Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 328
Book Description
Programmatic EIS for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project, 24 Mill Sites
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 278
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 278
Book Description
Programmatic EIS for the Uranium Mill Tailings Remedial Action Ground Water Project, 24 mill sites
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 0
Book Description
Programmatic EIS for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project, 24 Mill Sites
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 328
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 328
Book Description
Draft Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project
Author: United States. Dept. of Energy
Publisher:
ISBN:
Category : Environmental policy
Languages : en
Pages : 250
Book Description
Publisher:
ISBN:
Category : Environmental policy
Languages : en
Pages : 250
Book Description
U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 95
Book Description
The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date.
Publisher:
ISBN:
Category :
Languages : en
Pages : 95
Book Description
The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date.
Energy and Water Development Appropriations for 1997
Author: United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development
Publisher:
ISBN:
Category : Energy development
Languages : en
Pages : 1468
Book Description
Publisher:
ISBN:
Category : Energy development
Languages : en
Pages : 1468
Book Description
Energy and Water Development Appropriations for 1997: Department of Energy fiscal year 1997 budget justifications
Author: United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development
Publisher:
ISBN:
Category : Energy development
Languages : en
Pages : 2856
Book Description
Publisher:
ISBN:
Category : Energy development
Languages : en
Pages : 2856
Book Description
US Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project. Revision 1, Version 1
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 57
Book Description
The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date.
Publisher:
ISBN:
Category :
Languages : en
Pages : 57
Book Description
The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date.
The Office of Environmental Management Technical Reports
Author:
Publisher:
ISBN:
Category : Environmental management
Languages : en
Pages : 972
Book Description
Publisher:
ISBN:
Category : Environmental management
Languages : en
Pages : 972
Book Description
Energy Research Abstracts
Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 464
Book Description
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 464
Book Description