Author: Great Britain: Parliament: House of Commons: Energy and Climate Change Committee
Publisher: The Stationery Office
ISBN: 9780215061478
Category : Business & Economics
Languages : en
Pages : 142
Book Description
Government provides support to households who install small-scale renewable energy systems through Feed-in Tariffs (FiT), while large scale projects like off-shore wind farms will soon be supported through new fixed-price Contracts for Difference (CfDs). Medium sized energy projects of between 10 - 50 Megawatts (MW) currently fall in the gap and do not receive support. Giving communities a stake in local energy projects has the potential to broaden public understanding of energy issues and could also enhance the security and efficiency of the energy system as a whole. This report identifies a number of barriers that can prevent local energy projects getting off the ground. Securing funding and Power Purchase Agreements, connecting to the grid and overcoming public opposition can all prove difficult. Obtaining planning permission can be costly and time-consuming, and the risk of losing tens of thousands of pounds if permission is not granted is a huge obstacle for community groups or small cooperatives. Some form of support mechanism is needed alongside a comprehensive package of measures addressing finance, planning, grid access and advice. The Green Investment Bank could provide seed funding and project development funding for feasibility studies, grid permits, etc to reduce some of the risk in getting projects through the planning process. Government needs to do more to encourage local authorities to identify suitable areas for renewable energy development and to develop clear guidance about what is expected from local energy projects. National level planning guidance should be provided on technical issues that hold up planning consent for wind turbines and other low-carbon technologies
House of Commons - Energy and Climate Change Committee: Local Energy - HC 180
Author: Great Britain: Parliament: House of Commons: Energy and Climate Change Committee
Publisher: The Stationery Office
ISBN: 9780215061478
Category : Business & Economics
Languages : en
Pages : 142
Book Description
Government provides support to households who install small-scale renewable energy systems through Feed-in Tariffs (FiT), while large scale projects like off-shore wind farms will soon be supported through new fixed-price Contracts for Difference (CfDs). Medium sized energy projects of between 10 - 50 Megawatts (MW) currently fall in the gap and do not receive support. Giving communities a stake in local energy projects has the potential to broaden public understanding of energy issues and could also enhance the security and efficiency of the energy system as a whole. This report identifies a number of barriers that can prevent local energy projects getting off the ground. Securing funding and Power Purchase Agreements, connecting to the grid and overcoming public opposition can all prove difficult. Obtaining planning permission can be costly and time-consuming, and the risk of losing tens of thousands of pounds if permission is not granted is a huge obstacle for community groups or small cooperatives. Some form of support mechanism is needed alongside a comprehensive package of measures addressing finance, planning, grid access and advice. The Green Investment Bank could provide seed funding and project development funding for feasibility studies, grid permits, etc to reduce some of the risk in getting projects through the planning process. Government needs to do more to encourage local authorities to identify suitable areas for renewable energy development and to develop clear guidance about what is expected from local energy projects. National level planning guidance should be provided on technical issues that hold up planning consent for wind turbines and other low-carbon technologies
Publisher: The Stationery Office
ISBN: 9780215061478
Category : Business & Economics
Languages : en
Pages : 142
Book Description
Government provides support to households who install small-scale renewable energy systems through Feed-in Tariffs (FiT), while large scale projects like off-shore wind farms will soon be supported through new fixed-price Contracts for Difference (CfDs). Medium sized energy projects of between 10 - 50 Megawatts (MW) currently fall in the gap and do not receive support. Giving communities a stake in local energy projects has the potential to broaden public understanding of energy issues and could also enhance the security and efficiency of the energy system as a whole. This report identifies a number of barriers that can prevent local energy projects getting off the ground. Securing funding and Power Purchase Agreements, connecting to the grid and overcoming public opposition can all prove difficult. Obtaining planning permission can be costly and time-consuming, and the risk of losing tens of thousands of pounds if permission is not granted is a huge obstacle for community groups or small cooperatives. Some form of support mechanism is needed alongside a comprehensive package of measures addressing finance, planning, grid access and advice. The Green Investment Bank could provide seed funding and project development funding for feasibility studies, grid permits, etc to reduce some of the risk in getting projects through the planning process. Government needs to do more to encourage local authorities to identify suitable areas for renewable energy development and to develop clear guidance about what is expected from local energy projects. National level planning guidance should be provided on technical issues that hold up planning consent for wind turbines and other low-carbon technologies
HC 386 - Energy Network Costs: Transparent and Fair?
