Author: Ronald O'Rourke
Publisher: Createspace Independent Publishing Platform
ISBN: 9781540348968
Category :
Languages : en
Pages : 48
Book Description
The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2017 are to be the 25 and 26th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2017 at $5,408.9 million, or an average of $2,704.5 million each. The boats have received a total of $1,623.3 million in prior-year advance procurement (AP) funding and $597.6 million in prior-year Economic Order Quantity (EOQ) funding. The Navy's proposed FY2017 budget requests the remaining $3,188.0 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2017 budget also requests $1,767.2 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2017 funding request for the program (excluding outfitting and post-delivery costs) to $4,955.2 million. The Navy's proposed FY2017 budget also requests $97.9 million in research and development funding for the Virginia Payload Module (VPM). The funding is contained in Program Element (PE) 0604580N, entitled Virginia Payload Module (VPM), which is line 128 in the Navy's FY2017 research and development account. The Navy plans to build some of the Virginia-class boats procured in FY2019 and subsequent years with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's FY2017 30-year SSN procurement plan, if implemented, would not be sufficient to maintain a force of 48 SSNs consistently over the long run. The Navy projects under the plan that the SSN force would fall below 48 boats starting in FY2025, reach a minimum of 41 boats in FY2029, and remain below 48 boats through FY2036. Potential issues for Congress regarding the Virginia-class program include whether to procure an additional Virginia-class boat in FY2021 and, more generally, the Virginia-class procurement rate in coming years.
Navy Virginia Class Attack Submarine Procurement
Author: Ronald O'Rourke
Publisher: Createspace Independent Publishing Platform
ISBN: 9781540348968
Category :
Languages : en
Pages : 48
Book Description
The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2017 are to be the 25 and 26th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2017 at $5,408.9 million, or an average of $2,704.5 million each. The boats have received a total of $1,623.3 million in prior-year advance procurement (AP) funding and $597.6 million in prior-year Economic Order Quantity (EOQ) funding. The Navy's proposed FY2017 budget requests the remaining $3,188.0 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2017 budget also requests $1,767.2 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2017 funding request for the program (excluding outfitting and post-delivery costs) to $4,955.2 million. The Navy's proposed FY2017 budget also requests $97.9 million in research and development funding for the Virginia Payload Module (VPM). The funding is contained in Program Element (PE) 0604580N, entitled Virginia Payload Module (VPM), which is line 128 in the Navy's FY2017 research and development account. The Navy plans to build some of the Virginia-class boats procured in FY2019 and subsequent years with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's FY2017 30-year SSN procurement plan, if implemented, would not be sufficient to maintain a force of 48 SSNs consistently over the long run. The Navy projects under the plan that the SSN force would fall below 48 boats starting in FY2025, reach a minimum of 41 boats in FY2029, and remain below 48 boats through FY2036. Potential issues for Congress regarding the Virginia-class program include whether to procure an additional Virginia-class boat in FY2021 and, more generally, the Virginia-class procurement rate in coming years.
Publisher: Createspace Independent Publishing Platform
ISBN: 9781540348968
Category :
Languages : en
Pages : 48
Book Description
The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2017 are to be the 25 and 26th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2017 at $5,408.9 million, or an average of $2,704.5 million each. The boats have received a total of $1,623.3 million in prior-year advance procurement (AP) funding and $597.6 million in prior-year Economic Order Quantity (EOQ) funding. The Navy's proposed FY2017 budget requests the remaining $3,188.0 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2017 budget also requests $1,767.2 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2017 funding request for the program (excluding outfitting and post-delivery costs) to $4,955.2 million. The Navy's proposed FY2017 budget also requests $97.9 million in research and development funding for the Virginia Payload Module (VPM). The funding is contained in Program Element (PE) 0604580N, entitled Virginia Payload Module (VPM), which is line 128 in the Navy's FY2017 research and development account. The Navy plans to build some of the Virginia-class boats procured in FY2019 and subsequent years with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's FY2017 30-year SSN procurement plan, if implemented, would not be sufficient to maintain a force of 48 SSNs consistently over the long run. The Navy projects under the plan that the SSN force would fall below 48 boats starting in FY2025, reach a minimum of 41 boats in FY2029, and remain below 48 boats through FY2036. Potential issues for Congress regarding the Virginia-class program include whether to procure an additional Virginia-class boat in FY2021 and, more generally, the Virginia-class procurement rate in coming years.
