Discover How to Make Your Project Control Even More Effective and Bring More Transparency and Security to Your Projects This book covers the basic concepts of EARNED VALUE MANAGEMENT in an easy understandable way. You will find on more than 200 pages comprehensive knowledge about Earned Value Management, simply explained with more than 50 illustrations – and aligned with the PMBOK® Guide 6th Edition 2018. Project control and reporting of costs, schedules, technical progress and risks is essential in projects. With EARNED VALUE MANAGEMENT (EVM) you get an extremely effective project control tool to bring the necessary transparency and security to your projects. Find out the answers to this difficult questions: - The actual costs are lower than the planned costs. Does this mean that the project is working well or that it is behind schedule? - The actual costs are higher than the planned costs and the project is half completed. What are the estimated costs of the project when it is completed? - When will the project be completed? - How efficiently are we using our time and resources? - How much will the profit or ROI be at the end of the project? With the answers to these questions you will quickly know the real status and health of your project. Overly optimistic estimates regarding actual project progress are quickly revealed with the EVM performance figures. This way you obtain early warning signals to manage y our project successfully and you can also make early forecasts of the project end costs and the probable project duration. In this book you will discover the most important concepts of Earned Value Management in order to apply it successfully. You will learn about the following topics: - Project control fundamentals - The Genesis of Earned Value Management - What is Earned Value Management and why do we need it? - Project and budget planning when using Earned Value Management - The calculation of the Earned Values and its derived EVM performance figures - Project monitoring and forecasts with EVM performance figures - Reporting when using Earned Value Management - Implementing Earned Value Management With its comprehensive glossary containing definitions of all key terms, this book is equally suitable as a comprehensive introduction and as a reference book for everyday work. This book is an indispensable manual for beginners in the EVM topic but also for experienced Project Managers, Project Controls Specialists and Project Portfolio Managers who have the first contact with EVM. The terminology used in this book is Check out the preview! Buy this book to make your projects even more successful!
Earned Value Management – Fast Start Guide
Author: Roland Wanner
Publisher: Proconis Publishing
ISBN:
Category : Business & Economics
Languages : en
Pages : 164
Book Description
Discover How to Make Your Project Control Even More Effective and Bring More Transparency and Security to Your Projects This book covers the basic concepts of EARNED VALUE MANAGEMENT in an easy understandable way. You will find on more than 200 pages comprehensive knowledge about Earned Value Management, simply explained with more than 50 illustrations – and aligned with the PMBOK® Guide 6th Edition 2018. Project control and reporting of costs, schedules, technical progress and risks is essential in projects. With EARNED VALUE MANAGEMENT (EVM) you get an extremely effective project control tool to bring the necessary transparency and security to your projects. Find out the answers to this difficult questions: - The actual costs are lower than the planned costs. Does this mean that the project is working well or that it is behind schedule? - The actual costs are higher than the planned costs and the project is half completed. What are the estimated costs of the project when it is completed? - When will the project be completed? - How efficiently are we using our time and resources? - How much will the profit or ROI be at the end of the project? With the answers to these questions you will quickly know the real status and health of your project. Overly optimistic estimates regarding actual project progress are quickly revealed with the EVM performance figures. This way you obtain early warning signals to manage y our project successfully and you can also make early forecasts of the project end costs and the probable project duration. In this book you will discover the most important concepts of Earned Value Management in order to apply it successfully. You will learn about the following topics: - Project control fundamentals - The Genesis of Earned Value Management - What is Earned Value Management and why do we need it? - Project and budget planning when using Earned Value Management - The calculation of the Earned Values and its derived EVM performance figures - Project monitoring and forecasts with EVM performance figures - Reporting when using Earned Value Management - Implementing Earned Value Management With its comprehensive glossary containing definitions of all key terms, this book is equally suitable as a comprehensive introduction and as a reference book for everyday work. This book is an indispensable manual for beginners in the EVM topic but also for experienced Project Managers, Project Controls Specialists and Project Portfolio Managers who have the first contact with EVM. The terminology used in this book is Check out the preview! Buy this book to make your projects even more successful!
