Author: Ronald O'Rourke
Publisher:
ISBN:
Category :
Languages : en
Pages : 145
Book Description
Updated 12/10/2020: In December 2016, the Navy released a force-structure goal that callsfor achieving and maintaining a fleet of 355 ships of certain types and numbers. The 355-shipgoal was made U.S. policy by Section 1025 of the FY2018 National Defense AuthorizationAct (H.R. 2810/P.L. 115- 91 of December 12, 2017). The Navy and the Department of Defense(DOD) have been working since 2019 to develop a successor for the 355-ship force-level goal.The new goal is expected to introduce a new, more distributed fleet architecture featuring asmaller proportion of larger ships, a larger proportion of smaller ships, and a new third tier oflarge unmanned vehicles (UVs). On December 9, 2020, the Trump Administration released a document that can beviewed as its vision for future Navy force structure and/or a draft version of the FY202230-year Navy shipbuilding plan. The document presents a Navy force-level goal that callsfor achieving by 2045 a Navy with a more distributed fleet architecture, 382 to 446 mannedships, and 143 to 242 large UVs. The Administration that takes office on January 20, 2021,is required by law to release the FY2022 30-year Navy shipbuilding plan in connection withDOD's proposed FY2022 budget, which will be submitted to Congress in 2021. In preparingthe FY2022 30-year shipbuilding plan, the Administration that takes office on January 20,2021, may choose to adopt, revise, or set aside the document that was released on December9, 2020. The Navy states that its original FY2021 budget submission requests the procurement ofeight new ships, but this figure includes LPD-31, an LPD-17 Flight II amphibious ship thatCongress procured (i.e., authorized and appropriated procurement funding for) in FY2020.Excluding this ship, the Navy's original FY2021 budget submission requests the procurementof seven new ships rather than eight. In late November 2020, the Trump Administrationreportedly decided to request the procurement of a second Virginia-class attack submarinein FY2021. CRS as of December 10, 2020, had not received any documentation from theAdministration detailing the exact changes to the Virginia-class program funding linesthat would result from this reported change. Pending the delivery of that information fromthe administration, this CRS report continues to use the Navy's original FY2021 budgetsubmission in its tables and narrative discussions.
Navy Force Structure and Shipbuilding Plans
Author: Ronald O'Rourke
Publisher:
ISBN:
Category :
Languages : en
Pages : 145
Book Description
Updated 12/10/2020: In December 2016, the Navy released a force-structure goal that callsfor achieving and maintaining a fleet of 355 ships of certain types and numbers. The 355-shipgoal was made U.S. policy by Section 1025 of the FY2018 National Defense AuthorizationAct (H.R. 2810/P.L. 115- 91 of December 12, 2017). The Navy and the Department of Defense(DOD) have been working since 2019 to develop a successor for the 355-ship force-level goal.The new goal is expected to introduce a new, more distributed fleet architecture featuring asmaller proportion of larger ships, a larger proportion of smaller ships, and a new third tier oflarge unmanned vehicles (UVs). On December 9, 2020, the Trump Administration released a document that can beviewed as its vision for future Navy force structure and/or a draft version of the FY202230-year Navy shipbuilding plan. The document presents a Navy force-level goal that callsfor achieving by 2045 a Navy with a more distributed fleet architecture, 382 to 446 mannedships, and 143 to 242 large UVs. The Administration that takes office on January 20, 2021,is required by law to release the FY2022 30-year Navy shipbuilding plan in connection withDOD's proposed FY2022 budget, which will be submitted to Congress in 2021. In preparingthe FY2022 30-year shipbuilding plan, the Administration that takes office on January 20,2021, may choose to adopt, revise, or set aside the document that was released on December9, 2020. The Navy states that its original FY2021 budget submission requests the procurement ofeight new ships, but this figure includes LPD-31, an LPD-17 Flight II amphibious ship thatCongress procured (i.e., authorized and appropriated procurement funding for) in FY2020.Excluding this ship, the Navy's original FY2021 budget submission requests the procurementof seven new ships rather than eight. In late November 2020, the Trump Administrationreportedly decided to request the procurement of a second Virginia-class attack submarinein FY2021. CRS as of December 10, 2020, had not received any documentation from theAdministration detailing the exact changes to the Virginia-class program funding linesthat would result from this reported change. Pending the delivery of that information fromthe administration, this CRS report continues to use the Navy's original FY2021 budgetsubmission in its tables and narrative discussions.
