Post-Closure RCRA Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch

Post-Closure RCRA Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch PDF Author: D. BRENT. Barnett
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
The purpose of this plan is to provide a post-closure groundwater monitoring program for the 216-S-10 Pond and Ditch (S-10) treatment, storage, and/or disposal (TSD) unit. The plan incorporates the sum of knowledge about the potential for groundwater contamination to originate from the S-10, including groundwater monitoring results, hydrogeology, and operational history. The S-10 has not received liquid waste since October 1991. The closure of S-10 has been coordinated with the 200-CS-1 source operable unit in accordance with the Tri-Party Agreement interim milestones M-20-39 and M-15-39C. The S-10 is closely situated among other waste sites of very similar operational histories. The proximity of the S-10 to the other facilities (216-S-17 pond, 216-S-11 Pond, 216-S-5,6 cribs, 216-S-16 ditch and pond, and 216-U-9 ditch) indicate that at least some observed groundwater contamination beneath and downgradient of S-10 could have originated from waste sites other than S-10. Hence, it may not be feasible to strictly discriminate between the contributions of each waste site to groundwater contamination beneath the S-10. A post-closure groundwater monitoring network is proposed that will include the drilling of three new wells to replace wells that have gone dry. When completed, the revised network will meet the intent for groundwater monitoring network under WAC 173-303-645, and enable an improved understanding of groundwater contamination at the S-10. Site-specific sampling constituents are based on the dangerous waste constituents of concern relating to RCRA TSD unit operations (TSD unit constituents) identified in the Part A Permit Application. Thus, a constituent is selected for monitoring if it is: A dangerous waste constituent identified in the Part A Permit Application, or A mobile decomposition product (i.e., nitrate from nitrite) of a Part A constituent, or A reliable indicator of the site-specific contaminants (i.e., specific conductance). Using these criteria, the following constituent list and sampling schedule is proposed: Constituent; Sampling Frequency Site-Specific Parameters; Hexavalent chromium (a); Semiannual Chloride; Semiannual Fluoride; Semiannual Nitrate; Semiannual Nitrite; Semiannual Specific conductance (field)(a); Semiannual Ancillary Parameters; Anions; Annual Alkalinity Annual Metals, (in addition to chromium); Annual pH (field) Semiannual Temperature (field); Semiannual Turbidity (field) Semiannual (a). These constituents will be subject to statistical tests after background is established. It will be necessary to install new monitoring wells and accumulate background data on the groundwater from those wells before statistical comparisons can be made. Until then, the constituents listed above will be evaluated by tracking and trending concentrations in all wells and comparing these results with the corresponding DWS or Hanford Site background concentration for each constituent. If a comparison value (background or DWS) for a constituent is exceeded, DOE will notify Ecology per WAC 173-303-645 (9) (g) requirements (within seven days or a time agreed to between DOE and Ecology).

Post-Closure RCRA Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch

Post-Closure RCRA Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch PDF Author: D. BRENT. Barnett
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
The purpose of this plan is to provide a post-closure groundwater monitoring program for the 216-S-10 Pond and Ditch (S-10) treatment, storage, and/or disposal (TSD) unit. The plan incorporates the sum of knowledge about the potential for groundwater contamination to originate from the S-10, including groundwater monitoring results, hydrogeology, and operational history. The S-10 has not received liquid waste since October 1991. The closure of S-10 has been coordinated with the 200-CS-1 source operable unit in accordance with the Tri-Party Agreement interim milestones M-20-39 and M-15-39C. The S-10 is closely situated among other waste sites of very similar operational histories. The proximity of the S-10 to the other facilities (216-S-17 pond, 216-S-11 Pond, 216-S-5,6 cribs, 216-S-16 ditch and pond, and 216-U-9 ditch) indicate that at least some observed groundwater contamination beneath and downgradient of S-10 could have originated from waste sites other than S-10. Hence, it may not be feasible to strictly discriminate between the contributions of each waste site to groundwater contamination beneath the S-10. A post-closure groundwater monitoring network is proposed that will include the drilling of three new wells to replace wells that have gone dry. When completed, the revised network will meet the intent for groundwater monitoring network under WAC 173-303-645, and enable an improved understanding of groundwater contamination at the S-10. Site-specific sampling constituents are based on the dangerous waste constituents of concern relating to RCRA TSD unit operations (TSD unit constituents) identified in the Part A Permit Application. Thus, a constituent is selected for monitoring if it is: A dangerous waste constituent identified in the Part A Permit Application, or A mobile decomposition product (i.e., nitrate from nitrite) of a Part A constituent, or A reliable indicator of the site-specific contaminants (i.e., specific conductance). Using these criteria, the following constituent list and sampling schedule is proposed: Constituent; Sampling Frequency Site-Specific Parameters; Hexavalent chromium (a); Semiannual Chloride; Semiannual Fluoride; Semiannual Nitrate; Semiannual Nitrite; Semiannual Specific conductance (field)(a); Semiannual Ancillary Parameters; Anions; Annual Alkalinity Annual Metals, (in addition to chromium); Annual pH (field) Semiannual Temperature (field); Semiannual Turbidity (field) Semiannual (a). These constituents will be subject to statistical tests after background is established. It will be necessary to install new monitoring wells and accumulate background data on the groundwater from those wells before statistical comparisons can be made. Until then, the constituents listed above will be evaluated by tracking and trending concentrations in all wells and comparing these results with the corresponding DWS or Hanford Site background concentration for each constituent. If a comparison value (background or DWS) for a constituent is exceeded, DOE will notify Ecology per WAC 173-303-645 (9) (g) requirements (within seven days or a time agreed to between DOE and Ecology).

Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch

Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch PDF Author: Bruce A. Williams
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch, Interim Change Notice 2

Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch, Interim Change Notice 2 PDF Author: Bruce A. Williams
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
This ICN updates the groundwater monitoring plan. The list of constituents and the frequency of sampling is updated to reflect current needs and updates the list of wells within the network.

Energy and Water Development Appropriations for 2010: Dept. of Energy fiscal year 2010 justifications

Energy and Water Development Appropriations for 2010: Dept. of Energy fiscal year 2010 justifications PDF Author: United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development
Publisher:
ISBN:
Category : Federal aid to energy development
Languages : en
Pages : 1364

Get Book Here

Book Description


Groundwater Monitoring Plan for the Hanford Site 216-B-3 Pond RCRA Facility

Groundwater Monitoring Plan for the Hanford Site 216-B-3 Pond RCRA Facility PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
The 216-B-3 Pond was a series of ponds for disposal of liquid effluent from past Hanford production facilities. In 1990, groundwater monitoring at B Pond was elevated from "detection" to assessment status because total organic halides and total organic carbon were found to exceed critical means in two wells. Groundwater quality assessment, which ended in 1996, failed to find any specific hazardous waste contaminant that could have accounted for the isolated occurrences of elevated total organic halides and total organic carbon. Hence, the facility was subsequently returned to detection-level monitoring in 1998. Exhaustive groundwater analyses during the assessment period indicated that only two contaminants, tritium and nitrate, could be positively attributed to the B Pond System, with two others (arsenic and I-129) possibly originating from B Pond. Chemical and radiological analyses of soil at the main pond and 216-B-3-3 ditch has not revealed significant contamination. Based on the observed, minor contamination in groundwater and in the soil column, three parameters were selected for site-specific, semiannual monitoring; gross alpha, gross beta, and specific conductance. Total organic halides and total organic carbon are included as constituents because of regulatory requirements. Nitrate, tritium, arsenic, and iodine-129 will be monitored under the aegis of Hanford site-wide monitoring. Although the B Pond System is not scheduled to advance from RCRA interim status to final status until the year 2003, a contingency plan for an improved monitoring strategy, which will partially emulate final status requirements, will be contemplated before the official change to final status. This modification will allow a more sensible and effective screening of groundwater for the facility.

Groundwater Monitoring Plan for the Hanford Site 216-B-3 Pond RCRA Facility, Interim Change Notice 1

Groundwater Monitoring Plan for the Hanford Site 216-B-3 Pond RCRA Facility, Interim Change Notice 1 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 5

Get Book Here

Book Description
This form updates the groundwater monitoring plan for the B Pond system and documents revision agreed upon with the Washington State Department of Ecology concerning well network, constituent list, statistical analysis, and report procedures.

Groundwater Monitoring at RCRA Land Disposal Facilities

Groundwater Monitoring at RCRA Land Disposal Facilities PDF Author: United States. Congress. House. Committee on Energy and Commerce. Subcommittee on Oversight and Investigations
Publisher:
ISBN:
Category : Environmental monitoring
Languages : en
Pages : 378

Get Book Here

Book Description


Groundwater Monitoring Plan for the 216-A-29 Ditch

Groundwater Monitoring Plan for the 216-A-29 Ditch PDF Author: Mark D. Sweeney
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Groundwater Monitoring Plan for the 1301-N, 1324-N/NA, and 1325-N Sites

Groundwater Monitoring Plan for the 1301-N, 1324-N/NA, and 1325-N Sites PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
This document presents groundwater monitoring plans for four Resource Conservation and Recovery Act of 1976 (RCRA) hazardous waste sites: the 1301-N Liquid Waste Disposal Facility (LWDF), the 1325-N LWDF, the 1324-N surface impoundment, and the 1324-NA percolation pond (1324-N/NA site). This monitoring plan is based on requirements for interim-status units, as defined by the RCRA and amended by the Hazardous and Solid Waste Amendments of 1984. These regulations are promulgated by the U.S. Environmental Protection Agency (EPA) in 40 Code of Federal Regulation (CFR) 265, Subpart F, as implemented by the Washington State Department of Ecology in Washington Administrative Code (WAC) 173-303-400. All of the sites are currently monitored under indicator evaluation programs (40 CFR 265.92). Final status monitoring programs will be initiated for the 100-N RCRA sites when they are incorporated into the Hanford Site RCRA Permit (Ecology 1994). This is scheduled for 1998 for the 1324-N/NA sites and for 1999 for the 1301-N and 1325-N sites. Post-closure plans are currently being prepared by the Environmental Restoration Contractor.

Post-closure Groundwater Monitoring Plan for the 1324-N Surface Impoundment and 1324-NA Percolation Pond

Post-closure Groundwater Monitoring Plan for the 1324-N Surface Impoundment and 1324-NA Percolation Pond PDF Author: Mary J. Hartman
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description