Implementation Completion and Results Report (IBRD-74590) on a Loan in the Amount of US$ 30 Million to the Republic of Chile for the Institutional Strengthening of the Ministry of Public Workds Development Policy Loan

Implementation Completion and Results Report (IBRD-74590) on a Loan in the Amount of US$ 30 Million to the Republic of Chile for the Institutional Strengthening of the Ministry of Public Workds Development Policy Loan PDF Author: World Bank. Latin America and the Caribbean Regional Office. Transport Unit. Sustainable Development Management Unit
Publisher:
ISBN:
Category : Finance, Public
Languages : en
Pages : 37

Get Book Here

Book Description
Ratings for the (MOPW) Project for Chile were as follows: outcomes were satisfactory, the risk to development outcome was moderate, the Bank performance was satisfactory, and the Borrower performance was also satisfactory. Some lessons learned included: the reform objectives were defined by the MOPW in close and extensive consultations with stakeholders internal and external to the MOPW. The World Bank has supported this participative approach and has encouraged the continuous monitoring and evaluation of the reform's analytical underpinnings. At the implementation stage, the MOPW leadership has strengthened the initiatives aimed at guaranteeing the continuous support of stakeholders. The change management component turned out to be critical to expand support for the reform. MOPW leadership also decided to increase training, capacity building, and technical support activities to facilitate the implementation of the reform. The project components, supported by the MOPW human resources department, have established ad-hoc committees, which serve as platforms for consulting with the MOPW unions. The Bank team highlighted during supervision missions the need to involve non-managerial personnel within the MOPW in Santiago and in the regions to increase understanding of the objectives pursued by the reform and to increase overall support. More stability of the Project Implementation Unit (PIU) coordinator office will enhance the synergies between the project components and leverage the policy dialogue with the Bank. This dialogue has been fruitful on climate change issues and can further be extended to other issues such as Public Private Partnerships (PPPs), renewable energy concessions, and energy efficiency. The stability of the PIU office will also improve the effectiveness of the change ma.

Implementation Completion and Results Report (IBRD-74590) on a Loan in the Amount of US$ 30 Million to the Republic of Chile for the Institutional Strengthening of the Ministry of Public Workds Development Policy Loan

Implementation Completion and Results Report (IBRD-74590) on a Loan in the Amount of US$ 30 Million to the Republic of Chile for the Institutional Strengthening of the Ministry of Public Workds Development Policy Loan PDF Author: World Bank. Latin America and the Caribbean Regional Office. Transport Unit. Sustainable Development Management Unit
Publisher:
ISBN:
Category : Finance, Public
Languages : en
Pages : 37

Get Book Here

Book Description
Ratings for the (MOPW) Project for Chile were as follows: outcomes were satisfactory, the risk to development outcome was moderate, the Bank performance was satisfactory, and the Borrower performance was also satisfactory. Some lessons learned included: the reform objectives were defined by the MOPW in close and extensive consultations with stakeholders internal and external to the MOPW. The World Bank has supported this participative approach and has encouraged the continuous monitoring and evaluation of the reform's analytical underpinnings. At the implementation stage, the MOPW leadership has strengthened the initiatives aimed at guaranteeing the continuous support of stakeholders. The change management component turned out to be critical to expand support for the reform. MOPW leadership also decided to increase training, capacity building, and technical support activities to facilitate the implementation of the reform. The project components, supported by the MOPW human resources department, have established ad-hoc committees, which serve as platforms for consulting with the MOPW unions. The Bank team highlighted during supervision missions the need to involve non-managerial personnel within the MOPW in Santiago and in the regions to increase understanding of the objectives pursued by the reform and to increase overall support. More stability of the Project Implementation Unit (PIU) coordinator office will enhance the synergies between the project components and leverage the policy dialogue with the Bank. This dialogue has been fruitful on climate change issues and can further be extended to other issues such as Public Private Partnerships (PPPs), renewable energy concessions, and energy efficiency. The stability of the PIU office will also improve the effectiveness of the change ma.

