Plutonium Uranium Extraction (PUREX) Facility Treatment, Storage, And/or Disposal Inspection Plan

Plutonium Uranium Extraction (PUREX) Facility Treatment, Storage, And/or Disposal Inspection Plan PDF Author: Christopher J. Kemp
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description

Plutonium Uranium Extraction (PUREX) Facility Treatment, Storage, And/or Disposal Inspection Plan

Plutonium Uranium Extraction (PUREX) Facility Treatment, Storage, And/or Disposal Inspection Plan PDF Author: Christopher J. Kemp
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Pamphlets - Czechoslovakia - Foreign Relations

Pamphlets - Czechoslovakia - Foreign Relations PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Surveillance and Maintenance Plan for the Plutonium Uranium Extraction (PUREX) Facility

Surveillance and Maintenance Plan for the Plutonium Uranium Extraction (PUREX) Facility PDF Author: United States. Department of Energy. Richland Operations Office
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Plutonium Uranium Extraction Facility Documented Safety Analysis

Plutonium Uranium Extraction Facility Documented Safety Analysis PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 255

Get Book Here

Book Description
This document provides the documented safety analysis (DSA) and Central Plateau Remediation Project (CP) requirements that apply to surveillance and maintenance (S & M) activities at the Plutonium-Uranium Extraction (PUREX) facility. This DSA was developed in accordance with DOE-STD-1120-98, ''Integration of Environment, Safety, and Health into Facility Disposition Activities''. Upon approval and implementation of this document, the current safety basis documents will be retired.

Facility Effluent Monitoring Plan for the Plutonium Uranium Extraction Facility

Facility Effluent Monitoring Plan for the Plutonium Uranium Extraction Facility PDF Author: D. L. Wiegand
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


PUREX Facility Hazards Assessment

PUREX Facility Hazards Assessment PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 44

Get Book Here

Book Description
This report documents the hazards assessment for the Plutonium Uranium Extraction Plant (PUREX) located on the US Department of Energy (DOE) Hanford Site. Operation of PUREX is the responsibility of Westinghouse Hanford Company (WHC). This hazards assessment was conducted to provide the emergency planning technical basis for PUREX. DOE Order 5500.3A requires an emergency planning hazards assessment for each facility that has the potential to reach or exceed the lowest level emergency classification. In October of 1990, WHC was directed to place PUREX in standby. In December of 1992 the DOE Assistant Secretary for Environmental Restoration and Waste Management authorized the termination of PUREX and directed DOE-RL to proceed with shutdown planning and terminal clean out activities. Prior to this action, its mission was to reprocess irradiated fuels for the recovery of uranium and plutonium. The present mission is to establish a passively safe and environmentally secure configuration at the PUREX facility and to preserve that condition for 10 years. The ten year time frame represents the typical duration expended to define, authorize and initiate follow-on decommissioning and decontamination activities.

Review of the Department of Energy's Plans for Disposal of Surplus Plutonium in the Waste Isolation Pilot Plant

Review of the Department of Energy's Plans for Disposal of Surplus Plutonium in the Waste Isolation Pilot Plant PDF Author: National Academies of Sciences, Engineering, and Medicine
Publisher: National Academies Press
ISBN: 0309498589
Category : Political Science
Languages : en
Pages : 225

Get Book Here

Book Description
In 2018, the National Academies of Sciences, Engineering, and Medicine issued an Interim Report evaluating the general viability of the U.S. Department of Energy's National Nuclear Security Administration's (DOE-NNSA's) conceptual plans for disposing of 34 metric tons (MT) of surplus plutonium in the Waste Isolation Pilot Plant (WIPP), a deep geologic repository near Carlsbad, New Mexico. It provided a preliminary assessment of the general viability of DOE-NNSA's conceptual plans, focused on some of the barriers to their implementation. This final report addresses the remaining issues and echoes the recommendations from the interim study.

B Plant Complex Treatment, Storage, and Disposal Units Inspection Plan

B Plant Complex Treatment, Storage, and Disposal Units Inspection Plan PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Maintenance Implementation Plan for Plutonium Uranium Extraction/UO3 Facilities

Maintenance Implementation Plan for Plutonium Uranium Extraction/UO3 Facilities PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 52

Get Book Here

Book Description


Plutonium Uranium Extraction Plant (PUREX) Hazards Assessment

Plutonium Uranium Extraction Plant (PUREX) Hazards Assessment PDF Author: Shawn L. Bond
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description