Publisher:
ISBN:
Category :
Languages : en
Pages : 145
Book Description
Updated 12/10/2020: In December 2016, the Navy released a force-structure goal that callsfor achieving and maintaining a fleet of 355 ships of certain types and numbers. The 355-shipgoal was made U.S. policy by Section 1025 of the FY2018 National Defense AuthorizationAct (H.R. 2810/P.L. 115- 91 of December 12, 2017). The Navy and the Department of Defense(DOD) have been working since 2019 to develop a successor for the 355-ship force-level goal.The new goal is expected to introduce a new, more distributed fleet architecture featuring asmaller proportion of larger ships, a larger proportion of smaller ships, and a new third tier oflarge unmanned vehicles (UVs). On December 9, 2020, the Trump Administration released a document that can beviewed as its vision for future Navy force structure and/or a draft version of the FY202230-year Navy shipbuilding plan. The document presents a Navy force-level goal that callsfor achieving by 2045 a Navy with a more distributed fleet architecture, 382 to 446 mannedships, and 143 to 242 large UVs. The Administration that takes office on January 20, 2021,is required by law to release the FY2022 30-year Navy shipbuilding plan in connection withDOD's proposed FY2022 budget, which will be submitted to Congress in 2021. In preparingthe FY2022 30-year shipbuilding plan, the Administration that takes office on January 20,2021, may choose to adopt, revise, or set aside the document that was released on December9, 2020. The Navy states that its original FY2021 budget submission requests the procurement ofeight new ships, but this figure includes LPD-31, an LPD-17 Flight II amphibious ship thatCongress procured (i.e., authorized and appropriated procurement funding for) in FY2020.Excluding this ship, the Navy's original FY2021 budget submission requests the procurementof seven new ships rather than eight. In late November 2020, the Trump Administrationreportedly decided to request the procurement of a second Virginia-class attack submarinein FY2021. CRS as of December 10, 2020, had not received any documentation from theAdministration detailing the exact changes to the Virginia-class program funding linesthat would result from this reported change. Pending the delivery of that information fromthe administration, this CRS report continues to use the Navy's original FY2021 budgetsubmission in its tables and narrative discussions.
Guidelines on Fatigue
Author: International Maritime Organization
Publisher: IMO Publishing
ISBN: 9789280151282
Category : Fatigue
Languages : en
Pages : 124
Book Description
To assist in the development of a marine safety culture by addressing the issue of fatigue, the IMO has developed practical guidance to assist interested parties to better understand and manage the issue of "fatigue".
Publisher: IMO Publishing
ISBN: 9789280151282
Category : Fatigue
Languages : en
Pages : 124
Book Description
To assist in the development of a marine safety culture by addressing the issue of fatigue, the IMO has developed practical guidance to assist interested parties to better understand and manage the issue of "fatigue".
