Author: Maher K. Tadros
Publisher: Transportation Research Board
ISBN: 9780309062602
Category : Technology & Engineering
Languages : en
Pages : 64
Book Description
Rapid Replacement of Bridge Decks
Author: Maher K. Tadros
Publisher: Transportation Research Board
ISBN: 9780309062602
Category : Technology & Engineering
Languages : en
Pages : 64
Book Description
Publisher: Transportation Research Board
ISBN: 9780309062602
Category : Technology & Engineering
Languages : en
Pages : 64
Book Description
Rapid Bridge Deck Replacement
Author: Roberto Alejandro Osegueda
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 88
Book Description
This report describes a full-size field demonstration of a rapid bridge deck replacement concept put forward several years ago. The concept was to utilize a sand mortar made with a rapid setting epoxy to provide the shear tie between precast concrete deck panels and existing steel stringer beams. The demonstration site was a 50 ft simple span that serves as part of the SPUR 326 overpass over the AT & SF railroad tracks in downtown Lubbock, Texas. The demonstration bridge is one of two identical bridges, side-by-side; the other was redecked using a conventional poured-in-place technique. Eight precast panels, each 6 ft 3 in. x 45 ft x 8 in., were used to form the experimental deck. Each panel was cast with blockouts (holes) positioned directly over the supporting steel beams. When the original concrete deck was removed, the steel shear studs were cut away leaving the top of the flanges of the steel beams clean and flat. The precast panels were then positioned atop of the steel in an operation lasting less than 5 hours, the new steel studs were welded into place through the blockouts in about 4 hours, and then the panels were epoxied into place in less than 2 full working days.
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 88
Book Description
This report describes a full-size field demonstration of a rapid bridge deck replacement concept put forward several years ago. The concept was to utilize a sand mortar made with a rapid setting epoxy to provide the shear tie between precast concrete deck panels and existing steel stringer beams. The demonstration site was a 50 ft simple span that serves as part of the SPUR 326 overpass over the AT & SF railroad tracks in downtown Lubbock, Texas. The demonstration bridge is one of two identical bridges, side-by-side; the other was redecked using a conventional poured-in-place technique. Eight precast panels, each 6 ft 3 in. x 45 ft x 8 in., were used to form the experimental deck. Each panel was cast with blockouts (holes) positioned directly over the supporting steel beams. When the original concrete deck was removed, the steel shear studs were cut away leaving the top of the flanges of the steel beams clean and flat. The precast panels were then positioned atop of the steel in an operation lasting less than 5 hours, the new steel studs were welded into place through the blockouts in about 4 hours, and then the panels were epoxied into place in less than 2 full working days.
Innovative Bridge Designs for Rapid Renewal
Author: HNTB Corporation, Genesis Structures Inc, Structural Engineering Associates, and Iowa State University
Publisher: Transportation Research Board
ISBN: 0309274109
Category :
Languages : en
Pages : 976
Book Description
This report from the second Strategic Highway Research Program (SHRP 2), which is administered by the Transportation Research Board of the National Academies, documents the development of standardized approaches to designing and constructing complete bridge systems for rapid renewals.
Publisher: Transportation Research Board
ISBN: 0309274109
Category :
Languages : en
Pages : 976
Book Description
This report from the second Strategic Highway Research Program (SHRP 2), which is administered by the Transportation Research Board of the National Academies, documents the development of standardized approaches to designing and constructing complete bridge systems for rapid renewals.
