Thermopolis-Alcova-Casper Transmission Line Project

Thermopolis-Alcova-Casper Transmission Line Project PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 220

Get Book Here

Book Description

Thermopolis-Alcova-Casper Transmission Line Project

Thermopolis-Alcova-Casper Transmission Line Project PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 220

Get Book Here

Book Description


Thermopolis-Alcova-Casper Transmission Line Project Wyoming

Thermopolis-Alcova-Casper Transmission Line Project Wyoming PDF Author:
Publisher:
ISBN:
Category : Electric lines
Languages : en
Pages : 350

Get Book Here

Book Description


Casper to Dave Johnson 230-kV Transmission Line Project

Casper to Dave Johnson 230-kV Transmission Line Project PDF Author:
Publisher:
ISBN:
Category : Electric lines
Languages : en
Pages : 146

Get Book Here

Book Description


Thermopolis-Alcova-Casper Transmission Line Project Wyoming: Maps and Tables

Thermopolis-Alcova-Casper Transmission Line Project Wyoming: Maps and Tables PDF Author:
Publisher:
ISBN:
Category : Electric lines
Languages : en
Pages : 0

Get Book Here

Book Description
This EIS assesses the environmental effects of constructing 152.1 miles of 230-kV or 230/345-kV transmission line between Thermopolis and Alcova, and between Alcova and Casper. Approximately 136.1 miles of the new 230-kV or 230/345-kV line will either replace two existing but deteriorated 69-kV lines or parallel an existing 115-kV line. The remaining 16.0 miles of line will be constructed on a new corridor. In addition, approximately 50.0 miles of 69-kV line will be reconstructed at 69/115-kV between Arminto and Casper. Other minor elements of the project include construction of short 34.5-kV and 69/115-kV connecting lines, and a new substation near Alcova. The purpose of the project is to bring the regional transmission system into compliance with National Electric Reliability Council criteria and to reduce energy losses associated with overloading of the existing system. Alternatives assessed include no action, delay, reduction in the quality of electrical service, alternative transmission technologies, alternative design, and alternative routes. Significant impacts include soil disturbance and increased erosion, potential disturbance of sensitive habitats for sage grouse, bald eagles and raptors, and increased visual impacts created by the replacement of small, wood structures with larger transmission structures.

Annual Report

Annual Report PDF Author: United States. Western Area Power Administration
Publisher:
ISBN:
Category : Electric utilities
Languages : en
Pages : 826

Get Book Here

Book Description


Energy and Water Development Appropriations for 1983

Energy and Water Development Appropriations for 1983 PDF Author: United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 1472

Get Book Here

Book Description


Congressional Budget Request

Congressional Budget Request PDF Author: United States. Department of Energy
Publisher:
ISBN:
Category : Energy conservation
Languages : en
Pages : 260

Get Book Here

Book Description


Energy and water development appropriations for fiscal year 1985

Energy and water development appropriations for fiscal year 1985 PDF Author: United States. Congress. Senate. Committee on Appropriations. Subcommittee on Energy and Water Development
Publisher:
ISBN:
Category :
Languages : en
Pages : 1458

Get Book Here

Book Description


Energy and water development appropriations for 1985

Energy and water development appropriations for 1985 PDF Author: United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 1126

Get Book Here

Book Description


Hearings

Hearings PDF Author: United States. Congress. House
Publisher:
ISBN:
Category :
Languages : en
Pages : 2454

Get Book Here

Book Description