Publisher: Proconis Publishing
ISBN:
Category : Business & Economics
Languages : en
Pages : 164
Book Description
Discover How to Make Your Project Control Even More Effective and Bring More Transparency and Security to Your Projects This book covers the basic concepts of EARNED VALUE MANAGEMENT in an easy understandable way. You will find on more than 200 pages comprehensive knowledge about Earned Value Management, simply explained with more than 50 illustrations – and aligned with the PMBOK® Guide 6th Edition 2018. Project control and reporting of costs, schedules, technical progress and risks is essential in projects. With EARNED VALUE MANAGEMENT (EVM) you get an extremely effective project control tool to bring the necessary transparency and security to your projects. Find out the answers to this difficult questions: - The actual costs are lower than the planned costs. Does this mean that the project is working well or that it is behind schedule? - The actual costs are higher than the planned costs and the project is half completed. What are the estimated costs of the project when it is completed? - When will the project be completed? - How efficiently are we using our time and resources? - How much will the profit or ROI be at the end of the project? With the answers to these questions you will quickly know the real status and health of your project. Overly optimistic estimates regarding actual project progress are quickly revealed with the EVM performance figures. This way you obtain early warning signals to manage y our project successfully and you can also make early forecasts of the project end costs and the probable project duration. In this book you will discover the most important concepts of Earned Value Management in order to apply it successfully. You will learn about the following topics: - Project control fundamentals - The Genesis of Earned Value Management - What is Earned Value Management and why do we need it? - Project and budget planning when using Earned Value Management - The calculation of the Earned Values and its derived EVM performance figures - Project monitoring and forecasts with EVM performance figures - Reporting when using Earned Value Management - Implementing Earned Value Management With its comprehensive glossary containing definitions of all key terms, this book is equally suitable as a comprehensive introduction and as a reference book for everyday work. This book is an indispensable manual for beginners in the EVM topic but also for experienced Project Managers, Project Controls Specialists and Project Portfolio Managers who have the first contact with EVM. The terminology used in this book is Check out the preview! Buy this book to make your projects even more successful!
The Standard for Earned Value Management
Author: Project Management Institute
Publisher: Project Management Institute
ISBN: 1628256397
Category : Business & Economics
Languages : en
Pages : 318
Book Description
Earned value management (EVM) is a management methodology for integrating scope, schedule, and resources; objectively measuring project performance and progress; and forecasting project outcome. It is considered by many to be one of the most effective performance measurement and feedback tools for managing projects. The Standard for Earned Value Management builds on the concepts for EVM described in the Practice Standard for Earned Value Management and includes enhanced project delivery information, by integrating concepts and practices from the PMBOK® Guide – Sixth Edition and The Agile Practice Guide. A central theme in this standard is the recognition that the definition for value in EVM has expanded. While the term retains its traditional definition in terms of project cost, it embraces current practice by including the concept of earned schedule. This standard also integrates hybrid methodologies that blend together historical EVM concepts with the needs of the agile practitioner, all with an eye towards aiding the project team in enhancing overall project delivery. This standard is a useful tool for experienced project management practitioners who are seeking to expand and update their knowledge of the field as well as less experienced practitioners who want to learn other approaches for managing project performance. It provides insight and detailed explanations of the basic elements and processes of EVM, and demonstrates how to scale EVM to fit varying project sizes and situations. This standard includes graphical examples and detailed explanations that will enable the reader to establish and implement EVM on projects in almost any environment and of almost every size. When used together with good project management principles, EVM methodology will provide a greater return on any project and results that will directly benefit your organization.
