Spokane River and Post Falls Hydroelectric Projects, States of Washington and Idaho

Spokane River and Post Falls Hydroelectric Projects, States of Washington and Idaho PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 654

Get Book Here

Book Description


Final Environmental Impact Statement for Hydropower Relicensing

Final Environmental Impact Statement for Hydropower Relicensing PDF Author:
Publisher:
ISBN:
Category : Hydroelectric power plants
Languages : en
Pages :

Get Book Here

Book Description


Final Environmental Impact Statement for Hydropower Relicensing

Final Environmental Impact Statement for Hydropower Relicensing PDF Author: United States. Division of Hydropower Licensing
Publisher:
ISBN:
Category : Hydroelectric power plants
Languages : en
Pages :

Get Book Here

Book Description


Draft Environmental Impact Statement for Hydropower Relicensing

Draft Environmental Impact Statement for Hydropower Relicensing PDF Author:
Publisher:
ISBN:
Category : Coeur d'Alene Lake Watershed (Idaho)
Languages : en
Pages :

Get Book Here

Book Description


Spokane Valley Project, Washington and Idaho

Spokane Valley Project, Washington and Idaho PDF Author: United States. Congress. Senate. Committee on Interior and Insular Affairs. Subcommittee on Irrigation and Reclamation
Publisher:
ISBN:
Category : Irrigation
Languages : en
Pages : 56

Get Book Here

Book Description
Considers legislation to authorize the Interior Dept to construct and operate the Spokane Valley irrigation project.

Hearings

Hearings PDF Author: United States. Congress Senate
Publisher:
ISBN:
Category :
Languages : en
Pages : 1352

Get Book Here

Book Description


Hearings

Hearings PDF Author: United States. Congress. Senate. Committee on Interior and Insular Affairs
Publisher:
ISBN:
Category :
Languages : en
Pages : 1912

Get Book Here

Book Description


Spokane Valley Project, Washington and Idaho

Spokane Valley Project, Washington and Idaho PDF Author: United States. Congress. Senate. Committee on Interior and Insular Affairs. Subcommittee on Irrigation and Reclamation
Publisher:
ISBN:
Category : Irrigation
Languages : en
Pages : 60

Get Book Here

Book Description
Considers legislation to authorize the Interior Dept to construct and operate the Spokane Valley irrigation project.

The Hydraulic Connection Between the Spokane River and the Spokane Aquifer

The Hydraulic Connection Between the Spokane River and the Spokane Aquifer PDF Author: Christina M. Gearhart
Publisher:
ISBN:
Category : Stream measurements
Languages : en
Pages : 212

Get Book Here

Book Description
"As part of the ongoing Environmental Protection Agency Wellhead Protection Demonstrations Project grant number X-000465-05, an examination of the physical interactipn between the Spokane River and the Spokane aquifer has been completed. This study has established effluent and influent reaches of the Spokane River between State Line, Idaho and the city of Spokane, Washington. Five study sites were established for this project: the State Line site, the Barker Road site, the Sullivan Road site, the Upriver Dam site and the Mission Avenue site. The State Line and Barker Road sites are influent, with unsaturated flow. The Sullivan Road, Upriver Dam and Mission Avenue sites are connected by saturated flow with influent and effluent conditions present at different times of the year. Based on the observations within the five sites, the Spokane River was divided into five reaches and assigned an unsaturated, saturated or transitional flow character. Reaches 1 (from State Line to Harvard Road) and 2 (from Harvard Road to Barker Road) are unsaturated reaches. Reach 3 (from Barker Road to Sullivan Road) is the transitional reach. Reaches 4 (from Sullivan Road to Trent Avenue) and 5 (from Trent Avenue to the Plantes Ferry footbridge) are saturated reaches. Darcy's equation was used to calculate volumetric flux between the river and the aquifer. For low flow unsaturated conditions, the Spokane River loses 104.0 cfs (2.94 ems) between the State Line and Sullivan Road. For high flow conditions, this reach loses 570.8 cfs (16.15 ems). For saturated low flow conditions, the Spokane River gains as much as 116.4 cfs (3.29 ems) and loses as much as 204.5 cfs (5.79 ems) between Barker Road and Plantes Ferry Park. With high flow saturated riverbed coverage, this same reach gains as much as 473.77 cfs (13.41 ems) and loses as much as 832.33 cfs (23.55 ems). Discharge measurements performed by the Spokane County Conservation District during the study period indicate that the Spokane River is influent between the Post Falls Dam and Barker Road. As flows in the river increase, the amount of flow lost to the aquifer also increases. Between Barker Road and the Plantes Ferry Footbridge the character ofthe river is opposite; the river showed gains during all measurements. As flows increase, however, the river gains less from the aquifer."--Document.

The Spokane River

The Spokane River PDF Author: Paul Lindholdt
Publisher: University of Washington Press
ISBN: 029574314X
Category : Nature
Languages : en
Pages : 297

Get Book Here

Book Description
From Lake Coeur d’Alene to its confluence with the Columbia, the Spokane River travels 111 miles of varied and often spectacular terrain—rural, urban, in places wild. The river has been a trading and gathering place for Indigenous peoples for thousands of years. With bountiful trout, accessible swimming holes, and challenging rapids, it is a recreational magnet for residents and tourists alike. The Spokane also bears the legacy of industrial growth and remains caught amid interests competing over natural resources. The contributors to this collection profile this living river through personal reflection, history, science, and poetry. They bring a keen environmental awareness of resource scarcity, climate change, and cultural survival tied to the river’s fate.