Author: Great Britain. Parliament. House of Commons. Energy and Climate Change Committee
Publisher: The Stationery Office
ISBN: 0215081609
Category : Electric utilities
Languages : en
Pages : 40
Book Description
Network costs (which cover the transmission and distribution of gas and electricity from power stations to households and industry) are a very significant component of household and industrial energy bills. Ofgem has created a new regulatory framework (RIIO) that was designed to ensure that costs were competitive and that profits weren't excessive, but there is clear evidence that network companies are making higher profits than expected. This suggests that the targets and incentives set by Ofgem are too low, barriers to market entry are high and that Ofgem needs to monitor RIIO more effectively and to equip RIIO with stronger, corrective measures. Ofgem has not yet created the conditions for the market to thrive and provide consumers with best value for money. In the short-term, market conditions can be improved if: (i) an interim independent audit of price controls is conducted; (ii) the 40-day notification period for price changes is increased to 15 months; and (iii) stronger, corrective measures are applied to companies that have received incentive payments for reducing leakages when such reductions have not taken place.
Publisher: The Stationery Office
ISBN: 0215081609
Category : Electric utilities
Languages : en
Pages : 40
Book Description
Network costs (which cover the transmission and distribution of gas and electricity from power stations to households and industry) are a very significant component of household and industrial energy bills. Ofgem has created a new regulatory framework (RIIO) that was designed to ensure that costs were competitive and that profits weren't excessive, but there is clear evidence that network companies are making higher profits than expected. This suggests that the targets and incentives set by Ofgem are too low, barriers to market entry are high and that Ofgem needs to monitor RIIO more effectively and to equip RIIO with stronger, corrective measures. Ofgem has not yet created the conditions for the market to thrive and provide consumers with best value for money. In the short-term, market conditions can be improved if: (i) an interim independent audit of price controls is conducted; (ii) the 40-day notification period for price changes is increased to 15 months; and (iii) stronger, corrective measures are applied to companies that have received incentive payments for reducing leakages when such reductions have not taken place.
HC 348 - The Green Deal: Watching Brief (Part 2)
Author: Great Britain: Parliament: House of Commons: Energy and Climate Change Committee
Publisher: The Stationery Office
ISBN: 0215075994
Category : Business & Economics
Languages : en
Pages : 52
Book Description
The Green Deal was launched in January 2013 to help Britain's households and businesses make energy efficiency improvements. The Government has called it "a long-term and progressive programme. In December 2012, the Committee launched Green Deal: watching brief inquiry, to follow the Green Deal from its inception and monitor its debut on the UK market. In May 2013, the Committee published the Green Deal: watching brief report in which were outlined concerns about the lack of clarity regarding the outcomes that Department of Energy and Climate Change (DECC) expected from the Green Deal. Green Deal: watching brief (part 2) reviews the performance of the Green Deal and Energy Company Obligation (ECO) in the seven key areas outlined in the previous report, assess DECC's approach to evaluating and monitoring the performance of the Green Deal and ECO, and considers DECC's recent proposals to improve the Green Deal and reduce the cost of ECO. The report found that the Green Deal, rather than facilitating access to energy efficiency measures and creating momentum in the market, has caused frustration and confusion for both consumers and businesses in the supply chain. Only 4,000 Green Deal plans have so far been initiated. As a result, carbon savings through Green Deal finance have been negligible. Therefore the Government must re-evaluate its approach and set out a clear strategy to revive the failing scheme, as unless the package is made more attractive to a wider group of consumers, Green Deal finance is likely to remain unappealing to many.