Navy Virginia Class Attack Submarine Procurement
Author: Ronald O'Rourke
Publisher: Createspace Independent Publishing Platform
ISBN: 9781545215166
Category :
Languages : en
Pages : 52
Book Description
The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2017 are to be the 25th and 26th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014-FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2017 at $5,408.9 million, or an average of $2,704.5 million each. The boats have received a total of $1,623.3 million in prior-year advance procurement (AP) funding and $597.6 million in prior-year Economic Order Quantity (EOQ) funding. The Navy's proposed FY2017 budget requests the remaining $3,188.0 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2017 budget also requests $1,767.2 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2017 funding request for the program (excluding outfitting and post-delivery costs) to $4,955.2 million. The Navy's proposed FY2017 budget also requests $97.9 million in research and development funding for the Virginia Payload Module (VPM). The funding is contained in Program Element (PE) 0604580N, entitled Virginia Payload Module (VPM), which is line 128 in the Navy's FY2017 research and development account. The Navy plans to build some of the Virginia-class boats procured in FY2019 and subsequent years with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's FY2017 30-year SSN procurement plan, if implemented, would not be sufficient to maintain a force of 48 SSNs consistently over the long run. The Navy projects under the plan that the SSN force would fall below 48 boats starting in FY2025, reach a minimum of 41 boats in FY2029, and remain below 48 boats through FY2036. Potential issues for Congress regarding the Virginia-class program include whether to procure an additional Virginia-class boat in FY2021 and, more generally, the Virginia-class procurement rate in coming years.
Publisher: Createspace Independent Publishing Platform
ISBN: 9781545215166
Category :
Languages : en
Pages : 52
Book Description
The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2017 are to be the 25th and 26th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014-FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2017 at $5,408.9 million, or an average of $2,704.5 million each. The boats have received a total of $1,623.3 million in prior-year advance procurement (AP) funding and $597.6 million in prior-year Economic Order Quantity (EOQ) funding. The Navy's proposed FY2017 budget requests the remaining $3,188.0 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2017 budget also requests $1,767.2 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2017 funding request for the program (excluding outfitting and post-delivery costs) to $4,955.2 million. The Navy's proposed FY2017 budget also requests $97.9 million in research and development funding for the Virginia Payload Module (VPM). The funding is contained in Program Element (PE) 0604580N, entitled Virginia Payload Module (VPM), which is line 128 in the Navy's FY2017 research and development account. The Navy plans to build some of the Virginia-class boats procured in FY2019 and subsequent years with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's FY2017 30-year SSN procurement plan, if implemented, would not be sufficient to maintain a force of 48 SSNs consistently over the long run. The Navy projects under the plan that the SSN force would fall below 48 boats starting in FY2025, reach a minimum of 41 boats in FY2029, and remain below 48 boats through FY2036. Potential issues for Congress regarding the Virginia-class program include whether to procure an additional Virginia-class boat in FY2021 and, more generally, the Virginia-class procurement rate in coming years.
Navy Virginia (Ssn-774) Class Attack Submarine Procurement
Author: O'Rourke
Publisher: CreateSpace
ISBN: 9781503000407
Category :
Languages : en
Pages : 34
Book Description
This report provides background information and issues for Congress on the Virginia-class nuclear-powered attack submarine (SSN) program. The Navy's proposed FY2014 budget requested $5,285.3 million in procurement and advance procurement (AP) funding for the program. Decisions that Congress makes on procurement of Virginia-class boats could substantially affect U.S. Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base.
Publisher: CreateSpace
ISBN: 9781503000407
Category :
Languages : en
Pages : 34
Book Description
This report provides background information and issues for Congress on the Virginia-class nuclear-powered attack submarine (SSN) program. The Navy's proposed FY2014 budget requested $5,285.3 million in procurement and advance procurement (AP) funding for the program. Decisions that Congress makes on procurement of Virginia-class boats could substantially affect U.S. Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base.
