Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch

Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch PDF Author: Bruce A. Williams
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description

Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch

Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch PDF Author: Bruce A. Williams
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch, Interim Change Notice 1

Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch, Interim Change Notice 1 PDF Author: Bruce A. Williams
Publisher:
ISBN:
Category :
Languages : en
Pages : 5

Get Book Here

Book Description
During 2003, the upgradient well 299-W26-7 went dry and one new groundwater monitoring well was installed downgradient (well 299-W26-14) of the 216-S-10 pond and ditch. This ICN updates the groundwater monitoring wells for the 216-S-10 pond and ditch and adds a revised well location map to the plan.

Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch, Interim Change Notice 2

Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch, Interim Change Notice 2 PDF Author: Bruce A. Williams
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
This ICN updates the groundwater monitoring plan. The list of constituents and the frequency of sampling is updated to reflect current needs and updates the list of wells within the network.

Post-Closure RCRA Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch

Post-Closure RCRA Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch PDF Author: D. BRENT. Barnett
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
The purpose of this plan is to provide a post-closure groundwater monitoring program for the 216-S-10 Pond and Ditch (S-10) treatment, storage, and/or disposal (TSD) unit. The plan incorporates the sum of knowledge about the potential for groundwater contamination to originate from the S-10, including groundwater monitoring results, hydrogeology, and operational history. The S-10 has not received liquid waste since October 1991. The closure of S-10 has been coordinated with the 200-CS-1 source operable unit in accordance with the Tri-Party Agreement interim milestones M-20-39 and M-15-39C. The S-10 is closely situated among other waste sites of very similar operational histories. The proximity of the S-10 to the other facilities (216-S-17 pond, 216-S-11 Pond, 216-S-5,6 cribs, 216-S-16 ditch and pond, and 216-U-9 ditch) indicate that at least some observed groundwater contamination beneath and downgradient of S-10 could have originated from waste sites other than S-10. Hence, it may not be feasible to strictly discriminate between the contributions of each waste site to groundwater contamination beneath the S-10. A post-closure groundwater monitoring network is proposed that will include the drilling of three new wells to replace wells that have gone dry. When completed, the revised network will meet the intent for groundwater monitoring network under WAC 173-303-645, and enable an improved understanding of groundwater contamination at the S-10. Site-specific sampling constituents are based on the dangerous waste constituents of concern relating to RCRA TSD unit operations (TSD unit constituents) identified in the Part A Permit Application. Thus, a constituent is selected for monitoring if it is: A dangerous waste constituent identified in the Part A Permit Application, or A mobile decomposition product (i.e., nitrate from nitrite) of a Part A constituent, or A reliable indicator of the site-specific contaminants (i.e., specific conductance). Using these criteria, the following constituent list and sampling schedule is proposed: Constituent; Sampling Frequency Site-Specific Parameters; Hexavalent chromium (a); Semiannual Chloride; Semiannual Fluoride; Semiannual Nitrate; Semiannual Nitrite; Semiannual Specific conductance (field)(a); Semiannual Ancillary Parameters; Anions; Annual Alkalinity Annual Metals, (in addition to chromium); Annual pH (field) Semiannual Temperature (field); Semiannual Turbidity (field) Semiannual (a). These constituents will be subject to statistical tests after background is established. It will be necessary to install new monitoring wells and accumulate background data on the groundwater from those wells before statistical comparisons can be made. Until then, the constituents listed above will be evaluated by tracking and trending concentrations in all wells and comparing these results with the corresponding DWS or Hanford Site background concentration for each constituent. If a comparison value (background or DWS) for a constituent is exceeded, DOE will notify Ecology per WAC 173-303-645 (9) (g) requirements (within seven days or a time agreed to between DOE and Ecology).