Publisher: The Stationery Office
ISBN: 0215075994
Category : Business & Economics
Languages : en
Pages : 52
Book Description
The Green Deal was launched in January 2013 to help Britain's households and businesses make energy efficiency improvements. The Government has called it "a long-term and progressive programme. In December 2012, the Committee launched Green Deal: watching brief inquiry, to follow the Green Deal from its inception and monitor its debut on the UK market. In May 2013, the Committee published the Green Deal: watching brief report in which were outlined concerns about the lack of clarity regarding the outcomes that Department of Energy and Climate Change (DECC) expected from the Green Deal. Green Deal: watching brief (part 2) reviews the performance of the Green Deal and Energy Company Obligation (ECO) in the seven key areas outlined in the previous report, assess DECC's approach to evaluating and monitoring the performance of the Green Deal and ECO, and considers DECC's recent proposals to improve the Green Deal and reduce the cost of ECO. The report found that the Green Deal, rather than facilitating access to energy efficiency measures and creating momentum in the market, has caused frustration and confusion for both consumers and businesses in the supply chain. Only 4,000 Green Deal plans have so far been initiated. As a result, carbon savings through Green Deal finance have been negligible. Therefore the Government must re-evaluate its approach and set out a clear strategy to revive the failing scheme, as unless the package is made more attractive to a wider group of consumers, Green Deal finance is likely to remain unappealing to many.
HC 739 - Linking Emissions Trading Systems
Author: Great Britain. Parliament. House of Commons. Energy and Climate Change Committee
Publisher: The Stationery Office
ISBN: 0215081544
Category : Business & Economics
Languages : en
Pages : 48
Book Description
Carbon pricing is a necessary element in spurring climate change mitigation action. In this report it's argued that emissions trading, as an established and well recognised policy instrument for controlling greenhouse gas emissions, is increasingly popular and spreading around the world. As they develop, emissions trading systems should be designed so that they are compatible with each other. Aligning design elements early on will help improve the prospects of linking different systems in future and, therefore, maximise opportunities for cost-effective emissions reductions. As the world's oldest and largest market, the EU Emission Trading System will play a critical role in facilitating linking between different markets. Before it can do this, however, it must be seen as a credible market. The issue of surplus allowances must be addressed urgently and there should be moves to remove these from the system as soon as possible. Any new climate agreement must crucially allow parties to meet their Intended Nationally Determined Contribution's (INDCs) by transferring parts of their contributions to other parties and financing emissions reduction activities in other countries. The use of carbon markets will greatly improve the prospects of keeping global average temperatures below 2ĂȘC. Any agreement reached at the UNFCCC COP 21 in Paris at the end of 2015 should promote the use of carbon markets and facilitate the future linking of emissions trading systems. The UNFCCC could also play a critical role in providing basic standards including monitoring, reporting and verification.
Publisher: The Stationery Office
ISBN: 0215081544
Category : Business & Economics
Languages : en
Pages : 48
Book Description
Carbon pricing is a necessary element in spurring climate change mitigation action. In this report it's argued that emissions trading, as an established and well recognised policy instrument for controlling greenhouse gas emissions, is increasingly popular and spreading around the world. As they develop, emissions trading systems should be designed so that they are compatible with each other. Aligning design elements early on will help improve the prospects of linking different systems in future and, therefore, maximise opportunities for cost-effective emissions reductions. As the world's oldest and largest market, the EU Emission Trading System will play a critical role in facilitating linking between different markets. Before it can do this, however, it must be seen as a credible market. The issue of surplus allowances must be addressed urgently and there should be moves to remove these from the system as soon as possible. Any new climate agreement must crucially allow parties to meet their Intended Nationally Determined Contribution's (INDCs) by transferring parts of their contributions to other parties and financing emissions reduction activities in other countries. The use of carbon markets will greatly improve the prospects of keeping global average temperatures below 2ĂȘC. Any agreement reached at the UNFCCC COP 21 in Paris at the end of 2015 should promote the use of carbon markets and facilitate the future linking of emissions trading systems. The UNFCCC could also play a critical role in providing basic standards including monitoring, reporting and verification.