Ship Production
Author: Richard Lee Storch
Publisher: Cornell Maritime Press/Tidewater Publishers
ISBN: 9780870334610
Category : Shipbuilding
Languages : en
Pages : 0
Book Description
Revised and updated (1st ed., 1988) to reflect current information and practice in the shipbuilding industry, this text/reference describes the principles and practice of ship production employing group technology. The system described is a mix of old and new techniques, aimed at optimizing producti
Publisher: Cornell Maritime Press/Tidewater Publishers
ISBN: 9780870334610
Category : Shipbuilding
Languages : en
Pages : 0
Book Description
Revised and updated (1st ed., 1988) to reflect current information and practice in the shipbuilding industry, this text/reference describes the principles and practice of ship production employing group technology. The system described is a mix of old and new techniques, aimed at optimizing producti
Shipyard Industry
Author: United States. Occupational Safety and Health Administration
Publisher:
ISBN:
Category : Shipbuilding industry
Languages : en
Pages : 306
Book Description
Publisher:
ISBN:
Category : Shipbuilding industry
Languages : en
Pages : 306
Book Description
The National Shipbuilding Research Program
Author: National Shipbuilding Research Program
Publisher:
ISBN:
Category : Shipbuilding
Languages : en
Pages : 24
Book Description
Publisher:
ISBN:
Category : Shipbuilding
Languages : en
Pages : 24
Book Description
The Ocean Economy in 2030
Author: OECD
Publisher: OECD Publishing
ISBN: 9264251723
Category :
Languages : en
Pages : 256
Book Description
This report explores the growth prospects for the ocean economy, its capacity for future employment creation and innovation, and its role in addressing global challenges. Special attention is devoted to the emerging ocean-based industries.
Publisher: OECD Publishing
ISBN: 9264251723
Category :
Languages : en
Pages : 256
Book Description
This report explores the growth prospects for the ocean economy, its capacity for future employment creation and innovation, and its role in addressing global challenges. Special attention is devoted to the emerging ocean-based industries.
Australia's Naval Shipbuilding Enterprise
Author: J. L. Birkler
Publisher: Rand Corporation
ISBN:
Category : History
Languages : en
Pages : 0
Book Description
In 2015, the Australian government will produce a new Defence White Paper to outline revised and refined defense objectives. As it prepares the new report, a basic question facing the government is whether Australia should buy ships from foreign shipbuilders or support a domestic naval shipbuilding industry. This question is complex, containing many facets and issues that often center on cost trade-offs and economic considerations, but that also touch upon important national and strategic concerns.
Publisher: Rand Corporation
ISBN:
Category : History
Languages : en
Pages : 0
Book Description
In 2015, the Australian government will produce a new Defence White Paper to outline revised and refined defense objectives. As it prepares the new report, a basic question facing the government is whether Australia should buy ships from foreign shipbuilders or support a domestic naval shipbuilding industry. This question is complex, containing many facets and issues that often center on cost trade-offs and economic considerations, but that also touch upon important national and strategic concerns.
Marine Safety Manual
Author: United States. Coast Guard
Publisher:
ISBN:
Category : Environmental protection
Languages : en
Pages : 402
Book Description
Publisher:
ISBN:
Category : Environmental protection
Languages : en
Pages : 402
Book Description
Assessment of Surface Ship Maintenance Requirements
Author: Robert Button
Publisher: Rand Corporation
ISBN:
Category : Warships
Languages : en
Pages : 0
Book Description
The Department of Defense is likely to face years of declining resources as the U.S. government grapples with fiscal challenges. These challenges affect every account, including those associated with surface ship maintenance and operations. At the same time, there has been widespread concern that surface ship materiel readiness is declining due to a high pace of operations and a sense that there have been many instances of deferred maintenance. The need to balance fiscal reality and a continued need for ready ships is likely to be an ongoing challenge. At the request of the Assessment Division of the Office of the Chief of Naval Operations, this report: (1) determines the impact on long-term fleet readiness, Operational Availability (Ao), and Expected Service Life (ESL) caused by near-term reductions in Operations and Maintenance (O&M) accounts; (2) recommends potential strategies to minimize negative impacts to Ao and ESL and maintain the largest, most capable fleet possible; (3) develops a maintenance requirement concept, per ship class, that supports ESL, but allows for some risk within the maintenance strategy; and (4) defines the risks to Ao and ESL resulting from the new requirement. The methodology could be applicable to multiple ship classes.
