Grays Harbor Navigation Improvement Project, Chehalis and Hoquiam Rivers PDF Download
Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Grays Harbor Navigation Improvement Project, Chehalis and Hoquiam Rivers PDF full book. Access full book title Grays Harbor Navigation Improvement Project, Chehalis and Hoquiam Rivers by . Download full books in PDF and EPUB format.
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 546
Get Book Here
Book Description
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 546
Get Book Here
Book Description
Author: United States. Army. Corps of Engineers. Seattle District
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 336
Get Book Here
Book Description
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 876
Get Book Here
Book Description
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 218
Get Book Here
Book Description
Author: United States. Army. Corps of Engineers. Seattle District
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages :
Get Book Here
Book Description
Author: United States. Army. Corps of Engineers. Seattle District
Publisher:
ISBN:
Category :
Languages : en
Pages :
Get Book Here
Book Description
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 436
Get Book Here
Book Description
Author: CORPS OF ENGINEERS SEATTLE WA SEATTLE DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 520
Get Book Here
Book Description
The study determined the need for and feasibility of improving the safety and efficiency of deep-draft water in Grays Harbor, Washington. Features of the tentatively recommended plan include the following: (1) 24.3 miles of channel improvement form the outer bar through the harbor entrance and estuary past the city of Aberdeen and up the Chehalis River to the town of Cosmopolis (Authorized chanel depth would range from 46 feet at the outer bar and entrance to 38 feet through the estuary to Port of Grays Harbor terminals at Aberdeen and 36 feet above port terminals to Cosmopolis); (2) Replacement of the Union Pacific Railrod (UPRR) bridge at Aberdeen; (3) Construction of three turning basins (Hoquiam, Cow Point-Aberdeen, Elliott Slough above UPRR Bridge); (4) Mitigation of 4 acres of lost shallow water fish feeding habitat; (5) Mitigation through dredge modification to avoid increased juvenile and adult crab mortalities from dredging; (6) Improved aids to navigation; (7) Open-water disposal of dredged material at the harbor entrance (Point Chehalis and South Jetty sites) and in the ocean (about 3 1/2 miles from the harbor entrance).
Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category : Breakwaters
Languages : en
Pages : 42
Get Book Here
Book Description
Author: United States. Army. Corps of Engineers. Seattle District
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages :
Get Book Here
Book Description