Publisher: Project Management Institute
ISBN: 1628256397
Category : Business & Economics
Languages : en
Pages : 318
Book Description
Earned value management (EVM) is a management methodology for integrating scope, schedule, and resources; objectively measuring project performance and progress; and forecasting project outcome. It is considered by many to be one of the most effective performance measurement and feedback tools for managing projects. The Standard for Earned Value Management builds on the concepts for EVM described in the Practice Standard for Earned Value Management and includes enhanced project delivery information, by integrating concepts and practices from the PMBOK® Guide – Sixth Edition and The Agile Practice Guide. A central theme in this standard is the recognition that the definition for value in EVM has expanded. While the term retains its traditional definition in terms of project cost, it embraces current practice by including the concept of earned schedule. This standard also integrates hybrid methodologies that blend together historical EVM concepts with the needs of the agile practitioner, all with an eye towards aiding the project team in enhancing overall project delivery. This standard is a useful tool for experienced project management practitioners who are seeking to expand and update their knowledge of the field as well as less experienced practitioners who want to learn other approaches for managing project performance. It provides insight and detailed explanations of the basic elements and processes of EVM, and demonstrates how to scale EVM to fit varying project sizes and situations. This standard includes graphical examples and detailed explanations that will enable the reader to establish and implement EVM on projects in almost any environment and of almost every size. When used together with good project management principles, EVM methodology will provide a greater return on any project and results that will directly benefit your organization.
PMP Exam Master Prep
Author: Scott Payne
Publisher: PMP Master Prep
ISBN: 9780996340656
Category :
Languages : en
Pages : 350
Book Description
Publisher: PMP Master Prep
ISBN: 9780996340656
Category :
Languages : en
Pages : 350
Book Description
Earned Value Management Using Microsoft Office Project
Author: Sham Dayal
Publisher: J. Ross Publishing
ISBN: 1932159983
Category : Business & Economics
Languages : en
Pages : 249
Book Description
Schedule and cost management are the most essential parts of project lifecycle management and many projects fail as a result of not managing these critical components effectively. The most commonly used tool for project schedule management is Microsoft Office Project, which is designed to assist project managers in developing schedules, assigning resources to tasks, tracking progress, managing budgets and analyzing workloads. The most common technique used for cost management is earned value management (EVM), a project management technique used for measuring project progress in an objective manner that combines measurements of project scope, schedule and cost performance within a single integrated methodology. EVM is becoming the standard across the world for this purpose in both the private and public sector and many organizations are now adopting this technique to manage their projects. In the public sector, EVM is mandated for all government projects in the United States and many other countries are following suit. Earned Value Management Using Microsoft® Office Project is the first reference to effectively combine the most widely used scheduling tool with the most widely accepted cost management technique. It is a practical guide to end-to-end scheduling and cost management using Microsoft Office Project that includes a CD-ROM of a limited version of a unique EVM software tool that will help practitioners more effectively manage their projects, track and report the status and progress of projects, and take necessary action before their projects fail beyond repair. This text is an excellent complement to whatever Microsoft Office Project guide that you may be using and a significant addition to the literature on how to use EVM.
Publisher: J. Ross Publishing
ISBN: 1932159983
Category : Business & Economics
Languages : en
Pages : 249
Book Description
Schedule and cost management are the most essential parts of project lifecycle management and many projects fail as a result of not managing these critical components effectively. The most commonly used tool for project schedule management is Microsoft Office Project, which is designed to assist project managers in developing schedules, assigning resources to tasks, tracking progress, managing budgets and analyzing workloads. The most common technique used for cost management is earned value management (EVM), a project management technique used for measuring project progress in an objective manner that combines measurements of project scope, schedule and cost performance within a single integrated methodology. EVM is becoming the standard across the world for this purpose in both the private and public sector and many organizations are now adopting this technique to manage their projects. In the public sector, EVM is mandated for all government projects in the United States and many other countries are following suit. Earned Value Management Using Microsoft® Office Project is the first reference to effectively combine the most widely used scheduling tool with the most widely accepted cost management technique. It is a practical guide to end-to-end scheduling and cost management using Microsoft Office Project that includes a CD-ROM of a limited version of a unique EVM software tool that will help practitioners more effectively manage their projects, track and report the status and progress of projects, and take necessary action before their projects fail beyond repair. This text is an excellent complement to whatever Microsoft Office Project guide that you may be using and a significant addition to the literature on how to use EVM.
