Investigation of Production and Schedule Improvement Methods for Urban Interchange Reconstruction Projects

Investigation of Production and Schedule Improvement Methods for Urban Interchange Reconstruction Projects PDF Author: Seonghoon Kim
Publisher:
ISBN:
Category :
Languages : en
Pages : 422

Get Book Here

Book Description
This research was conducted to (1) analyze an earthmoving productivity, (2) develop detailed schedules for uban interchange reconstruction for the Iowa Department of Transportation (Iowa DOT), and (3) determine whether expediting urban interchange construction is possible solution for shortening duration for the reconstruction of Interstate 235 (I-235). The following projects were used as case studies in this research: (1) interchange reconstruction projects for the 14th Street, 19th Street, and 42nd Street in Des Moines, and 35th Street in West Des moines, (2) bridge demolition projects for the 19th Street, Martin Luther King Street, and 42nd Street in Des Moines in the reconstruction of I-235. The analysis results based on site observation and statistical analysis were described in the case studies. In earthmoving analysis, factors influencing earthmoving production rates, such as bucket capacity, number of passes, and hauling distance in urban interchange construction were significant. For the scheduling part, the as-built schedules for 35th Street in West Des Moines and 42nd Street in Des Moines were developed and compared with contractor's original schedule. The actual urban interchange construction schedule resulted in later completion than originally estimated by contractors. Even if earthwork, utility work, and paving processes were expedited based on the as-built schedules, the activities could be expedited aggresively to reduce the construction duration more. Expedited urban interchange construction is an alternative method to reduce total duration of the I-235 corridor work. Moreover, duration, cost, resource, and sequence for urban bridge demolition were influenced by traffic control and bridge type.

Investigation of Production and Schedule Improvement Methods for Urban Interchange Reconstruction Projects

Investigation of Production and Schedule Improvement Methods for Urban Interchange Reconstruction Projects PDF Author: Seonghoon Kim
Publisher:
ISBN:
Category :
Languages : en
Pages : 422

Get Book Here

Book Description
This research was conducted to (1) analyze an earthmoving productivity, (2) develop detailed schedules for uban interchange reconstruction for the Iowa Department of Transportation (Iowa DOT), and (3) determine whether expediting urban interchange construction is possible solution for shortening duration for the reconstruction of Interstate 235 (I-235). The following projects were used as case studies in this research: (1) interchange reconstruction projects for the 14th Street, 19th Street, and 42nd Street in Des Moines, and 35th Street in West Des moines, (2) bridge demolition projects for the 19th Street, Martin Luther King Street, and 42nd Street in Des Moines in the reconstruction of I-235. The analysis results based on site observation and statistical analysis were described in the case studies. In earthmoving analysis, factors influencing earthmoving production rates, such as bucket capacity, number of passes, and hauling distance in urban interchange construction were significant. For the scheduling part, the as-built schedules for 35th Street in West Des Moines and 42nd Street in Des Moines were developed and compared with contractor's original schedule. The actual urban interchange construction schedule resulted in later completion than originally estimated by contractors. Even if earthwork, utility work, and paving processes were expedited based on the as-built schedules, the activities could be expedited aggresively to reduce the construction duration more. Expedited urban interchange construction is an alternative method to reduce total duration of the I-235 corridor work. Moreover, duration, cost, resource, and sequence for urban bridge demolition were influenced by traffic control and bridge type.

Commencement

Commencement PDF Author: Iowa State University
Publisher:
ISBN:
Category : Commencement ceremonies
Languages : en
Pages : 366

Get Book Here

Book Description


Scientific and Technical Aerospace Reports

Scientific and Technical Aerospace Reports PDF Author:
Publisher:
ISBN:
Category : Aeronautics
Languages : en
Pages : 568

Get Book Here

Book Description


Development of Resources and of Economic Opportunity in the Pacific Northwest

Development of Resources and of Economic Opportunity in the Pacific Northwest PDF Author: Pacific Northwest Regional Planning Commission
Publisher:
ISBN:
Category : Natural resources
Languages : en
Pages : 248

Get Book Here

Book Description


Federal Register

Federal Register PDF Author:
Publisher:
ISBN:
Category : Administrative law
Languages : en
Pages : 1632

Get Book Here

Book Description


Construction Cost Management

Construction Cost Management PDF Author: Keith Potts
Publisher: Routledge
ISBN: 1135013454
Category : Technology & Engineering
Languages : en
Pages : 388

Get Book Here

Book Description
In this updated and expanded second edition, Keith Potts and Nii Ankrah examine key issues in construction cost management across the building and civil engineering sectors, both in the UK and overseas. Best practice from pre-contract to post-contract phases of the project life-cycle are illustrated using major projects such as Heathrow Terminal 5, Crossrail and the London 2012 Olympics as case studies. More worked examples, legal cases, case studies and current research have been introduced to cover every aspect of the cost manager’s role. Whole-life costing, value management, and risk management are also addressed, and self-test questions at the end of each chapter support independent learning. This comprehensive book is essential reading for students on surveying and construction management programmes, as well as built environment practitioners with cost or project management responsibilities.

Summary of Progress - National Cooperative Highway Research Program

Summary of Progress - National Cooperative Highway Research Program PDF Author: National Cooperative Highway Research Program
Publisher:
ISBN:
Category : Highway research
Languages : en
Pages : 298

Get Book Here

Book Description


US-31 Petoskey Area Transportation Improvement Project, City of Petoskey, Emmet County

US-31 Petoskey Area Transportation Improvement Project, City of Petoskey, Emmet County PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 498

Get Book Here

Book Description


Transportation Research Record

Transportation Research Record PDF Author:
Publisher:
ISBN:
Category : Air travel
Languages : en
Pages :

Get Book Here

Book Description


I-690, Lake Onondaga West Shore Development, Onondaga County

I-690, Lake Onondaga West Shore Development, Onondaga County PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 348

Get Book Here

Book Description