Author: United States. Army. Corps of Engineers. Buffalo District
Publisher:
ISBN:
Category : Erosion
Languages : en
Pages : 71
Book Description
Final Environmental Impact Statement for Proposed Plan for Shoreline Protection and Beach Restoration at Maumee Bay State Park, Lucas County, Ohio
Author: United States. Army. Corps of Engineers. Buffalo District
Publisher:
ISBN:
Category : Erosion
Languages : en
Pages : 71
Book Description
Publisher:
ISBN:
Category : Erosion
Languages : en
Pages : 71
Book Description
Maumee Bay State Park Shoreline Erosion Beach Restoration Study
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 278
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 278
Book Description
Maumee Bay State Park Shoreline Erosion Beach Restoration Study
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 236
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 236
Book Description
Maumee Bay State Park, Ohio. Shoreline Erosion Beach Restoration Study. Final Feasibility Report and Final Environmental Impact Statement. Interim to Western Lake Erie Shore Study. Volume 1. Main Report. Revised
Author: CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 193
Book Description
The Ohio Department of Natural Resources (ODNR) is developing a multiuse facility on the shore of Lake Erie near Toledo, OH, called Maumee Bay State Park. They have requested Corps assistance in designing and cost-sharing structures to halt the severe shoreline erosion which is occuring, so that the park can be developed to its full potential. A plan for accomplishing the stated purpose has been developed. It would provide a protective sand beach, 250 feet wide by 5,500 feet long over the western half of the park, stabilized by eight 300-foot offshore rubblemound breakwaters. The eastern half of the park would be protected by a rubblemound revetment placed along existing shoreline, while the drainage ditches would be protected by rubblemound jetties. The plan recommended for construction is environmentally acceptable, engineeringly and economically feasible, and has an estimated first cost of $11.8 million. In addition, ODNR plans an expenditure of $3.3 million for associate development which will include a bathhouse, parking, and lands. Average annual benefits for the Federal Project and associated ODNR development are $5.7 million. With total annual charges of $1.7 million, the benefit-to-cost ration is 3.41 to 1.0. ODNR is fully supportive of the Corps shoreline protection plan. There is no known opposition to this plan or to the planned park development of the State.
Publisher:
ISBN:
Category :
Languages : en
Pages : 193
Book Description
The Ohio Department of Natural Resources (ODNR) is developing a multiuse facility on the shore of Lake Erie near Toledo, OH, called Maumee Bay State Park. They have requested Corps assistance in designing and cost-sharing structures to halt the severe shoreline erosion which is occuring, so that the park can be developed to its full potential. A plan for accomplishing the stated purpose has been developed. It would provide a protective sand beach, 250 feet wide by 5,500 feet long over the western half of the park, stabilized by eight 300-foot offshore rubblemound breakwaters. The eastern half of the park would be protected by a rubblemound revetment placed along existing shoreline, while the drainage ditches would be protected by rubblemound jetties. The plan recommended for construction is environmentally acceptable, engineeringly and economically feasible, and has an estimated first cost of $11.8 million. In addition, ODNR plans an expenditure of $3.3 million for associate development which will include a bathhouse, parking, and lands. Average annual benefits for the Federal Project and associated ODNR development are $5.7 million. With total annual charges of $1.7 million, the benefit-to-cost ration is 3.41 to 1.0. ODNR is fully supportive of the Corps shoreline protection plan. There is no known opposition to this plan or to the planned park development of the State.
EIS Cumulative
Author:
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages : 310
Book Description
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages : 310
Book Description
State of Ohio, Coastal Management Program
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 616
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 616
Book Description
Toledo Harbor Confined Disposal Area
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 166
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 166
Book Description
Environment Reporter
Author:
Publisher:
ISBN:
Category : Environmental law
Languages : en
Pages : 1236
Book Description
Current developments: a weekly review of pollution control and related environmental management problems -- Decisions (later published in bound volumes. Environment reporter. Cases) --Monographs -- Federal laws -- Federal regulations --State air laws -- State water laws -- State solid waste, land use laws -- Mining.
Publisher:
ISBN:
Category : Environmental law
Languages : en
Pages : 1236
Book Description
Current developments: a weekly review of pollution control and related environmental management problems -- Decisions (later published in bound volumes. Environment reporter. Cases) --Monographs -- Federal laws -- Federal regulations --State air laws -- State water laws -- State solid waste, land use laws -- Mining.
Maumee Bay State Park, Ohio Shoreline Erosion - Beach Restoration Study
Author: United States. Army. Corps of Engineers. Buffalo District
Publisher:
ISBN:
Category : Coastal engineering
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Coastal engineering
Languages : en
Pages :
Book Description
Federal Register
Author:
Publisher:
ISBN:
Category : Administrative law
Languages : en
Pages : 1032
Book Description
Publisher:
ISBN:
Category : Administrative law
Languages : en
Pages : 1032
Book Description