Earned Value Project Management
Author: Quentin W. Fleming
Publisher:
ISBN:
Category : Business & Economics
Languages : en
Pages : 232
Book Description
Earned value is a project management technique that is emerging as a valuable tool in the management of all projects, including and, in particular, software projects. In its most simple form, earned value equates to fundamental project management. This is not a new book, but rather it is an updated book. Authors Quentin Fleming and Joel Koppelman have made some important additions. In many cases, there will be no changes to a given section. But in other sections, the authors have made substantial revisions to what they had described in the first edition. Fleming and Koppelman's goal remains the same with this update; describe earned value project management in its most fundamental form, for application to all projects, of any size or complexity. Writing in an easy-to-read, friendly, and humorous style characteristic of the best teachers, Fleming and Koppelman have identified the minimum requirements that they feel are necessary to use earned value as a simple tool for project managers. They have also witnessed the use of simple earned value on software projects, and find it particularly exciting. Realistically, a Cost Performance Index (CPI) is the same whether the project is a multibillion-dollar high-technology project, or a simple one hundred thousand-dollar software project. A CPI is a CPI ... period. It is a solid metric that reflects the health of the project. In every chapter, Fleming and Koppelman stick with using simple stories to define their central concept. Their project examples range from peeling potatoes to building a house. Examples are in rounc numbers, and most formulas get no more complicated than one number divided by another. Earned Value ProjectManagement--second edition may be the best-written, most easily understood project management book on the market today. Project managers will welcome this fresh translation of jargon into ordinary English. The authors have mastered a unique early-warning signal of impending cost problems in time for the project manager to react.
Publisher:
ISBN:
Category : Business & Economics
Languages : en
Pages : 232
Book Description
Earned value is a project management technique that is emerging as a valuable tool in the management of all projects, including and, in particular, software projects. In its most simple form, earned value equates to fundamental project management. This is not a new book, but rather it is an updated book. Authors Quentin Fleming and Joel Koppelman have made some important additions. In many cases, there will be no changes to a given section. But in other sections, the authors have made substantial revisions to what they had described in the first edition. Fleming and Koppelman's goal remains the same with this update; describe earned value project management in its most fundamental form, for application to all projects, of any size or complexity. Writing in an easy-to-read, friendly, and humorous style characteristic of the best teachers, Fleming and Koppelman have identified the minimum requirements that they feel are necessary to use earned value as a simple tool for project managers. They have also witnessed the use of simple earned value on software projects, and find it particularly exciting. Realistically, a Cost Performance Index (CPI) is the same whether the project is a multibillion-dollar high-technology project, or a simple one hundred thousand-dollar software project. A CPI is a CPI ... period. It is a solid metric that reflects the health of the project. In every chapter, Fleming and Koppelman stick with using simple stories to define their central concept. Their project examples range from peeling potatoes to building a house. Examples are in rounc numbers, and most formulas get no more complicated than one number divided by another. Earned Value ProjectManagement--second edition may be the best-written, most easily understood project management book on the market today. Project managers will welcome this fresh translation of jargon into ordinary English. The authors have mastered a unique early-warning signal of impending cost problems in time for the project manager to react.