HC 830 - Fuelling the Debate: Committee Successes and Future Challenges
Author: Great Britain. Parliament. House of Commons. Energy and Climate Change Committee
Publisher: The Stationery Office
ISBN: 0215084039
Category : Business & Economics
Languages : en
Pages : 33
Book Description
The Climate Change Act 2008 committed the UK to reduce its greenhouse gas emissions by at least 80 percent by 2050. The 2010-2015 Parliament has been a defining period for energy and climate change policy. Three Energy Acts set the policy framework to help the UK achieve its goal. Each Act was designed to support new forms of energy generation, promote energy efficiency and protect consumers. These ambitious pieces of legislation have set the benchmark against which the progress towards providing a secure, clean and affordable energy supply will be judged. The Energy and Climate Change Committee plays a central role in scrutinising and improving the Government's policy and legislation. In section two of this report, the Committee provides a quantitative overview of the work it has undertaken in this Parliament. In section three, the Committee looks in more detail at three case studies - electricity market reform, competition in the energy market and shale gas - each of which highlights the key role the Committee has played in holding the Government to account and improving policy and legislation. Finally, in section four the Committee sets out our future vision for the UK energy system, based on the views and evidence provided by the wide range of stakeholders that it works with. The Committee also explores the challenges which will need to be overcome in the next Parliament if the UK is to achieve its ambitious long-term climate and energy goals.
Publisher: The Stationery Office
ISBN: 0215084039
Category : Business & Economics
Languages : en
Pages : 33
Book Description
The Climate Change Act 2008 committed the UK to reduce its greenhouse gas emissions by at least 80 percent by 2050. The 2010-2015 Parliament has been a defining period for energy and climate change policy. Three Energy Acts set the policy framework to help the UK achieve its goal. Each Act was designed to support new forms of energy generation, promote energy efficiency and protect consumers. These ambitious pieces of legislation have set the benchmark against which the progress towards providing a secure, clean and affordable energy supply will be judged. The Energy and Climate Change Committee plays a central role in scrutinising and improving the Government's policy and legislation. In section two of this report, the Committee provides a quantitative overview of the work it has undertaken in this Parliament. In section three, the Committee looks in more detail at three case studies - electricity market reform, competition in the energy market and shale gas - each of which highlights the key role the Committee has played in holding the Government to account and improving policy and legislation. Finally, in section four the Committee sets out our future vision for the UK energy system, based on the views and evidence provided by the wide range of stakeholders that it works with. The Committee also explores the challenges which will need to be overcome in the next Parliament if the UK is to achieve its ambitious long-term climate and energy goals.