Implementation Completion and Results Report (IBRD-73150) on a Loan in the Amount of 30.165 Million to the Republic of Chile for a Santiago Urban Transport Programmatic Development Policy Loan

Implementation Completion and Results Report (IBRD-73150) on a Loan in the Amount of 30.165 Million to the Republic of Chile for a Santiago Urban Transport Programmatic Development Policy Loan PDF Author: World Bank. Latin America and the Caribbean Regional Office. Argentina, Chile, Paraguay and Uruguay Country Management Unit. Sustainable Development Management Unit
Publisher:
ISBN:
Category : Local transit
Languages : en
Pages : 71

Get Book Here

Book Description
Ratings for the Santiago Project for Chile were as follows: outcomes were moderately satisfactory, the risk to development outcome was moderate, the Bank performance was moderately satisfactory, and the Borrower performance was also moderately satisfactory. Some lessons learned included: lack of a holistic approach may result in emphasizing one concern over another, for example, focusing mainly on environmental and economic considerations may lead to a design with unnecessarily fewer and larger buses. However, fewer and larger buses reduce comfort and increase waiting times. Such a decrease in service quality is a disincentive for public transport use and will, at least in the long run, go against environmental and economic considerations. Hence, it is important that a design that includes user participation finds the right balance between environmental and economic considerations and service quality. Travel and network models are excellent tools to evaluate network designs, but over reliance on normative analytical tools that 'optimize' a network subject to a set of assumptions, especially in areas that assume behavioral changes, should be avoided. The modeling exercise also needs to include 'bottom up' inputs, such as information on the importance in terms of overall weight people give to transfers, waiting, and walking. The Santiago experience showed that it is not advisable to redesign the public transport network without considering the existing information on travel demand and destination available through the operators. Additionally, stakeholders' involvement in the network design process, especially the municipalities comprising the metropolitan area, operators and users, is essential, and the design concept for the network needs to be extensively modeled before implementation.

Implementation Completion and Results Report (IBRD-46500; IBRD-71410) on a Loan in the Amount of US$23.3 Million to the Republic of Chile for the First Public Expenditure Management Project

Implementation Completion and Results Report (IBRD-46500; IBRD-71410) on a Loan in the Amount of US$23.3 Million to the Republic of Chile for the First Public Expenditure Management Project PDF Author: World Bank. Latin America and the Caribbean Regional Office. Argentina, Chile, Uruguay and Paraguay Country Management Unit. Poverty Reduction and Economic Management Unit
Publisher:
ISBN:
Category : Expenditures, Public
Languages : en
Pages : 32

Get Book Here

Book Description


Implementation Completion and Results Report (IBRD-74080) on a Loan in the Amount of US$60.0 Million to the Republic of Panama for a Public Finance and Institutional Development Policy Loan

Implementation Completion and Results Report (IBRD-74080) on a Loan in the Amount of US$60.0 Million to the Republic of Panama for a Public Finance and Institutional Development Policy Loan PDF Author: World Bank. Latin America and the Caribbean Regional Office. Central America Country Management Unit. Poverty Reduction and Economic Management Unit
Publisher:
ISBN:
Category : Finance, Public
Languages : en
Pages : 33

Get Book Here

Book Description


Implementation Completion and Results Report (IBRD-40930 IBRD-4093A IBRD-4093S)on a Loan in the Amount of US$300 Million to the Argentine Republic for a Provincial Roads Project

Implementation Completion and Results Report (IBRD-40930 IBRD-4093A IBRD-4093S)on a Loan in the Amount of US$300 Million to the Argentine Republic for a Provincial Roads Project PDF Author: World Bank. Latin America and the Caribbean Regional Office. Argentina, Chile, Uruguay and Paraguay Country Management Unit. Sustainable Development Dept
Publisher:
ISBN:
Category : Express highways
Languages : en
Pages : 51

Get Book Here

Book Description


Implementation Completion and Results Report (IBRD-71640)(loan/credit No. P078726) on a Structural Adjustment Loan in the Amount of US$151.52 Million to the Oriental Republic of Uruguay for a Public Services and Social Sectors Structural Adjustment Loan

