Investigation of the Geokinetics horizontal in situ oil shale retorting process

Investigation of the Geokinetics horizontal in situ oil shale retorting process PDF Author: Geokinetics Inc
Publisher:
ISBN:
Category : In situ processing (Mining)
Languages : en
Pages :

Get Book Here

Book Description

Investigation of the Geokinetics horizontal in situ oil shale retorting process

Investigation of the Geokinetics horizontal in situ oil shale retorting process PDF Author: Geokinetics Inc
Publisher:
ISBN:
Category : In situ processing (Mining)
Languages : en
Pages :

Get Book Here

Book Description


Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process

Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process

Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process PDF Author: David L. Hutchinson
Publisher:
ISBN:
Category : In situ processing (Mining)
Languages : en
Pages : 36

Get Book Here

Book Description


Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process

Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process PDF Author: Kenneth B. Henderson
Publisher:
ISBN:
Category : In situ processing (Mining)
Languages : en
Pages : 145

Get Book Here

Book Description


Investigation of the Geokinetics Horizontal in Situ Oil-shale-retorting Process. Fourth Annual Report, 1980

Investigation of the Geokinetics Horizontal in Situ Oil-shale-retorting Process. Fourth Annual Report, 1980 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
The Geokinetics in situ shale oil project is a cooperative venture between Geokinetics Inc. and the US Department of Energy. The objective is to develop a true in situ process for recovering shale oil using a fire front moving in a horizontal direction. The project is being conducted at a field site, Kamp Kerogen, located 70 miles south of Vernal, Utah. This Fourth Annual Report covers work completed during the calendar year 1980. During 1980 one full-size retort was blasted. Two retorts, blasted the previous year, were burned. A total of 4891 barrels of oil was produced during the year.

Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process. Quarterly Report, January, February, March 1981

Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process. Quarterly Report, January, February, March 1981 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
Retort No. 23 has been heavily instrumented and was ignited on March 16, 1981. A total of 6588 barrels of shale oil have been recovered from Retort No. 24 to date; 6057 barrels of oil were recovered during the quarter, an average of 65 barrels per day. Approximately 4909 barrels of shale oil were shipped by tanker truck to the WESRECO refinery in Salt Lake City, Utah, during the quarter. Drilling of re-entry process and instrumentation wells on Retort No. 25 was completed. A post-burn core sampling program for Retort No. 18 was developed and implemented.

Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process

Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process PDF Author: Steven Bartlett
Publisher:
ISBN:
Category : Oil sands
Languages : en
Pages : 0

Get Book Here

Book Description
The Geokinetics in situ shale oil project is a cooperative venture between Geokinetics and the US Department of Energy. The objective is to develop a true in situ process for recovering shale oil using a fire front moving in a horizontal direction. The project is being conducted at a field site, Kamp Kerogen, located 70 miles south of Vernal, Utah. This fifth annual report covers work completed during the calendar year 1981. During 1981, one full sized retort (Retort No. 26) was blasted and the following three retorts were processed: (1) Retort No. 24 operations were continued until July 23; (2) Retort No. 23 was ignited and processed during the calendar year; (3) Retort No. 25 was ignited and burned for 77 days during 1981.

Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process

Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process PDF Author: Kenneth B. Henderson
Publisher:
ISBN:
Category :
Languages : en
Pages : 0

Get Book Here

Book Description


Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process. Quarterly Report, October, November, December 1983

Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process. Quarterly Report, October, November, December 1983 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
Retort No. 27 was ignited on August 11, 1983 and by December 31 had completed 139 days of operation and produced 11,420 barrels of oil. Retort No. 28 was ignited on October 18, 1983 and on December 31 had completed 74 days of operation and produced 5,285 barrels of oil. The off-gas processing plants for the two retorts was completed and put through a shakedown run. Concentration levels of H2S and NH3 in the retort off gas did not warrant plant operation in the fourth quarter. Environmental studies are reported.

Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process

Investigation of the Geokinetics Horizontal in Situ Oil Shale Retorting Process PDF Author: Steven Bartlett
Publisher:
ISBN:
Category : Oil sands
Languages : en
Pages : 0

Get Book Here

Book Description
The Retort No. 25 burn was terminated on June 15, 1982. Total oil production for the second quarter was 6506 barrels during a 76 day production period. Final oil production for Retort No. 25 was 20,956 barrels. Final oil recovery was calculated to be 59% of the total in-place oil. Fugitive emissions, stack and process gas data indicated that all Retort No. 25 pollutants, except NO/sub x/, were below the allowable PSD limits. The Retort No. 25 process water characterization study was completed in April to determine the changes in retort produced water as the retort burn progressed. Results of the study are pending the completion of laboratory analysis. Retort No. 26 was prepared for ignition during the second quarter. Process manifolding and instrumentation were being completed so that ignition might occur shortly after the termination of the Retort No. 25 burn. Post blast core drilling and analysis was completed on Retort No. 27 during early April. The core samples indicated improved fracturing over previous retorts, especially near the bottom. Increasing the size of Retort No. 27 from one acre to two acres showed an increase in blast efficiency based on the criteria of fragmentation, quantity of explosives used per volume of void induced and percent void when compared with Retort No. 24. In June initial site preparation began on Retort No. 28 for blast hole drilling which will start in July.