HC 347 - Small Nuclear Power
Author: Great Britain. Parliament. House of Commons. Energy and Climate Change Committee
Publisher: The Stationery Office
ISBN: 0215080831
Category : Business & Economics
Languages : en
Pages : 40
Book Description
Small Modular Reactors are designed in a way that allows them to be manufactured at a plant and brought to site fully constructed. They have a range of useful applications, including industrial process heat, desalination or water purification, and other cogeneration applications. They could potentially have a key role to play in delivering low carbon energy at lower upfront capital cost compared to large conventional nuclear reactors but the commercial viability of SMRs remains unclear. Deployment of SMRs is likely to be achieved through sharing the costs between the public and private sector. The Committee would like to see the Government steering industry towards deploying a demonstrator SMR in the UK. Government should help to establish the right conditions for investment in SMRs, for example through supporting the regulator to bring forward approvals in the UK, and by setting out a clear view of siting options. Many of the barriers to deployment of SMRs in the UK are similar to the challenges of deploying larger conventional reactors. Small nuclear reactors will also generally raise similar questions of safety and security to those raised by large nuclear reactors. The Office for Nuclear Regulation also needs to be adequately resourced. In the longer term, Government should identify and help to establish future sources of commercial finance for the further development and industrialisation of SMRs. While current SMR designs have been predominantly developed outside the UK, there is scope for British industry to develop intellectual property and play a role in the deployment of the first SMRs
Publisher: The Stationery Office
ISBN: 0215080831
Category : Business & Economics
Languages : en
Pages : 40
Book Description
Small Modular Reactors are designed in a way that allows them to be manufactured at a plant and brought to site fully constructed. They have a range of useful applications, including industrial process heat, desalination or water purification, and other cogeneration applications. They could potentially have a key role to play in delivering low carbon energy at lower upfront capital cost compared to large conventional nuclear reactors but the commercial viability of SMRs remains unclear. Deployment of SMRs is likely to be achieved through sharing the costs between the public and private sector. The Committee would like to see the Government steering industry towards deploying a demonstrator SMR in the UK. Government should help to establish the right conditions for investment in SMRs, for example through supporting the regulator to bring forward approvals in the UK, and by setting out a clear view of siting options. Many of the barriers to deployment of SMRs in the UK are similar to the challenges of deploying larger conventional reactors. Small nuclear reactors will also generally raise similar questions of safety and security to those raised by large nuclear reactors. The Office for Nuclear Regulation also needs to be adequately resourced. In the longer term, Government should identify and help to establish future sources of commercial finance for the further development and industrialisation of SMRs. While current SMR designs have been predominantly developed outside the UK, there is scope for British industry to develop intellectual property and play a role in the deployment of the first SMRs
HC 665 - Smart Meters: Progress or Delay?
Author: Great Britain. Parliament. House of Commons. Energy and Climate Change Committee
Publisher: The Stationery Office
ISBN: 0215083857
Category : Business & Economics
Languages : en
Pages : 34
Book Description
Smart meters, which allow energy suppliers to get remote electricity and gas readings from households and businesses using mobile phone-type signals and wireless technologies, should benefit customers through savings from energy usage and efficiency. In 2013 we first looked at the Government's programme to roll-out smart meters to 100% of UK homes and businesses by 2020. This inquiry reviewed the progress of the roll-out and we have been disappointed by the ongoing policy delivery challenges which the Government has failed to resolve: (i) Technical communication problems with multiple occupancy and tall buildings which should have been resolved by now; (ii) Compatibility problems between different suppliers and different meters; (iii) A slow start to full engagement with the public on meter installation and long-term use; (iv) A delay by the Government-appointed communications infrastructure company which has further set back confidence in the programme; (iv) A reluctance to improve transparency by publishing the Major Project Authority's assessments on the smart meter programme.
Publisher: The Stationery Office
ISBN: 0215083857
Category : Business & Economics
Languages : en
Pages : 34
Book Description
Smart meters, which allow energy suppliers to get remote electricity and gas readings from households and businesses using mobile phone-type signals and wireless technologies, should benefit customers through savings from energy usage and efficiency. In 2013 we first looked at the Government's programme to roll-out smart meters to 100% of UK homes and businesses by 2020. This inquiry reviewed the progress of the roll-out and we have been disappointed by the ongoing policy delivery challenges which the Government has failed to resolve: (i) Technical communication problems with multiple occupancy and tall buildings which should have been resolved by now; (ii) Compatibility problems between different suppliers and different meters; (iii) A slow start to full engagement with the public on meter installation and long-term use; (iv) A delay by the Government-appointed communications infrastructure company which has further set back confidence in the programme; (iv) A reluctance to improve transparency by publishing the Major Project Authority's assessments on the smart meter programme.