Implementation Completion and Results Report (IBRD-71640)(loan/credit No. P078726) on a Structural Adjustment Loan in the Amount of US$151.52 Million to the Oriental Republic of Uruguay for a Public Services and Social Sectors Structural Adjustment Loan PDF Author: World Bank. Latin America and the Caribbean Regional Office. Argentina, Chile, Uruguay and Paraguay Country Management Unit. Sustainable Development Management Unit
Publisher:
ISBN:
Category : Business enterprises
Languages : en
Pages : 73

Get Book Here

Book Description


Implementation Completion and Results Report (IBRD-43790 JPN-26461) on a Loan in the Amount of US$ 30.0 Million to the Republic of Guatemala for a Reconstruction and Local Development Project

Implementation Completion and Results Report (IBRD-43790 JPN-26461) on a Loan in the Amount of US$ 30.0 Million to the Republic of Guatemala for a Reconstruction and Local Development Project PDF Author: World Bank. Latin America and the Caribbean Regional Office. Central America Country Management Unit. Social Protection Sector
Publisher:
ISBN:
Category : Education
Languages : en
Pages : 52

Get Book Here

Book Description


Implementation Completion and Results Report (EXIM-03830 IBRD-41170) on a Loan the Amount of US$225.24 Million to Argentina Republic for a Flood Protection Project

Implementation Completion and Results Report (EXIM-03830 IBRD-41170) on a Loan the Amount of US$225.24 Million to Argentina Republic for a Flood Protection Project PDF Author: World Bank. Latin America and the Caribbean Regional Office. Argentina, Chile, Uruguay and Paraguay Country Management Unit. Sustainable Development Dept
Publisher:
ISBN:
Category : Emergency management
Languages : en
Pages : 58

Get Book Here

Book Description


Implementation Completion and Results Report (IBRD-45240)on a Loan/credit in the Amount of US$ Million 15.0 (US$ 15.0 Million Loan) to the Federative Republic of Brazil for Second National Environmental Project (in Support of the First Phase of the Second National Environmental Program)

Implementation Completion and Results Report (IBRD-45240)on a Loan/credit in the Amount of US$ Million 15.0 (US$ 15.0 Million Loan) to the Federative Republic of Brazil for Second National Environmental Project (in Support of the First Phase of the Second National Environmental Program) PDF Author: World Bank. Latin America and the Caribbean Regional Office. Brazil Country Management Unit. Sustainable Development Dept
Publisher:
ISBN:
Category : Environmental policy
Languages : en
Pages : 55

Get Book Here

Book Description


Implementation Completion and Results Report (IBRD-72610) for a Housing and Urban Technical Assistance Loan in the Amount of US$7.77 Million to the United Mexican States

Implementation Completion and Results Report (IBRD-72610) for a Housing and Urban Technical Assistance Loan in the Amount of US$7.77 Million to the United Mexican States PDF Author: World Bank. Latin America and the Caribbean Regional Office. Mexico and Colombia Country Management Unit. Sustainable Development Management Unit
Publisher:
ISBN:
Category : Housing
Languages : en
Pages : 47

Get Book Here

Book Description
Ratings for the (HUTAL) Project for Mexico were as follows: outcomes were moderately unsatisfactory, the risk to development outcome was low or negligible, the Bank performance was moderately satisfactory, and the Borrower performance was also moderately satisfactory. Some lessons learned included: the HUTAL experience suggests that technical assistance lending may actually set policy dialogue back by focusing Bank and client time on bureaucratic procedural issues and, in the case of HUTAL, by a de facto relinquishing of policy dialogue to other institutions like (IADB) which are supporting specific investment programs (HABITAT). Recently the Mexico country department has been engaging in sector policy dialogue through non-reimbursable technical assistance, grant funded Economic Sector Work (ESW), stepped-up fee-for service work, and memos-of understanding, in addition to preparation and supervision of Development Policy Loan (DPL). Time will tell how these instruments work to sustain productive policy dialogues. One tool the Bank could consider will be increased South-South or South-North exchanges to bring the Bank's global knowledge to bear in client countries. Traditionally Technical Assistance Lending (TAL) offers a means of supporting nascent and weak institutions and of preparing for investment operations. In a Middle Income Country (MIC), however, the costs of setting up and operating public institutions are covered by existing government revenue.