Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 696
Book Description
Blanchard River Flood Protection Project at Ottawa, General Reevaluation Report
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 696
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 696
Book Description
General Reevaluation Report and Environmental Impact Statement for the Blanchard River, Ottawa, Ohio Flood Protection Project
Author: CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 391
Book Description
Several measures and plans were considered and investigated during the reevaluation study to select a plan with the greatest NED benefit. Most plans were dropped from further consideration in the process because they lacked economic justification and did not warrant further investigation. The emphasis in this stage of planning is limited to an iteration of 11 structural alternatives. 7 non-structural alternatives, and selection of a recommended plan. Principal considerations in this effort were: the views of local interests, residents of the projects area and the local sponsors; development and presentation of additional and/or refined economic, environmental and engineering data; and preparation of the Environmental Impact Statement. The impacts of viable alternatives were then examined in comparative form to justify the Selected Plan. Plan E, the NED plan, is a combination of structural Plan B and nonstructural Plan C, having net benefits of 19,400 and a B/C ratio of 1.18 to 1. This plan could be implemented at total first cost of 1,387,900 January 1986 price levels and the cost includes all lands easements, and right-of-way at January 1986 price levels. (FR).
Publisher:
ISBN:
Category :
Languages : en
Pages : 391
Book Description
Several measures and plans were considered and investigated during the reevaluation study to select a plan with the greatest NED benefit. Most plans were dropped from further consideration in the process because they lacked economic justification and did not warrant further investigation. The emphasis in this stage of planning is limited to an iteration of 11 structural alternatives. 7 non-structural alternatives, and selection of a recommended plan. Principal considerations in this effort were: the views of local interests, residents of the projects area and the local sponsors; development and presentation of additional and/or refined economic, environmental and engineering data; and preparation of the Environmental Impact Statement. The impacts of viable alternatives were then examined in comparative form to justify the Selected Plan. Plan E, the NED plan, is a combination of structural Plan B and nonstructural Plan C, having net benefits of 19,400 and a B/C ratio of 1.18 to 1. This plan could be implemented at total first cost of 1,387,900 January 1986 price levels and the cost includes all lands easements, and right-of-way at January 1986 price levels. (FR).
Final Environmental Impact Statement, Flood Protection Project, Blanchard River, Village of Ottawa, Putnam County, OH
Author: United States. Army. Corps of Engineers. Buffalo District
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 80
Book Description
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 80
Book Description
Buena Vista Flood Protection Project
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 152
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 152
Book Description
Final Environmental Impact Statement
Author:
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 146
Book Description
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 146
Book Description
Sheyenne River, North Dakota, General Reevaluation and Environmental Impact Statement for Flood Control and Related Purposes
Author: United States. Army. Corps of Engineers. St. Paul District
Publisher:
ISBN:
Category : Sheyenne River Project
Languages : en
Pages : 230
Book Description
Publisher:
ISBN:
Category : Sheyenne River Project
Languages : en
Pages : 230
Book Description
Final Environmental Impact Statement/environmental Impact Report, Petaluma River Flood Control Improvements Section 205
Author:
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 194
Book Description
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 194
Book Description
Loup River Flood Control Project, Columbus
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 24
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 24
Book Description
Feasibility Report and Environmental Impact Statement
Author: United States. Office of the Assistant Secretary of the Army (Civil Works)
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 1104
Book Description
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 1104
Book Description
Revised Draft Environmental Impact Statement, Flood Control and Related Purposes, South Fork Zumbro River Watershed
Author: United States. Army. Corps of Engineers. St. Paul District
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 160
Book Description
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 160
Book Description