Lower Snake River Juvenile Salmon Migration Feasibility Report/environmental Impact Statement: Chapters 1-4

Lower Snake River Juvenile Salmon Migration Feasibility Report/environmental Impact Statement: Chapters 1-4 PDF Author:
Publisher:
ISBN:
Category : Chinook salmon
Languages : en
Pages : 60

Get Book

Book Description

Lower Snake River Juvenile Salmon Migration Feasibility Report/environmental Impact Statement: Chapters 1-4

Lower Snake River Juvenile Salmon Migration Feasibility Report/environmental Impact Statement: Chapters 1-4 PDF Author:
Publisher:
ISBN:
Category : Chinook salmon
Languages : en
Pages : 60

Get Book

Book Description


Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement PDF Author:
Publisher:
ISBN: 9781423505259
Category :
Languages : en
Pages : 368

Get Book

Book Description
The Corps of Engineers, along with the Bonneville Power Administration, U.S. Environmental Protection Agency, and U.S. Bureau of Reclamation as cooperating agencies, analyzed four general alternatives intended to provide information on the technical, environmental, and economic effects of actions related to improving juvenile salmon passage. The four alternatives include Alternative 1-Existing Conditions (the no-action alternative) and three different ways to further improve juvenile salmon passage. The action alternatives are as follows: Alternative 2- Maximum Transport of Juvenile Salmon; Alternative 3-Major System Improvements; and Alternative 4-Dam Breaching. Based on a thorough examination of the best available biological, economic, social, and other environmental information, Alternative 3-Major System Improvements has been selected as the recommended plan (preferred alternative).

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement PDF Author:
Publisher:
ISBN: 9781423505242
Category :
Languages : en
Pages : 547

Get Book

Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U.S. Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project. The Final FR/EIS includes the best available information on the biological effectiveness, engineering components, costs, economic effects, and other environmental effects associated with the four alternatives: Alternative 1-Existing Conditions, Alternative 2-Maximum Transport of Juvenile Salmon, Alternative 3-Major System Improvements (Adaptive Migration), and Alternative 4-Dam Breaching. In the Final FR/EIS, the Corps identifies Alternative 3-Major System Improvements (adaptive Migration) as the recommended plan (preferred alternative) and explains the process for selecting the alternative.

Lower Snake River Juvenile Salmon Migration Feasibility Report

Lower Snake River Juvenile Salmon Migration Feasibility Report PDF Author:
Publisher:
ISBN:
Category : Chinook salmon
Languages : en
Pages : 900

Get Book

Book Description


Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement Appendix N Cultural Resources

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement Appendix N Cultural Resources PDF Author:
Publisher:
ISBN: 9781423551058
Category :
Languages : en
Pages : 64

Get Book

Book Description
The Corps of Engineers along with the Bonneville Power Administration, US Environmental Protection Agency, and US Bureau of Reclamation as cooperating agencies, analyzed four general alternatives intended to provide information on the technical, environmental, and economic effects of actions related to improving juvenile salmon passage. The four alternatives include Alternative 1 - Existing Conditions (the no-action alternative) and three different ways to further improve juvenile salmon passage. The action alternatives are: Alternative 2 Maximum Transport of Juvenile Salmon, Alternative 3 - Major System Improvements, and Alternative 4 - Dam Breaching. Comparison of the alternatives by all of the factors assessed in the study has not offered a clear-cut recommendation at this time. It is the Corps of Engineer's intent to recommend a preferred plan of action in the Final FR/EIS.

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix D. Natural River Drawdown Engineering

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix D. Natural River Drawdown Engineering PDF Author:
Publisher:
ISBN: 9781423531425
Category :
Languages : en
Pages : 388

Get Book

Book Description
The Corps of Engineers along with the Bonneville Power Administration, US Environmental Protection Agency, and US Bureau of Reclamation as cooperating agencies, analyzed four general alternatives intended to provide information on the technical, environmental, and economic effects of actions related to improving juvenile salmon passage. The four alternatives include Alternative 1 - Existing Conditions (the no-action alternative) and three different ways to further improve juvenile salmon passage. The action alternatives are: Alternative 2 - Maximum Transport of Juvenile Salmon, Alternative 3 Major System Improvements, and Alternative 4 - Darn Breaching. Comparison of the alternatives by all of the factors assessed in the study has not offered a clear-cut recommendation at this time. It is the Corps of Engineer's intent to recommend a preferred plan of action in the Final FR/EIS.

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement PDF Author:
Publisher:
ISBN: 9781423531708
Category :
Languages : en
Pages : 685

Get Book

Book Description
The Corps of Engineers along with the Bonneville Power Administration, US Environmental Protection Agency, and US Bureau of Reclamation as cooperating agencies, analyzed four general alternatives intended to provide information on the technical, environmental, and economic effects of actions related to improving juvenile salmon passage. The four alternatives include Alternative 1 - Existing Conditions (the no-action alternative) and three different ways to further improve juvenile salmon passage. The action alternatives are: Alternative 2 - Maximum Transport of Juvenile Salmon, Alternative 3 - Major System Improvements, and Alternative 4 - Dam Breaching. Comparison of the alternatives by all of the factors assessed in the study has not offered a clear-cut recommendation at this time. It is the Corps of Engineers intent to recommend a preferred plan of action in the Final FR/EIS.

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement Appendix G Hydroregulations

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement Appendix G Hydroregulations PDF Author:
Publisher:
ISBN: 9781423531685
Category :
Languages : en
Pages : 176

Get Book

Book Description
The Corps of Engineers along with the Bonneville Power Administration, US Environmental Protection Agency, and US Bureau of Reclamation as cooperating agencies, analyzed four general alternatives intended to provide information on the technical, environmental, and economic effects of actions related to improving juvenile salmon passage. The four alternatives include Alternative 1 - Existing Conditions (the no-action alternative) and three different ways to further improve juvenile salmon passage. The action alternatives are: Alternative 2 - Maximum Transport of Juvenile Salmon, Alternative 3 - Major System Improvements, and Alternative 4 - Dam Breaching. Comparison of the alternatives by all of the factors assessed in the study has not offered a clear-cut recommendation at this time. It is the Corps of Engineer's intent to recommend a preferred plan of action in the Final FR/EIS.

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix J

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix J PDF Author:
Publisher:
ISBN: 9781423504931
Category :
Languages : en
Pages : 119

Get Book

Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U S Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project

Lower Snake River Juvenile Salmon Migration Feasibility Report/Environmental Impact Statement. Appendix L: Lower Snake River Mitigation History and Status. Appendix M: Fish and Wildlife Coordination Act Report

Lower Snake River Juvenile Salmon Migration Feasibility Report/Environmental Impact Statement. Appendix L: Lower Snake River Mitigation History and Status. Appendix M: Fish and Wildlife Coordination Act Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 393

Get Book

Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U.S. Bureau of reclamation (BOR) as cooperating agencies, analyzed four alternative to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project. The Final FR/EIS includes the best available information on the biological effectiveness, engineering components, costs, economic effects, and other environmental effects associated with the four alternatives: Alternative 1-Existing Conditions, Alternative 2-Maximum Transport of Juvenile Salmon, Alternative 3-Major System Improvements (Adaptive Migration), and Alternative 4-Dam Breaching. In the Final FR/EIS, the Corps identifies Alternative 3-Major System Improvements (Adaptive Migration) as the recommended plan (preferred alternative) and explains the process for selecting that alternative.