The dam is about 48 ft. long and 13 ft. high. It is constructed of cut stone masonry. The dam is generally in poor condition. The right end of the dam has had a partial failure at the crest. The dam is classified as small in size with a hazard potential of low. Recommendations for remedial work include repair of the failed area at the right end of the crest of the dam, the plugging of pressure leaks in the dam and mortaring of open joints, and the repair of erosion damage at the right abutment. (Author).

National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00575), Connecticut River Basin, Springfield, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00575), Connecticut River Basin, Springfield, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 56

Get Book Here

Book Description
The dam is about 48 ft. long and 13 ft. high. It is constructed of cut stone masonry. The dam is generally in poor condition. The right end of the dam has had a partial failure at the crest. The dam is classified as small in size with a hazard potential of low. Recommendations for remedial work include repair of the failed area at the right end of the crest of the dam, the plugging of pressure leaks in the dam and mortaring of open joints, and the repair of erosion damage at the right abutment. (Author).

National Program for Inspection of Non-Federal Dams. South Barre Mill Pond Dam (MA 00091), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. South Barre Mill Pond Dam (MA 00091), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 69

Get Book Here

Book Description
The South Barre Mill Pond dam is a small dam consisting of two adjacent concrete ogee spillways, a short earth embankment on the right side and an outlet works to a penstock at the left abutment. The present dam, constructed about 1904, was extensively damaged in the floods of 1936 and 1938 and has been reconstructed on several occasions, the latest work in 1944. The dam is in fair to good condition. There are no obvious signs of failure or conditions which would warrant urgent remedial treatment. Hydraulic analyses indicate that the spillway will not pass one-half the probable maximum flood and the spillway is considered inadequate, Recommendations for remedial work include repair of concrete at the left training wall and right spillway weir and restoration of gates to good operating condition. Additional investigation of the right spillway weir is recommended, since no data are available concerning this portion of the structure.

National Program for Inspection of Non-Federal Dams. Powder Mill Pond Dam (MA 00092), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Powder Mill Pond Dam (MA 00092), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 107

Get Book Here

Book Description
Powder Mill Pond Dam is located on the Ware River approximately one mile upstream of South Barre, Massachusetts. The dam, reconstructed in 1908 to generate electric power for the Barre Wool Combing Company, consists of an upgated concrete spillway approximately 125 ft. long and 20 ft. high, a short emergency spillway and an outlet canal with two inoperative timber gates. The dam was extensively modified during the 1930's. Based on a visual examination of the structure, the facility is in fair to poor condition. Nevertheless, there was no evidence of structural failure or other conditions which would warrant urgent remedial treatment. Based on size and hazard classifications in accordance with Corps of Engineers guidelines, the test flood for this dam is the Probable Maximum Flood (PMF). The PMF outflow of 48,160 cfs would overtop the dam by 5.15 ft. With the water level at top of dam, the main and emergency spillways can pass 17,940 cfs which is 37 percent of the test flood.

National Program for Inspection of Non-Federal Dams. Whites Mill Pond Dam (MA 00630), Connecticut River Basin, Winchendon, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Whites Mill Pond Dam (MA 00630), Connecticut River Basin, Winchendon, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 88

Get Book Here

Book Description
White's Mill Pond dam which was built before 1923 is a 340-foot long earthfill dam with upstream and downstream dry stone masonry walls. The dam has a maximum height of 13 feet and consists of a spillway, low level outlet, an intake toi a plant, and an earth dike. The following deficiencies were observed at the site: severe seepage at several locations along the toe of the dam; downstream stone masonry walls are out of plumb; lack of access to the low level outlet operator; erosion at the low point of the dam crest; bulging of the downstream masonry wall in several locations; stone missing from the upstream face of the spillway, mortar missing from the stone masonry spillway of the dam; heavy growth of brush and trees on the dam crest and on the dike; and an accumulation of debris in the discharge channel. Hydraulic analyses indicate that the spillway (without stoplogs) can discharge 520 cfs, or 76 percent of the test flood outflow before the dam is overtopped. (With the stoplogs, the spillway can discharge 170 cfs or 22 percent of the test flood outflow before the dam is overtopped).

National Program for Inspection of Non-Federal Dams. Silver Lake Dam (MA 00066), Connecticut River Basin, Springfield, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Silver Lake Dam (MA 00066), Connecticut River Basin, Springfield, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 94

Get Book Here

Book Description
Silver Lake Dam is an earthfill embankment about 85 feet long, 12 feet high with a crest width averaging about 30 feet. The project appears to be in fair condition. Since the dam is classified as small in size, with a significant hazard potential, the test flood is one half the PMF. (Author).