Progress Report
Author:
Publisher:
ISBN:
Category : Highway engineering
Languages : en
Pages : 292
Book Description
Publisher:
ISBN:
Category : Highway engineering
Languages : en
Pages : 292
Book Description
Report
Author:
Publisher:
ISBN:
Category : Highway research
Languages : en
Pages : 398
Book Description
Publisher:
ISBN:
Category : Highway research
Languages : en
Pages : 398
Book Description
Summary of Progress - National Cooperative Highway Research Program
Author: National Cooperative Highway Research Program
Publisher:
ISBN:
Category : Highway research
Languages : en
Pages : 276
Book Description
Publisher:
ISBN:
Category : Highway research
Languages : en
Pages : 276
Book Description
Prefabricated Bridge Elements and Systems to Limit Traffic Disruption During Construction
Author: Mohsen Shahawy
Publisher: Transportation Research Board
ISBN: 0309069726
Category : Bridges
Languages : en
Pages : 58
Book Description
TRB's National Cooperative Highway Research Program (NCHRP) Synthesis Report 324: Prefabricated Bridge Elements and Systems to Limit Traffic Disruption During Construction assesses and documents the use of innovative prefabricated elements and systems and assesses its effects on on-site construction time and cost, closure time, and environmental impacts. The synthesis report also looks at the use of fiber-reinforced polymers and other advanced materials and new technologies that are gaining in popularity but are still in the experimental stages.
Publisher: Transportation Research Board
ISBN: 0309069726
Category : Bridges
Languages : en
Pages : 58
Book Description
TRB's National Cooperative Highway Research Program (NCHRP) Synthesis Report 324: Prefabricated Bridge Elements and Systems to Limit Traffic Disruption During Construction assesses and documents the use of innovative prefabricated elements and systems and assesses its effects on on-site construction time and cost, closure time, and environmental impacts. The synthesis report also looks at the use of fiber-reinforced polymers and other advanced materials and new technologies that are gaining in popularity but are still in the experimental stages.
Experimental Evaluation of Full Depth Precast/prestressed Concrete Bridge Deck Panels
Author: Mohsen A. Issa
Publisher:
ISBN:
Category : Concrete bridges
Languages : en
Pages : 278
Book Description
A literature review concerning the objectives of the project was completed. A significant number of published papers, reports, etc., were examined to determine the effectiveness of full depth precast panels for bridge deck replacement. A detailed description of the experimental methodology was developed which includes design and fabrication of the panels and assembly of the bridge. The design and construction process was carried out in cooperation with the project Technical Review Panel. The major components of the bridge deck system were investigated. This includes the transverse joints and the different materials within the joint as well as composite action. The materials investigated within the joint were polymer concrete, non-shrink grout, and set-45 for the transverse joint. The transverse joints were subjected to direct shear tests, direct tension tests, and flexure tests. These tests exhibited the excellent behavior of the system in terms of strength and failure modes. Shear key tests were also conducted. The shear connection study focused on investigating the composite behavior of the system based on varying the number of shear studs within a respective pocket as well as varying the number of pockets within a respective panel. The results indicated that this shear connection is extremely efficient in rendering the system under full composite action. Finite element analysis was conducted to determine the behavior of the shear connection prior to initiation of the actual full scale tests. In addition, finite element analysis was also performed with respect to the transverse joint tests in an effort to determine the behavior of the joints prior to actual testing. The most significant phase of the project was testing a full-scale model. The bridge was assembled in accordance with the procedures developed as part of the study on full-depth precast panels and the results obtained through this research. The system proved its effectiveness in withstanding the applied loading that exceeded eight times the truck loading in addition to the maximum negative and positive moment application. Only hairline cracking was observed in the deck at the maximum applied load. Of most significance was the fact that full composite action was achieved between the precast panels and the steel supporting system, and the exceptional performance of the transverse joint between adjacent panels.