Navy Submarines
Author: Terry Coleman
Publisher: Nova Science Publishers
ISBN: 9781634832366
Category : History
Languages : en
Pages : 0
Book Description
The U.S. Navy operates three types of submarines- nuclear-powered ballistic missile submarines (SSBNs), nuclear-powered cruise missile and special operations forces (SOF) submarines (SSGNs), and nuclear-powered attack submarines (SSNs). This book provides background information and issues for Congress on the Virginia-class SSN program. The Navy's proposed FY2016 budget requests $5,340.1 million in procurement, advance procurement (AP), and Economic Order Quantity (EOQ) funding for the program. Decisions that Congress makes on procurement of Virginia-class boats could substantially affect U.S. Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base. Furthermore, this book provides background information and potential oversight issues for Congress on the Ohio replacement program (ORP), a program to design and build a new class of 12 ballistic missile submarines (SSBNs) to replace the Navy's current force of 14 Ohio-class SSBNs. The Ohio replacement program is also known as the SSBN(X) program. The Navy wants to procure the first Ohio replacement boat in FY2021, with advance procurement (AP) funding starting in FY2017. The Navy has identified the Ohio replacement program as its top priority program.
Publisher: Nova Science Publishers
ISBN: 9781634832366
Category : History
Languages : en
Pages : 0
Book Description
The U.S. Navy operates three types of submarines- nuclear-powered ballistic missile submarines (SSBNs), nuclear-powered cruise missile and special operations forces (SOF) submarines (SSGNs), and nuclear-powered attack submarines (SSNs). This book provides background information and issues for Congress on the Virginia-class SSN program. The Navy's proposed FY2016 budget requests $5,340.1 million in procurement, advance procurement (AP), and Economic Order Quantity (EOQ) funding for the program. Decisions that Congress makes on procurement of Virginia-class boats could substantially affect U.S. Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base. Furthermore, this book provides background information and potential oversight issues for Congress on the Ohio replacement program (ORP), a program to design and build a new class of 12 ballistic missile submarines (SSBNs) to replace the Navy's current force of 14 Ohio-class SSBNs. The Ohio replacement program is also known as the SSBN(X) program. The Navy wants to procure the first Ohio replacement boat in FY2021, with advance procurement (AP) funding starting in FY2017. The Navy has identified the Ohio replacement program as its top priority program.
Navy Force Structure and Shipbuilding Plans
Author: Ronald O'Rourke
Publisher: DIANE Publishing
ISBN: 1437930573
Category : Transportation
Languages : en
Pages : 43
Book Description
This is a print on demand edition of a hard to find publication. Contents: (1) Introduction; (2) Background: Proposed 313-Ship Fleet; FY 2010 Shipbuilding Request; (3) Oversight Issues for Congress: Adequacy of Proposed 313-Ship Fleet: Adequacy of Shipbuilding Plan for Maintaining 313 Ships; Shortfalls Relative to 313-Ship Goals; Affordability of Shipbuilding Plan; (4) Legislative Activity for FY 2010: FY 2010 Defense Authorization Act; FY 2010 DoD Appropriations Act; Resolution Directing Submission of FY 2010 30-Year Shipbuilding Plan; Legislation on Individual Shipbuilding Programs. Appendixes: (A) December 2009 Press Reports About Draft FY 2011 30-Year Shipbuilding Plan; (B) Adequacy of Planned 313-Ship Fleet; (C) Size of the Navy and Navy Shipbuilding Rate. Charts and tables.