HC 742 - Carbon Capture and Storage
Author: Great Britain: Parliament: House of Commons: Energy and Climate Change Committee
Publisher: The Stationery Office
ISBN: 0215072774
Category : Business & Economics
Languages : en
Pages : 72
Book Description
The Energy and Climate Change Committee urge the Government to fast-track final funding decisions on two pilot Carbon capture and storage (CCS) projects at Peterhead and Drax by early 2015, after years of delay in the 'competition' launched to provide capital support for the industry. This delay has called into question the credibility of Government policy designed to support CCS deployment in the UK. The technology - which can be fitted to coal and gas power stations - is vital to limit climate change because there is more CO2 locked up in fossil fuel reserves than can be safely burnt without pushing global temperatures beyond 2 degrees Celsius - a dangerous threshold according to scientists. The higher costs associated with fitting and running CCS means that it is likely to develop only in response to specific policy intervention and will need subsidy. The Government should be transparent about the costs of CCS and how they will be met. Guaranteed price tariffs for low carbon energy - called 'Contracts for Difference' (CfD) - will be essential to incentivise CCS projects and provide a route to market for non-competition projects. Deploying CCS in the UK early could also deliver significant economic benefits. It could increase UK plc's future share of the global CCS market and open up a potential 'storage market' using the UK's offshore geological storage capacity - thought to amount to 70 billion tonnes of CO2 or over a century of UK emissions - while protecting jobs associated with the UK's coal and energy intensive industries.
Publisher: The Stationery Office
ISBN: 0215072774
Category : Business & Economics
Languages : en
Pages : 72
Book Description
The Energy and Climate Change Committee urge the Government to fast-track final funding decisions on two pilot Carbon capture and storage (CCS) projects at Peterhead and Drax by early 2015, after years of delay in the 'competition' launched to provide capital support for the industry. This delay has called into question the credibility of Government policy designed to support CCS deployment in the UK. The technology - which can be fitted to coal and gas power stations - is vital to limit climate change because there is more CO2 locked up in fossil fuel reserves than can be safely burnt without pushing global temperatures beyond 2 degrees Celsius - a dangerous threshold according to scientists. The higher costs associated with fitting and running CCS means that it is likely to develop only in response to specific policy intervention and will need subsidy. The Government should be transparent about the costs of CCS and how they will be met. Guaranteed price tariffs for low carbon energy - called 'Contracts for Difference' (CfD) - will be essential to incentivise CCS projects and provide a route to market for non-competition projects. Deploying CCS in the UK early could also deliver significant economic benefits. It could increase UK plc's future share of the global CCS market and open up a potential 'storage market' using the UK's offshore geological storage capacity - thought to amount to 70 billion tonnes of CO2 or over a century of UK emissions - while protecting jobs associated with the UK's coal and energy intensive industries.
House of Commons - Transport Committee: Access to Ports - HC 266
Author: Great Britain: Parliament: House of Commons: Transport Committee
Publisher: The Stationery Office
ISBN: 9780215064646
Category : Business & Economics
Languages : en
Pages : 102
Book Description
In this report looking at policy for improving road and rail access to ports, the Transport Committee urges the Department for Transport (DfT) to become a keener advocate for UK ports. The Government should contribute to significant improvements to strategic networks which also deliver wider benefits - rather than simply expect port operators to pick up the entire bill for measures required to mitigate increased traffic due to port expansion. If the Government chooses to apply European Commission state aid rules in this area more strictly than other EU countries it should explain why it does so. Policy in this area should be applied consistently across the country. While some ports have contributed towards transport schemes to improve access, others have not and the differences in approach have not been explained or justified. Ports should also continue to contribute to local transport infrastructure improvements, following discussions with relevant local bodies. The Department for Transport should demonstrate whether port master plans have had any impact, highlighting good examples of such plans and of how they have influenced decision makers. Finally, the Government should devise a more effective successor to the Waterborne Freight Grant, to stimulate coastal shipping.