Groundwater Monitoring Plan for the 216-A-29 Ditch

Groundwater Monitoring Plan for the 216-A-29 Ditch PDF Author: Mark D. Sweeney
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


The Office of Environmental Management Technical Reports

The Office of Environmental Management Technical Reports PDF Author:
Publisher:
ISBN:
Category : Environmental management
Languages : en
Pages : 972

Get Book Here

Book Description


Borehole Data Package for the 216-S-10 Pond and Ditch Well 299-W26-13

Borehole Data Package for the 216-S-10 Pond and Ditch Well 299-W26-13 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 68

Get Book Here

Book Description
One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at the 216-S-10 pond and ditch during November and December 1999 in fulfillment of Tri-Party Agreement (Ecology 1996) milestone M-24-42. The well is 299-W26-13 and is located at the northeast corner to the 216-S-10 pond, southwest of 200 West Area. The well is a new downgradient well in the monitoring network. Figure 1 shows the locations of all wells in the 216-S-10 pond and ditch monitoring network. The new well was constructed to the specifications and requirements described in Washington Administrative Code (WAC) 173-160 and WAC 173-303, the groundwater monitoring plan for the 216-S-10 pond and ditch (Airhart et al. 1990), and the description of work for well drilling and installation. During drilling and construction of well 299-W26-13, sampling and analysis activities were done to support remedial action, closure decisions at treatment, storage and disposal facilities, and to confirm preliminary site conceptual models developed in the 200-CS-1 Work Plan (DOE/RL 1999). This document compiles information on the drilling and construction, well development, pump installation, and sediment and groundwater testing applicable to well 299-W26-13. Appendix A contains the Well Summary Sheet (as-built diagram), the Well Construction Summary Report, and the geologist's log. Appendix B contains results of field and laboratory determinations of physical and chemical properties of sediment samples. Appendix C contains borehole geophysical logs. Additional documentation concerning well construction is on file with Bechtel Hanford, Inc., Richland, Washington. English units are used in this report to describe drilling and well completion activities because that is the system of units used by drillers to measure and report depths and well construction details. Conversion to metric is made by multiplying feet by 0.3048 to obtain meters or multiplying inches by 2.54 to obtain centimeters.

Federal Facility Compliance with Hazardous Waste Laws

Federal Facility Compliance with Hazardous Waste Laws PDF Author: United States. Congress. Senate. Committee on Environment and Public Works. Subcommittee on Superfund and Environmental Oversight
Publisher:
ISBN:
Category : Environmental law
Languages : en
Pages : 268

Get Book Here

Book Description


Radioactive Waste Management

Radioactive Waste Management PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 430

Get Book Here

Book Description


Groundwater Monitoring Plan for the Hanford Site 216-B-3 Pond RCRA Facility

Groundwater Monitoring Plan for the Hanford Site 216-B-3 Pond RCRA Facility PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
The 216-B-3 Pond was a series of ponds for disposal of liquid effluent from past Hanford production facilities. In 1990, groundwater monitoring at B Pond was elevated from "detection" to assessment status because total organic halides and total organic carbon were found to exceed critical means in two wells. Groundwater quality assessment, which ended in 1996, failed to find any specific hazardous waste contaminant that could have accounted for the isolated occurrences of elevated total organic halides and total organic carbon. Hence, the facility was subsequently returned to detection-level monitoring in 1998. Exhaustive groundwater analyses during the assessment period indicated that only two contaminants, tritium and nitrate, could be positively attributed to the B Pond System, with two others (arsenic and I-129) possibly originating from B Pond. Chemical and radiological analyses of soil at the main pond and 216-B-3-3 ditch has not revealed significant contamination. Based on the observed, minor contamination in groundwater and in the soil column, three parameters were selected for site-specific, semiannual monitoring; gross alpha, gross beta, and specific conductance. Total organic halides and total organic carbon are included as constituents because of regulatory requirements. Nitrate, tritium, arsenic, and iodine-129 will be monitored under the aegis of Hanford site-wide monitoring. Although the B Pond System is not scheduled to advance from RCRA interim status to final status until the year 2003, a contingency plan for an improved monitoring strategy, which will partially emulate final status requirements, will be contemplated before the official change to final status. This modification will allow a more sensible and effective screening of groundwater for the facility.