Publisher: DIANE Publishing
ISBN: 1437930573
Category : Transportation
Languages : en
Pages : 43
Book Description
This is a print on demand edition of a hard to find publication. Contents: (1) Introduction; (2) Background: Proposed 313-Ship Fleet; FY 2010 Shipbuilding Request; (3) Oversight Issues for Congress: Adequacy of Proposed 313-Ship Fleet: Adequacy of Shipbuilding Plan for Maintaining 313 Ships; Shortfalls Relative to 313-Ship Goals; Affordability of Shipbuilding Plan; (4) Legislative Activity for FY 2010: FY 2010 Defense Authorization Act; FY 2010 DoD Appropriations Act; Resolution Directing Submission of FY 2010 30-Year Shipbuilding Plan; Legislation on Individual Shipbuilding Programs. Appendixes: (A) December 2009 Press Reports About Draft FY 2011 30-Year Shipbuilding Plan; (B) Adequacy of Planned 313-Ship Fleet; (C) Size of the Navy and Navy Shipbuilding Rate. Charts and tables.
Navy Columbia (SSBN-826) Class Ballistic Missile Submarine Program
Author: Ronald O'Rourke
Publisher:
ISBN: 9781701399518
Category :
Languages : en
Pages : 60
Book Description
The Columbia (SSBN-826) class program is a program to design and build a class of 12 new ballistic missile submarines (SSBNs) to replace the Navy's current force of 14 aging Ohio-class SSBNs. The Navy has identified the Columbia-class program as the Navy's top priority program. The Navy wants to procure the first Columbia-class boat in FY2021. Research and development work on the program has been underway for several years, and advance procurement (AP) funding for the program began in FY2017. The Navy's proposed FY2020 budget requests $1,698.9 million in advance procurement (AP) funding and $533.1 million in research and development funding for the program. The Navy's FY2020 budget submission estimates the total procurement cost of the 12-ship class at $109.0 billion in then-year dollars. An April 2018 Government Accountability Office (GAO) report assessing selected major DOD weapon acquisition programs stated that the estimated total acquisition cost of the Columbia-class program is $102,075.3 million (about $102.1 billion) in constant FY2018 dollars, including $12,901.0 million (about $12.9 billion) in research and development costs and $89,174.3 million (about $89.2 billion) in procurement costs.
Publisher:
ISBN: 9781701399518
Category :
Languages : en
Pages : 60
Book Description
The Columbia (SSBN-826) class program is a program to design and build a class of 12 new ballistic missile submarines (SSBNs) to replace the Navy's current force of 14 aging Ohio-class SSBNs. The Navy has identified the Columbia-class program as the Navy's top priority program. The Navy wants to procure the first Columbia-class boat in FY2021. Research and development work on the program has been underway for several years, and advance procurement (AP) funding for the program began in FY2017. The Navy's proposed FY2020 budget requests $1,698.9 million in advance procurement (AP) funding and $533.1 million in research and development funding for the program. The Navy's FY2020 budget submission estimates the total procurement cost of the 12-ship class at $109.0 billion in then-year dollars. An April 2018 Government Accountability Office (GAO) report assessing selected major DOD weapon acquisition programs stated that the estimated total acquisition cost of the Columbia-class program is $102,075.3 million (about $102.1 billion) in constant FY2018 dollars, including $12,901.0 million (about $12.9 billion) in research and development costs and $89,174.3 million (about $89.2 billion) in procurement costs.
Sustaining U.S. Nuclear Submarine Design Capabilities
Author: John Frederic Schank
Publisher: Rand Corporation
ISBN: 0833041606
Category : Business & Economics
Languages : en
Pages : 235
Book Description
For the first time since the design of the first nuclear submarine, the U.S. Navy has no nuclear submarine design program under way, which raises the possibility that design capability could be lost. Such a loss could result in higher costs and delays when the next submarine design is undertaken, as well as risks to system performance and safety. The authors estimate and compare the costs and delays of letting design capability erode vs. those of alternative means of managing the workload and workforce over the gap in design demand and beyond. The authors recommend that the Navy consider stret.
Publisher: Rand Corporation
ISBN: 0833041606
Category : Business & Economics
Languages : en
Pages : 235
Book Description
For the first time since the design of the first nuclear submarine, the U.S. Navy has no nuclear submarine design program under way, which raises the possibility that design capability could be lost. Such a loss could result in higher costs and delays when the next submarine design is undertaken, as well as risks to system performance and safety. The authors estimate and compare the costs and delays of letting design capability erode vs. those of alternative means of managing the workload and workforce over the gap in design demand and beyond. The authors recommend that the Navy consider stret.
Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition
Author: Ronald O'Rourke
Publisher:
ISBN:
Category : Defense contracts
Languages : en
Pages : 0
Book Description
This report provides background information and issues for Congress on multiyear procurement (MYP) and block buy contracting (BBC), which are special contracting mechanisms that Congress permits the Department of Defense (DOD) to use for a limited number of defense acquisition programs.
Publisher:
ISBN:
Category : Defense contracts
Languages : en
Pages : 0
Book Description
This report provides background information and issues for Congress on multiyear procurement (MYP) and block buy contracting (BBC), which are special contracting mechanisms that Congress permits the Department of Defense (DOD) to use for a limited number of defense acquisition programs.
U.S. Military Forces in FY 2020
Author: Mark F. Cancian
Publisher: Rowman & Littlefield
ISBN: 1442281448
Category : Political Science
Languages : en
Pages : 98
Book Description
Annually, CSIS senior adviser Mark Cancian publishes a series of papers on U.S. military forces—their composition, new initiatives, long-term trends, and challenges. The overall theme of this year’s report is the struggle to align forces and strategy because of budget tradeoffs that even defense buildups must make, unrelenting operational demands that stress forces and prevent force structure reductions, and legacy programs whose smooth operations and strong constituencies inhibit rapid change. This report takes a deeper look at the strategic and budget context, the military services, special operations forces, DOD civilians and contractors, and non-DOD national security organizations in the FY 2020 budget.
Publisher: Rowman & Littlefield
ISBN: 1442281448
Category : Political Science
Languages : en
Pages : 98
Book Description
Annually, CSIS senior adviser Mark Cancian publishes a series of papers on U.S. military forces—their composition, new initiatives, long-term trends, and challenges. The overall theme of this year’s report is the struggle to align forces and strategy because of budget tradeoffs that even defense buildups must make, unrelenting operational demands that stress forces and prevent force structure reductions, and legacy programs whose smooth operations and strong constituencies inhibit rapid change. This report takes a deeper look at the strategic and budget context, the military services, special operations forces, DOD civilians and contractors, and non-DOD national security organizations in the FY 2020 budget.
Navy Attack Submarine Procurement
Author: Ronald O'Rourke
Publisher: DIANE Publishing
ISBN: 1437938345
Category : Technology & Engineering
Languages : en
Pages : 28
Book Description
Contents: (1) Intro.; (2) Background: Types of Sub¿s. in the U.S. Navy; Attack Sub. Force Levels; Virginia (SSN-774) Class Program; Past and Planned Procurement; Changes in Planned Procurement Rates; Joint Production Arrangement; Cost-Reduction Effort; Sub Construction Industrial Base; Design and Engin. (D&E) Portion; Projected SSN Shortfall; Navy Study on Options for Mitigating Projected Shortfall; (3) Issues for Congress: 48-Boat Force-Level Goal and Planned SSN Procurement; (4) Options for Congress; (5) Legislative Activity for FY 2010. Appendices: Past SSN Force-Level Goals; Views Regarding 48-Boat SSN Force-Level Goal; Options for Funding SSNs; Maintaining Sub. D&E Base. A print on demand pub.
Publisher: DIANE Publishing
ISBN: 1437938345
Category : Technology & Engineering
Languages : en
Pages : 28
Book Description
Contents: (1) Intro.; (2) Background: Types of Sub¿s. in the U.S. Navy; Attack Sub. Force Levels; Virginia (SSN-774) Class Program; Past and Planned Procurement; Changes in Planned Procurement Rates; Joint Production Arrangement; Cost-Reduction Effort; Sub Construction Industrial Base; Design and Engin. (D&E) Portion; Projected SSN Shortfall; Navy Study on Options for Mitigating Projected Shortfall; (3) Issues for Congress: 48-Boat Force-Level Goal and Planned SSN Procurement; (4) Options for Congress; (5) Legislative Activity for FY 2010. Appendices: Past SSN Force-Level Goals; Views Regarding 48-Boat SSN Force-Level Goal; Options for Funding SSNs; Maintaining Sub. D&E Base. A print on demand pub.