Publisher: Rand Corporation
ISBN:
Category : Warships
Languages : en
Pages : 0
Book Description
The Department of Defense is likely to face years of declining resources as the U.S. government grapples with fiscal challenges. These challenges affect every account, including those associated with surface ship maintenance and operations. At the same time, there has been widespread concern that surface ship materiel readiness is declining due to a high pace of operations and a sense that there have been many instances of deferred maintenance. The need to balance fiscal reality and a continued need for ready ships is likely to be an ongoing challenge. At the request of the Assessment Division of the Office of the Chief of Naval Operations, this report: (1) determines the impact on long-term fleet readiness, Operational Availability (Ao), and Expected Service Life (ESL) caused by near-term reductions in Operations and Maintenance (O&M) accounts; (2) recommends potential strategies to minimize negative impacts to Ao and ESL and maintain the largest, most capable fleet possible; (3) develops a maintenance requirement concept, per ship class, that supports ESL, but allows for some risk within the maintenance strategy; and (4) defines the risks to Ao and ESL resulting from the new requirement. The methodology could be applicable to multiple ship classes.
Navy Large Unmanned Surface and Undersea Vehicles
Author: Ronald O'Rourke
Publisher:
ISBN: 9781075833274
Category :
Languages : en
Pages : 30
Book Description
The Navy wants to develop and procure three new types of unmanned vehicles (UVs) in FY2020 and beyond-Large Unmanned Surface Vehicles (LUSVs), Medium Unmanned Surface Vehicles (MUSVs), and Extra-Large Unmanned Undersea Vehicles (XLUUVs). The Navy is requesting $628.8 million in FY2020 research and development funding for these three UV programs and their enabling technologies. The Navy wants to acquire these three types of UVs (which this report refers to collectively as large UVs) as part of an effort to shift the Navy to a new fleet architecture (i.e., a new combination of ships and other platforms) that is more widely distributed than the Navy's current architecture. Compared to the current fleet architecture, this more-distributed architecture is to include proportionately fewer large surface combatants (i.e., cruisers and destroyers), proportionately more small surface combatants (i.e., frigates and Littoral Combat Ships), and the addition of significant numbers of large UVs. The Navy wants to employ accelerated acquisition strategies for procuring these large UVs, so as to get them into service more quickly. The emphasis that the Navy placed on UV programs in its FY2020 budget submission and the Navy's desire to employ accelerated acquisition strategies in acquiring these large UVs together can be viewed as an expression of the urgency that the Navy attaches to fielding large UVs for meeting future military challenges from countries such as China. The LUSV program is a proposed new start project for FY2020. The Navy wants to procure two LUSVs per year in FY2020FY2024. The Navy wants LUSVs to be low-cost, high-endurance, reconfigurable ships based on commercial ship designs, with ample capacity for carrying various modular payloads-particularly anti-surface warfare (ASuW) and strike payloads, meaning principally anti-ship and land-attack missiles. The Navy reportedly envisions LUSVs as being 200 feet to 300 feet in length and having a full load displacement of about 2,000 tons. The MUSV program began in FY2019. The Navy plans to award a contract for the first MUSV in FY2019 and wants to award a contract for the second MUSV in FY2023. The Navy wants MUSVs, like LUSVs, to be low-cost, high-endurance, reconfigurable ships that can accommodate various payloads. Initial payloads for MUSVs are to be intelligence, surveillance and reconnaissance (ISR) payloads and electronic warfare (EW) systems. The Navy defines MUSVs as having a length of between 12 meters (about 39 feet) and 50 meters (about 164 feet). The Navy wants to pursue the MUSV program as a rapid prototyping effort under what is known as Section 804 acquisition authority. The XLUUV program, also known as Orca, was established to address a Joint Emergent Operational Need (JEON). The Navy wants to procure nine XLUUVs in FY2020-FY2024. The Navy announced on February 13, 2019, that it had selected Boeing to fabricate, test, and deliver the first four Orca XLUUVs and associated support elements. On March 27, 2019, the Navy announced that the award to Boeing had been expanded to include the fifth Orca. The Navy's large UV programs pose a number of oversight issues for Congress, including issues relating to the analytical basis for the more-distributed fleet architecture; the Navy's accelerated acquisition strategies and funding method for these programs; technical, schedule, and cost risk in the programs; the proposed annual procurement rates for the programs; the industrial base implications of the programs; the personnel implications of the programs; and whether the Navy has accurately priced the work it is proposing to do in FY2020 on the programs.