Using Earned Value
Author: Alan Webb
Publisher: Routledge
ISBN: 1317003063
Category : Business & Economics
Languages : en
Pages : 188
Book Description
The concept of 'earned value' as a project management tool has been around since the 1960s; although recognized as an important technique and widely used on US Government contracts, it failed to excite much interest in the wider world because of its specifically American requirements and the cumbersome, prescriptive bureaucracy that seemed to accompany it. Recently however, with the advent of suitable software and used in a much more flexible way, there has been a growth in interest among project managers. Crucially it has been recognised that this technique can be helpful in a wide variety of projects of almost any size, not just government projects costing billions of pounds. In essence, earned value allows the project manager a more precise view of actual project performance in terms of both value generated and schedule progress than is possible with any other approach. Alan Webb's concise guide provides practising project managers with everything they need to: ¢ assess the appropriateness and benefits of the earned value process for both their project(s) and their organization; ¢ appreciate, understand and learn the techniques involved; ¢ identify how to apply the data to manage projects with flexibility, pragmatism and rigour; ¢ understand the different features and benefits of the various software packages available; ¢ plan for the introduction of an earned value methodology, anticipating both the systems and people problems they may face. The book uses worked examples, cases and anecdotes from the author's own extensive experience to bring this technical subject to life. Alan's writing style is direct and economical, which means that whether you are dipping into chapters for reference or reading about the process from cover to cover, everything he has to say is pertinent and helpful.
Publisher: Routledge
ISBN: 1317003063
Category : Business & Economics
Languages : en
Pages : 188
Book Description
The concept of 'earned value' as a project management tool has been around since the 1960s; although recognized as an important technique and widely used on US Government contracts, it failed to excite much interest in the wider world because of its specifically American requirements and the cumbersome, prescriptive bureaucracy that seemed to accompany it. Recently however, with the advent of suitable software and used in a much more flexible way, there has been a growth in interest among project managers. Crucially it has been recognised that this technique can be helpful in a wide variety of projects of almost any size, not just government projects costing billions of pounds. In essence, earned value allows the project manager a more precise view of actual project performance in terms of both value generated and schedule progress than is possible with any other approach. Alan Webb's concise guide provides practising project managers with everything they need to: ¢ assess the appropriateness and benefits of the earned value process for both their project(s) and their organization; ¢ appreciate, understand and learn the techniques involved; ¢ identify how to apply the data to manage projects with flexibility, pragmatism and rigour; ¢ understand the different features and benefits of the various software packages available; ¢ plan for the introduction of an earned value methodology, anticipating both the systems and people problems they may face. The book uses worked examples, cases and anecdotes from the author's own extensive experience to bring this technical subject to life. Alan's writing style is direct and economical, which means that whether you are dipping into chapters for reference or reading about the process from cover to cover, everything he has to say is pertinent and helpful.
Measuring Time
Author: Mario Vanhoucke
Publisher: Springer Science & Business Media
ISBN: 144191014X
Category : Technology & Engineering
Languages : en
Pages : 184
Book Description
Meant to complement rather than compete with the existing books on the subject, this book deals with the project performance and control phases of the project life cycle to present a detailed investigation of the project’s time performance measurement methods and risk analysis techniques in order to evaluate existing and newly developed methods in terms of their abilities to improve the corrective actions decision-making process during project tracking. As readers apply what is learned from the book, EVM practices will become even more effective in project management and cost engineering. Individual chapters look at simulation studies in forecast accuracy; schedule adherence; time sensitivity; activity sensitivity; and using top-down or bottom-up project tracking. Vanhoucke also offers an actual real-life case study, a tutorial on the use of ProTrack software (newly developed based on his research) in EVM, and conclusions on the relative effectiveness for each technique presented.
Publisher: Springer Science & Business Media
ISBN: 144191014X
Category : Technology & Engineering
Languages : en
Pages : 184
Book Description
Meant to complement rather than compete with the existing books on the subject, this book deals with the project performance and control phases of the project life cycle to present a detailed investigation of the project’s time performance measurement methods and risk analysis techniques in order to evaluate existing and newly developed methods in terms of their abilities to improve the corrective actions decision-making process during project tracking. As readers apply what is learned from the book, EVM practices will become even more effective in project management and cost engineering. Individual chapters look at simulation studies in forecast accuracy; schedule adherence; time sensitivity; activity sensitivity; and using top-down or bottom-up project tracking. Vanhoucke also offers an actual real-life case study, a tutorial on the use of ProTrack software (newly developed based on his research) in EVM, and conclusions on the relative effectiveness for each technique presented.
