Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 546
Book Description
Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 546
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 546
Book Description
Continued Operation of Los Alamos National Laboratory
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 644
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 644
Book Description
Proposed Consolidation of Nuclear Operations Related to Production of Radioisotope Power Systems
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 542
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 542
Book Description
Programmatic EIS for Stockpile Stewardship and Management
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 1308
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 1308
Book Description
Federal Register
Author:
Publisher:
ISBN:
Category : Administrative law
Languages : en
Pages : 356
Book Description
Publisher:
ISBN:
Category : Administrative law
Languages : en
Pages : 356
Book Description
The Reliable Replacement Warhead Program: Background and Current Developments
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 50
Book Description
Most current U.S. nuclear warheads were built in the 1970s and 1980s and are being retained longer than was planned. Yet they deteriorate and must be maintained. To correct problems, a Life Extension Program (LEP), part of a larger Stockpile Stewardship Program (SSP), replaces components. Modifying some components would require a nuclear test, but the United States has observed a test moratorium since 1992. Congress and the Administration prefer to avoid a return to testing, so LEP rebuilds these components as closely as possible to original specifications. With this approach, the Secretaries of Defense and Energy have certified stockpile safety and reliability for the past 12 years without nuclear testing. NNSA argues it will become harder to certify current warheads with LEP because small changes may undermine confidence in warheads, perhaps leading to nuclear testing, whereas new-design replacement warheads created by the RRW program will be easier to certify without testing. Critics believe LEP and SSP can maintain the stockpile indefinitely. They worry that untested RRWs may make testing more likely and question cost savings, given high investment cost. They note that there are no military requirements for new weapons. Others feel that neither LEP nor RRW can provide high confidence over the long term, and would resume testing. Another point of view is that either LEP or RRW will work without nuclear testing. This report provides background and tracks legislation. It will be updated to reflect final FY2010 congressional action on RRW. See also CRS Report RL33748, Nuclear Warheads: The Reliable Replacement Warhead Program and the Life Extension Program, by Jonathan Medalia, which compares these two programs in detail.
Publisher:
ISBN:
Category :
Languages : en
Pages : 50
Book Description
Most current U.S. nuclear warheads were built in the 1970s and 1980s and are being retained longer than was planned. Yet they deteriorate and must be maintained. To correct problems, a Life Extension Program (LEP), part of a larger Stockpile Stewardship Program (SSP), replaces components. Modifying some components would require a nuclear test, but the United States has observed a test moratorium since 1992. Congress and the Administration prefer to avoid a return to testing, so LEP rebuilds these components as closely as possible to original specifications. With this approach, the Secretaries of Defense and Energy have certified stockpile safety and reliability for the past 12 years without nuclear testing. NNSA argues it will become harder to certify current warheads with LEP because small changes may undermine confidence in warheads, perhaps leading to nuclear testing, whereas new-design replacement warheads created by the RRW program will be easier to certify without testing. Critics believe LEP and SSP can maintain the stockpile indefinitely. They worry that untested RRWs may make testing more likely and question cost savings, given high investment cost. They note that there are no military requirements for new weapons. Others feel that neither LEP nor RRW can provide high confidence over the long term, and would resume testing. Another point of view is that either LEP or RRW will work without nuclear testing. This report provides background and tracks legislation. It will be updated to reflect final FY2010 congressional action on RRW. See also CRS Report RL33748, Nuclear Warheads: The Reliable Replacement Warhead Program and the Life Extension Program, by Jonathan Medalia, which compares these two programs in detail.
