pages : 0

Get Book Here

Book Description
This book provides background information and presents potential issues for Congress concerning the Navy's ship force-structure goals and shipbuilding plans. The planned size of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy's shipbuilding plans have been matters of concern for the congressional defence committees for the past several years. Decisions that Congress makes on Navy shipbuilding programs can substantially affect Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base.

The Navy's 30-year Shipbuilding Plan

The Navy's 30-year Shipbuilding Plan PDF Author: United States. Congress. House. Committee on Armed Services. Oversight and Investigations Subcommittee
Publisher:
ISBN:
Category : Sea-power
Languages : en
Pages : 78

Get Book Here

Book Description


Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 28

Get Book Here

Book Description
In February 2008, as part of its proposed FY2009 budget, the Navy submitted to Congress the FY2009 version of its annual 30-year shipbuilding plan. The 30-year plan is intended to support the Navy's goal of achieving and maintaining a 313-ship fleet. The Navy first presented the 313-ship plan to Congress in February 2006. The increase in the Navy's estimated cost for implementing the plan is so large that the Navy no longer appears to have a clearly identifiable, announced strategy for generating the funds needed to implement the 30-year plan, at least not without significantly reducing funding for other Navy programs or increasing the Navy's programmed budget in coming years by billions of dollars per year. Concerns about the Navy's prospective ability to afford the 30-year shipbuilding plan, combined with year-to-year changes in Navy shipbuilding plans and significant cost growth and other problems in building certain new Navy ships, have led to strong concerns among some Members about the status of Navy shipbuilding and the potential future size and capabilities of the fleet. As a consequence of these strong concerns, some Members in hearings this year on the Navy's proposed FY2009 budget have strongly criticized aspects of the Navy's shipbuilding plan and indicated that they are considering making changes to the plan. Some Members in the House, for example, have indicated that they are considering the option of not procuring a third DDG-1000 class destroyer in FY2009, as the Navy has requested, and using the funding programmed for that ship to instead procure other kinds of ships for the Navy. This report will be updated as events warrant.