Project Management Using Earned Value
Author: Gary C. Humphreys
Publisher: Humphreys & Assoc
ISBN: 9780970861405
Category : Cost control
Languages : en
Pages : 904
Book Description
Publisher: Humphreys & Assoc
ISBN: 9780970861405
Category : Cost control
Languages : en
Pages : 904
Book Description
Project Management Tools and Techniques
Author: Deborah Sater Carstens
Publisher: CRC Press
ISBN: 042955821X
Category : Technology & Engineering
Languages : en
Pages : 505
Book Description
The topic of project management is truly an evolution of art seeking science. This activity involves balancing project objectives against the constraints of time, budget, and quality. Achieving this balance requires skill, experience, along with the use of many tools, and techniques which are the focus of this book. This new edition provides updated content to incorporate examples from Microsoft Project 2016 and material from the Project Management Body of Knowledge (PMBOK® Guide), sixth edition. The chapter structure includes step-by-step instructions regarding the basic mechanics and various software tools that can be used to assist in the processes. To reinforce the textbook’s learning objectives, extra material is provided on the textbook website. This includes mechanical tool examples and lab assignments representative of the chapter topics. An external video tutorial library is available to help with various mechanics related to Microsoft Project mechanics. An instructor manual is available for qualifying adoptions for classroom use. Features Illustrates the use of Microsoft Project throughout the project life cycle Offers templates as productivity enhancement tools Includes supplemental material for students and instructors Provides assignments for hands-on experience Follows the PMI PMBOK ® Guide model structure that will support a better understanding of the model and help prepare students for PMP and CAPM certification Illustrates both traditional and contemporary management techniques
Publisher: CRC Press
ISBN: 042955821X
Category : Technology & Engineering
Languages : en
Pages : 505
Book Description
The topic of project management is truly an evolution of art seeking science. This activity involves balancing project objectives against the constraints of time, budget, and quality. Achieving this balance requires skill, experience, along with the use of many tools, and techniques which are the focus of this book. This new edition provides updated content to incorporate examples from Microsoft Project 2016 and material from the Project Management Body of Knowledge (PMBOK® Guide), sixth edition. The chapter structure includes step-by-step instructions regarding the basic mechanics and various software tools that can be used to assist in the processes. To reinforce the textbook’s learning objectives, extra material is provided on the textbook website. This includes mechanical tool examples and lab assignments representative of the chapter topics. An external video tutorial library is available to help with various mechanics related to Microsoft Project mechanics. An instructor manual is available for qualifying adoptions for classroom use. Features Illustrates the use of Microsoft Project throughout the project life cycle Offers templates as productivity enhancement tools Includes supplemental material for students and instructors Provides assignments for hands-on experience Follows the PMI PMBOK ® Guide model structure that will support a better understanding of the model and help prepare students for PMP and CAPM certification Illustrates both traditional and contemporary management techniques
Earned Value Project Management (Fourth Edition)
Author: Quentin W. Fleming
Publisher: Project Management Institute
ISBN: 1935589415
Category : Business & Economics
Languages : en
Pages : 397
Book Description
Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projects. An important addition to Earned Value Project Management &– Fourth Edition is the discussion of the two perceptions of the EVM concept. Both are valid, but one is better suited to the management of major projects while the other appropriate for use on all projects. The authors cover both perceptions in this book, with a bias in favor of simple, broad-based EVM for use on all projects.
Publisher: Project Management Institute
ISBN: 1935589415
Category : Business & Economics
Languages : en
Pages : 397
Book Description
Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projects. An important addition to Earned Value Project Management &– Fourth Edition is the discussion of the two perceptions of the EVM concept. Both are valid, but one is better suited to the management of major projects while the other appropriate for use on all projects. The authors cover both perceptions in this book, with a bias in favor of simple, broad-based EVM for use on all projects.