Linking Legacies
Author:
Publisher:
ISBN:
Category : Cleanup of radioactive waste sites
Languages : en
Pages : 250
Book Description
Publisher:
ISBN:
Category : Cleanup of radioactive waste sites
Languages : en
Pages : 250
Book Description
Water, Watersheds, and Land Use in New Mexico
Author: Peggy Sue Johnson
Publisher:
ISBN:
Category : Business & Economics
Languages : en
Pages : 164
Book Description
Publisher:
ISBN:
Category : Business & Economics
Languages : en
Pages : 164
Book Description
Critical Mineral Resources of the United States
Author: K. J. Schulz
Publisher: Geological Survey
ISBN: 9781411339910
Category : Business & Economics
Languages : en
Pages : 868
Book Description
As the importance and dependence of specific mineral commodities increase, so does concern about their supply. The United States is currently 100 percent reliant on foreign sources for 20 mineral commodities and imports the majority of its supply of more than 50 mineral commodities. Mineral commodities that have important uses and face potential supply disruption are critical to American economic and national security. However, a mineral commodity's importance and the nature of its supply chain can change with time; a mineral commodity that may not have been considered critical 25 years ago may be critical today, and one considered critical today may not be so in the future. The U.S. Geological Survey has produced this volume to describe a select group of mineral commodities currently critical to our economy and security. For each mineral commodity covered, the authors provide a comprehensive look at (1) the commodity's use; (2) the geology and global distribution of the mineral deposit types that account for the present and possible future supply of the commodity; (3) the current status of production, reserves, and resources in the United States and globally; and (4) environmental considerations related to the commodity's production from different types of mineral deposits. The volume describes U.S. critical mineral resources in a global context, for no country can be self-sufficient for all its mineral commodity needs, and the United States will always rely on global mineral commodity supply chains. This volume provides the scientific understanding of critical mineral resources required for informed decisionmaking by those responsible for ensuring that the United States has a secure and sustainable supply of mineral commodities.
Publisher: Geological Survey
ISBN: 9781411339910
Category : Business & Economics
Languages : en
Pages : 868
Book Description
As the importance and dependence of specific mineral commodities increase, so does concern about their supply. The United States is currently 100 percent reliant on foreign sources for 20 mineral commodities and imports the majority of its supply of more than 50 mineral commodities. Mineral commodities that have important uses and face potential supply disruption are critical to American economic and national security. However, a mineral commodity's importance and the nature of its supply chain can change with time; a mineral commodity that may not have been considered critical 25 years ago may be critical today, and one considered critical today may not be so in the future. The U.S. Geological Survey has produced this volume to describe a select group of mineral commodities currently critical to our economy and security. For each mineral commodity covered, the authors provide a comprehensive look at (1) the commodity's use; (2) the geology and global distribution of the mineral deposit types that account for the present and possible future supply of the commodity; (3) the current status of production, reserves, and resources in the United States and globally; and (4) environmental considerations related to the commodity's production from different types of mineral deposits. The volume describes U.S. critical mineral resources in a global context, for no country can be self-sufficient for all its mineral commodity needs, and the United States will always rely on global mineral commodity supply chains. This volume provides the scientific understanding of critical mineral resources required for informed decisionmaking by those responsible for ensuring that the United States has a secure and sustainable supply of mineral commodities.
Review of the Department of Energy's Plans for Disposal of Surplus Plutonium in the Waste Isolation Pilot Plant
Author: National Academies of Sciences, Engineering, and Medicine
Publisher: National Academies Press
ISBN: 0309498619
Category : Political Science
Languages : en
Pages : 225
Book Description
In 2018, the National Academies of Sciences, Engineering, and Medicine issued an Interim Report evaluating the general viability of the U.S. Department of Energy's National Nuclear Security Administration's (DOE-NNSA's) conceptual plans for disposing of 34 metric tons (MT) of surplus plutonium in the Waste Isolation Pilot Plant (WIPP), a deep geologic repository near Carlsbad, New Mexico. It provided a preliminary assessment of the general viability of DOE-NNSA's conceptual plans, focused on some of the barriers to their implementation. This final report addresses the remaining issues and echoes the recommendations from the interim study.
Publisher: National Academies Press
ISBN: 0309498619
Category : Political Science
Languages : en
Pages : 225
Book Description
In 2018, the National Academies of Sciences, Engineering, and Medicine issued an Interim Report evaluating the general viability of the U.S. Department of Energy's National Nuclear Security Administration's (DOE-NNSA's) conceptual plans for disposing of 34 metric tons (MT) of surplus plutonium in the Waste Isolation Pilot Plant (WIPP), a deep geologic repository near Carlsbad, New Mexico. It provided a preliminary assessment of the general viability of DOE-NNSA's conceptual plans, focused on some of the barriers to their implementation. This final report addresses the remaining issues and echoes the recommendations from the interim study.