Publisher: The Stationery Office
ISBN: 9780215064646
Category : Business & Economics
Languages : en
Pages : 102
Book Description
In this report looking at policy for improving road and rail access to ports, the Transport Committee urges the Department for Transport (DfT) to become a keener advocate for UK ports. The Government should contribute to significant improvements to strategic networks which also deliver wider benefits - rather than simply expect port operators to pick up the entire bill for measures required to mitigate increased traffic due to port expansion. If the Government chooses to apply European Commission state aid rules in this area more strictly than other EU countries it should explain why it does so. Policy in this area should be applied consistently across the country. While some ports have contributed towards transport schemes to improve access, others have not and the differences in approach have not been explained or justified. Ports should also continue to contribute to local transport infrastructure improvements, following discussions with relevant local bodies. The Department for Transport should demonstrate whether port master plans have had any impact, highlighting good examples of such plans and of how they have influenced decision makers. Finally, the Government should devise a more effective successor to the Waterborne Freight Grant, to stimulate coastal shipping.
UK deepwater drilling - implications of the Gulf of Mexico oil spill
Author: Great Britain: Parliament: House of Commons: Energy and Climate Change Committee
Publisher: The Stationery Office
ISBN: 9780215555793
Category : Business & Economics
Languages : en
Pages : 198
Book Description
On 20 April 2010, a blowout of BP's Macondo well in the Gulf of Mexico led to the deaths of 11 workers on Transocean's Deepwater Horizon drilling rig, and the release of an estimated 4.9 million barrels of oil. The European Commission called for a moratorium but the UK government decided its regulatory controls were fit for purpose. However a full review of the oil and gas environmental regulatory regime would be undertaken. The Committee believes that the UK has high regulatory standards - as exemplified by the Safety Case regime that was set up in response to the 1988 Piper Alpha tragedy in 1988. The blowout in the Gulf of Mexico could have been prevented if the last-line of defence - the blind shear ram on the blowout preventer had activated and crushed the drill pipe. Given the importance of this equipment the committee recommends prescribing specifically that blowout preventers should have two blind shear rams and that simple, potential failures mustn't be left unchecked. The Committee also recommends that the Bly report conclusions, BP's internal investigation, be considered alongside observations of other companies involved. They believe that should an oil spill resulting from drilling activities occur in the UK there needs to be an absolute clarity as to the identity of the responsible party, and that liability legislation needs to ensure prompt compensation. They conclude that any calls for increased oversight of the UK offshore industry should be rejected in favour of multilateral approaches to regulation and oil spill response
Publisher: The Stationery Office
ISBN: 9780215555793
Category : Business & Economics
Languages : en
Pages : 198
Book Description
On 20 April 2010, a blowout of BP's Macondo well in the Gulf of Mexico led to the deaths of 11 workers on Transocean's Deepwater Horizon drilling rig, and the release of an estimated 4.9 million barrels of oil. The European Commission called for a moratorium but the UK government decided its regulatory controls were fit for purpose. However a full review of the oil and gas environmental regulatory regime would be undertaken. The Committee believes that the UK has high regulatory standards - as exemplified by the Safety Case regime that was set up in response to the 1988 Piper Alpha tragedy in 1988. The blowout in the Gulf of Mexico could have been prevented if the last-line of defence - the blind shear ram on the blowout preventer had activated and crushed the drill pipe. Given the importance of this equipment the committee recommends prescribing specifically that blowout preventers should have two blind shear rams and that simple, potential failures mustn't be left unchecked. The Committee also recommends that the Bly report conclusions, BP's internal investigation, be considered alongside observations of other companies involved. They believe that should an oil spill resulting from drilling activities occur in the UK there needs to be an absolute clarity as to the identity of the responsible party, and that liability legislation needs to ensure prompt compensation. They conclude that any calls for increased oversight of the UK offshore industry should be rejected in favour of multilateral approaches to regulation and oil spill response