Publisher:
ISBN:
Category : Concrete bridges
Languages : en
Pages : 278
Book Description
A literature review concerning the objectives of the project was completed. A significant number of published papers, reports, etc., were examined to determine the effectiveness of full depth precast panels for bridge deck replacement. A detailed description of the experimental methodology was developed which includes design and fabrication of the panels and assembly of the bridge. The design and construction process was carried out in cooperation with the project Technical Review Panel. The major components of the bridge deck system were investigated. This includes the transverse joints and the different materials within the joint as well as composite action. The materials investigated within the joint were polymer concrete, non-shrink grout, and set-45 for the transverse joint. The transverse joints were subjected to direct shear tests, direct tension tests, and flexure tests. These tests exhibited the excellent behavior of the system in terms of strength and failure modes. Shear key tests were also conducted. The shear connection study focused on investigating the composite behavior of the system based on varying the number of shear studs within a respective pocket as well as varying the number of pockets within a respective panel. The results indicated that this shear connection is extremely efficient in rendering the system under full composite action. Finite element analysis was conducted to determine the behavior of the shear connection prior to initiation of the actual full scale tests. In addition, finite element analysis was also performed with respect to the transverse joint tests in an effort to determine the behavior of the joints prior to actual testing. The most significant phase of the project was testing a full-scale model. The bridge was assembled in accordance with the procedures developed as part of the study on full-depth precast panels and the results obtained through this research. The system proved its effectiveness in withstanding the applied loading that exceeded eight times the truck loading in addition to the maximum negative and positive moment application. Only hairline cracking was observed in the deck at the maximum applied load. Of most significance was the fact that full composite action was achieved between the precast panels and the steel supporting system, and the exceptional performance of the transverse joint between adjacent panels.
Accelerated Bridge Construction
Author: Mohiuddin Ali Khan
Publisher: Elsevier
ISBN: 0124072259
Category : Technology & Engineering
Languages : en
Pages : 651
Book Description
The traveling public has no patience for prolonged, high cost construction projects. This puts highway construction contractors under intense pressure to minimize traffic disruptions and construction cost. Actively promoted by the Federal Highway Administration, there are hundreds of accelerated bridge construction (ABC) construction programs in the United States, Europe and Japan. Accelerated Bridge Construction: Best Practices and Techniques provides a wide range of construction techniques, processes and technologies designed to maximize bridge construction or reconstruction operations while minimizing project delays and community disruption. - Describes design methods for accelerated bridge substructure construction; reducing foundation construction time and methods by using pile bents - Explains applications to steel bridges, temporary bridges in place of detours using quick erection and demolition - Covers design-build systems' boon to ABC; development of software; use of fiber reinforced polymer (FRP) - Includes applications to glulam and sawn lumber bridges, precast concrete bridges, precast joints details; use of lightweight aggregate concrete, aluminum and high-performance steel
Publisher: Elsevier
ISBN: 0124072259
Category : Technology & Engineering
Languages : en
Pages : 651
Book Description
The traveling public has no patience for prolonged, high cost construction projects. This puts highway construction contractors under intense pressure to minimize traffic disruptions and construction cost. Actively promoted by the Federal Highway Administration, there are hundreds of accelerated bridge construction (ABC) construction programs in the United States, Europe and Japan. Accelerated Bridge Construction: Best Practices and Techniques provides a wide range of construction techniques, processes and technologies designed to maximize bridge construction or reconstruction operations while minimizing project delays and community disruption. - Describes design methods for accelerated bridge substructure construction; reducing foundation construction time and methods by using pile bents - Explains applications to steel bridges, temporary bridges in place of detours using quick erection and demolition - Covers design-build systems' boon to ABC; development of software; use of fiber reinforced polymer (FRP) - Includes applications to glulam and sawn lumber bridges, precast concrete bridges, precast joints details; use of lightweight aggregate concrete, aluminum and high-performance steel
Innovative Bridge Designs for Rapid Renewal
Author:
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 372
Book Description
"TRB's second Strategic Highway Research Program (SHRP 2) S2-R04-RR-1: Innovative Bridge Designs for Rapid Renewal documents the development of standardized approaches to designing and constructing complete bridge systems for rapid renewals. The report also describes a demonstration project on US 6 over the Keg Creek near Council Bluffs, Iowa that was completed in 2011 using the accelerated bridge construction standards developed as part of Renewal Project R04."--Publication info.
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 372
Book Description
"TRB's second Strategic Highway Research Program (SHRP 2) S2-R04-RR-1: Innovative Bridge Designs for Rapid Renewal documents the development of standardized approaches to designing and constructing complete bridge systems for rapid renewals. The report also describes a demonstration project on US 6 over the Keg Creek near Council Bluffs, Iowa that was completed in 2011 using the accelerated bridge construction standards developed as part of Renewal Project R04."--Publication info.