Author: CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 672
Book Description
This report recommends that a small-boat harbor and harbor-of-refuge and recreational fishing facilities be constructed as an integral part of the State Park at Geneva-on-the-Lake, OH, and that the selected plan of improvement, known as Alternative Plan 3b, (Modified Wetland/Parking Lot Harbor) be used as a basis for the Phase II General Design Memorandum. The total first cost of the project, on August 1981 price levels, is a $5,816,000 consisting of: $2,870,000 Corps of Engineers; $76,000 U.S. Coast Guard; and $2,870,000 non-Federal. These recommendations are made with the understanding that non-Federal interests must furnish assurances satisfactory to the Secretary of the Army with regard to 15 listed provisos.
Geneva-on-the-Lake, Ohio. Small-Boat Harbor. Final Reformulation. Phase I. General Design Memorandum and Final Environmental Impact Statement
Author: CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 672
Book Description
This report recommends that a small-boat harbor and harbor-of-refuge and recreational fishing facilities be constructed as an integral part of the State Park at Geneva-on-the-Lake, OH, and that the selected plan of improvement, known as Alternative Plan 3b, (Modified Wetland/Parking Lot Harbor) be used as a basis for the Phase II General Design Memorandum. The total first cost of the project, on August 1981 price levels, is a $5,816,000 consisting of: $2,870,000 Corps of Engineers; $76,000 U.S. Coast Guard; and $2,870,000 non-Federal. These recommendations are made with the understanding that non-Federal interests must furnish assurances satisfactory to the Secretary of the Army with regard to 15 listed provisos.
Publisher:
ISBN:
Category :
Languages : en
Pages : 672
Book Description
This report recommends that a small-boat harbor and harbor-of-refuge and recreational fishing facilities be constructed as an integral part of the State Park at Geneva-on-the-Lake, OH, and that the selected plan of improvement, known as Alternative Plan 3b, (Modified Wetland/Parking Lot Harbor) be used as a basis for the Phase II General Design Memorandum. The total first cost of the project, on August 1981 price levels, is a $5,816,000 consisting of: $2,870,000 Corps of Engineers; $76,000 U.S. Coast Guard; and $2,870,000 non-Federal. These recommendations are made with the understanding that non-Federal interests must furnish assurances satisfactory to the Secretary of the Army with regard to 15 listed provisos.
Draft Reformulation. Phase I. General Design Memorandum and Draft Environmental Impact Statement: Geneva-on-the-Lake, Ohio Small Boat Harbor. Revision
Author: CORPS OF ENGINEERS BUFFALO N Y BUFFALO DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 611
Book Description
Geneva-on-the Lake is located on the south shore of Lake Erie about 17 miles east of Fairport Harbor, OH., and 12 miles west of Ashtabula Harbor, OH., both of which are federally approved deep-draft harbors. Geneva-on-the-Lake was identified as a promising location for a small boat harbor and harbor of refuge because of its strategic location within the boundaries of a state recreational park which is presently still being developed by the state of Ohio. Its proximity to productive fishing grounds and the appreciable boating demands are additional reasons. (Author).
Publisher:
ISBN:
Category :
Languages : en
Pages : 611
Book Description
Geneva-on-the Lake is located on the south shore of Lake Erie about 17 miles east of Fairport Harbor, OH., and 12 miles west of Ashtabula Harbor, OH., both of which are federally approved deep-draft harbors. Geneva-on-the-Lake was identified as a promising location for a small boat harbor and harbor of refuge because of its strategic location within the boundaries of a state recreational park which is presently still being developed by the state of Ohio. Its proximity to productive fishing grounds and the appreciable boating demands are additional reasons. (Author).
Geneva-on-the-Lake Ohio. Small Boat Harbor. Stage 2 Document for Reformulation Phase I General Design Memorandum. Revision
Author: Richard Aguglia
Publisher:
ISBN:
Category :
Languages : en
Pages : 451
Book Description
The purpose of this Reformulation Phase 1 GDM is to reaffirm the viability of the 1969 plan in light of the changes that have occurred at the site since the project was authorized for construction, to develop a modified plan, or to recommend an entirely different plan (including 'no action'), if a different plan more nearly satisfies the criteria of engineering, environmental, economic, social, financial, and political feasibility. Reformulation is necessary because of the probable adverse environmental impact to the existing wetland area in the location where the authorized project was to be constructed. Methods to minimize the environmental impacts will be investigated and will include relocating the habor to avoid or reduce the amount of wetland disturbed, enhancement of the existing wetland area not affected by the harbor and creation of additional wetlands. If a viable plan is developed for the Geneva-on-the-Lake Small Boat Harbor project, an Environmental Impact Statement that addresses the existing physical condition at Geneva State Park and conforms with current policy and legislation, will be prepared. The environmental Impact Statement will, among other things, assess the impacts of the recommended plan on the existing wetland area.
Publisher:
ISBN:
Category :
Languages : en
Pages : 451
Book Description
The purpose of this Reformulation Phase 1 GDM is to reaffirm the viability of the 1969 plan in light of the changes that have occurred at the site since the project was authorized for construction, to develop a modified plan, or to recommend an entirely different plan (including 'no action'), if a different plan more nearly satisfies the criteria of engineering, environmental, economic, social, financial, and political feasibility. Reformulation is necessary because of the probable adverse environmental impact to the existing wetland area in the location where the authorized project was to be constructed. Methods to minimize the environmental impacts will be investigated and will include relocating the habor to avoid or reduce the amount of wetland disturbed, enhancement of the existing wetland area not affected by the harbor and creation of additional wetlands. If a viable plan is developed for the Geneva-on-the-Lake Small Boat Harbor project, an Environmental Impact Statement that addresses the existing physical condition at Geneva State Park and conforms with current policy and legislation, will be prepared. The environmental Impact Statement will, among other things, assess the impacts of the recommended plan on the existing wetland area.
Draft Reformulation Phase I
Author:
Publisher:
ISBN:
Category : Harbors
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Harbors
Languages : en
Pages :
Book Description
Geneva-on-the-Lake Small Boat Harbor
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 146
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 146
Book Description
Plan of Study for Reformulation Phase I General Design Memorandum, Geneva-on-the-Lake, Ohio Small Boat Harbor
Author: United States. Army. Corps of Engineers. Buffalo District
Publisher:
ISBN:
Category : Harbors
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Harbors
Languages : en
Pages :
Book Description
Stage 2 Document for Reformulation Phase I
Author:
Publisher:
ISBN:
Category : Harbors
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Harbors
Languages : en
Pages :
Book Description
Final Reformulation Phase I General Design Memorandum, Cleveland Harbor, Ohio
Author: United States. Army. Corps of Engineers. Buffalo District
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 145
Book Description
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 145
Book Description
Geneva-on-the-Lake, Ohio, Small Boat Harbor
Author: United States. Army. Corps of Engineers. Buffalo District
Publisher:
ISBN:
Category : Harbors
Languages : en
Pages : 118
Book Description
Publisher:
ISBN:
Category : Harbors
Languages : en
Pages : 118
Book Description
Technical Abstract Bulletin
Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 212
Book Description
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 212
Book Description