Publisher:
ISBN: 9781075833274
Category :
Languages : en
Pages : 30
Book Description
The Navy wants to develop and procure three new types of unmanned vehicles (UVs) in FY2020 and beyond-Large Unmanned Surface Vehicles (LUSVs), Medium Unmanned Surface Vehicles (MUSVs), and Extra-Large Unmanned Undersea Vehicles (XLUUVs). The Navy is requesting $628.8 million in FY2020 research and development funding for these three UV programs and their enabling technologies. The Navy wants to acquire these three types of UVs (which this report refers to collectively as large UVs) as part of an effort to shift the Navy to a new fleet architecture (i.e., a new combination of ships and other platforms) that is more widely distributed than the Navy's current architecture. Compared to the current fleet architecture, this more-distributed architecture is to include proportionately fewer large surface combatants (i.e., cruisers and destroyers), proportionately more small surface combatants (i.e., frigates and Littoral Combat Ships), and the addition of significant numbers of large UVs. The Navy wants to employ accelerated acquisition strategies for procuring these large UVs, so as to get them into service more quickly. The emphasis that the Navy placed on UV programs in its FY2020 budget submission and the Navy's desire to employ accelerated acquisition strategies in acquiring these large UVs together can be viewed as an expression of the urgency that the Navy attaches to fielding large UVs for meeting future military challenges from countries such as China. The LUSV program is a proposed new start project for FY2020. The Navy wants to procure two LUSVs per year in FY2020FY2024. The Navy wants LUSVs to be low-cost, high-endurance, reconfigurable ships based on commercial ship designs, with ample capacity for carrying various modular payloads-particularly anti-surface warfare (ASuW) and strike payloads, meaning principally anti-ship and land-attack missiles. The Navy reportedly envisions LUSVs as being 200 feet to 300 feet in length and having a full load displacement of about 2,000 tons. The MUSV program began in FY2019. The Navy plans to award a contract for the first MUSV in FY2019 and wants to award a contract for the second MUSV in FY2023. The Navy wants MUSVs, like LUSVs, to be low-cost, high-endurance, reconfigurable ships that can accommodate various payloads. Initial payloads for MUSVs are to be intelligence, surveillance and reconnaissance (ISR) payloads and electronic warfare (EW) systems. The Navy defines MUSVs as having a length of between 12 meters (about 39 feet) and 50 meters (about 164 feet). The Navy wants to pursue the MUSV program as a rapid prototyping effort under what is known as Section 804 acquisition authority. The XLUUV program, also known as Orca, was established to address a Joint Emergent Operational Need (JEON). The Navy wants to procure nine XLUUVs in FY2020-FY2024. The Navy announced on February 13, 2019, that it had selected Boeing to fabricate, test, and deliver the first four Orca XLUUVs and associated support elements. On March 27, 2019, the Navy announced that the award to Boeing had been expanded to include the fifth Orca. The Navy's large UV programs pose a number of oversight issues for Congress, including issues relating to the analytical basis for the more-distributed fleet architecture; the Navy's accelerated acquisition strategies and funding method for these programs; technical, schedule, and cost risk in the programs; the proposed annual procurement rates for the programs; the industrial base implications of the programs; the personnel implications of the programs; and whether the Navy has accurately priced the work it is proposing to do in FY2020 on the programs.