National Program for Inspection of Non-Federal Dams. Lyman Mill Pond (MA 00500), Connecticut River Basin, Southampton, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Lyman Mill Pond (MA 00500), Connecticut River Basin, Southampton, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 89

Get Book Here

Book Description
The dam is a buttressed ten foot high, 90 feet wide spillway, with concrete training walls. The visual inspection of the dam indicated it to be in generally fair condition, due to the finding of a seepage boil. The dam has a size classification of small and a hazard classification of low. It is recommended that the owner engage a qualified engineer to investigate the foundation of the right abutment wall and if necessary, design a seepage protection system where a seepage boil was found.

National Program for Inspection of Non-Federal Dams. Mill Pond Dam (CT 00164), Connecticut River Basin, Newington, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Mill Pond Dam (CT 00164), Connecticut River Basin, Newington, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 56

Get Book Here

Book Description
Mill Pond Dam is an earth-covered, irregular natural rock formation 600 ft. long, with a top width varying from 10 to 20 ft. and a maximum height of 19 ft. The outlet for the dam is a natural rock weir spillway approximately 35 ft. wide, which is overpassed by a footbridge. The crest of the spillway is about 3 ft. below the lowest point on the dam crest. Based on visual inspection, the Mill Pond Dam is judged to be in good condition; however, during the inspection, there was a light snow cover of approximately 2 inches which may have obscured problems, such as erosion or seepage. A test flood of a 100 year frequency was selected in accordance with the Corps of Engineers' Guidelines. The calculated test flood inflow of 1,000 cfs results in a routed outflow of 990 cfs. With the water level at the top of the dam the spillway capacity is 575 cfs which is 58% of the outflow flood. The storage capacity of the Mill Pond is 52 ac.-ft. at the top of the dam.

National Program for Inspection of Non-Federal Dams. Snows Mill Pond Dam (MA 00878), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Snows Mill Pond Dam (MA 00878), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 101

Get Book Here

Book Description
The dam consists of an earth dike, about 250 ft. long on the left bank of the river, and a z-shaped stone masonry spillway about 212 ft. long. The dam itself is generally in good condition. There was no evidence of settlement, lateral movement or other signs of structural failure. It is small in size with a high hazard potential.

National Program for Inspection of Non-Federal Dams. Indian Orchard (MA 00722), Connecticut River Basin, Springfield/Ludlow, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Indian Orchard (MA 00722), Connecticut River Basin, Springfield/Ludlow, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 75

Get Book Here

Book Description
The dam is generally comprised of a 401-foot long, 10 to 28 foot high main spillway, a head gate building, an overflow canal spillway and a canal leading to two 8 foot diameter penstocks used in electrical power generation. There are two inoperable gates located in the main dam. The dam is normally operated with two feet of flashboards above the spillway crest. The visual inspection did not disclose any findings that indicate an immediate unsafe condition. The 1 /2 PMF test flood used will produce an inflow/outflow of 70,830 cfs. The dam is a run-of-the-river type and the spillway crest would be overtopped by about 14 feet. The spillway has a capacity of 29,500 cfs (42 percent of 1/2 PMF outlfow) at elevation 166.6, top of non-overflow section. The non-overflow section is overtopped by about six feet. This flow would not overtop the upstream training walls which are at elevation 174.0. The overall condition of the dam is considered fair due to the lack of adequate draw down capacity. Remedial measures consist of removing vegetation from the downstream face of the dam, further observation of seepage at the right abutment, repair the wooden crest cover, and develop a formal warning system to warn downstream areas in case of an emergency.

National Program for Inspection of Non-Federal Dams. Whiting Street Pond Dam (MA 00070), Connecticut River Basin, Holyoke, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Whiting Street Pond Dam (MA 00070), Connecticut River Basin, Holyoke, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 76

Get Book Here

Book Description
Whiting Street Pond Dam is an earth-buttresed stone masonry dam, 1900 feet long with a maximum height of about 19 feet. A two level stone masonry and concrete spillway is located about 70 feet from the dam's south abutment. A gatehouse and gate chamber are located at approximately the center of the dam and contain the operating mechanisms for controlling the outflows into the City's Water Supply and to the low level outlet. Discharges from the low level outlet and the spillway converge and flow into an unnamed creek before emptying into the Connecticut River. Phase I inspection and evaluation of Whiting Street Pond Dam does not indicate conditions which would constitute an immediate hazard to human life or property. Based on engineering judgement and the performance of the dam and the outlet works, the project is considered to be in fair condition. The project, however, does have a number of deficiencies which, if not remedied, have the potential for developing into hazardous conditions. The test flood, in accordance with Corps of Engineers guidelines, is the Probable Maximum Flood (PMF). The PMF yields an outflow of 8253 cfs which is greater than the maximum discharge capacity of the spillway of 215 cfs and would result in overtopping of the dam by about 1.4 feet.