Craney Island Disposal Area, Replacement Study, Hampton Roads

Craney Island Disposal Area, Replacement Study, Hampton Roads PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 26

Get Book Here

Book Description

Craney Island Disposal Area, Replacement Study, Hampton Roads

Craney Island Disposal Area, Replacement Study, Hampton Roads PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 26

Get Book Here

Book Description


Final Environmental Report

Final Environmental Report PDF Author: United States. Army. Office of the Chief of Engineers
Publisher:
ISBN:
Category : Dredging spoil
Languages : en
Pages :

Get Book Here

Book Description


Revised Draft Environmental Statement

Revised Draft Environmental Statement PDF Author: United States. Army. Corps of Engineers. Norfolk District
Publisher:
ISBN:
Category : Dredging spoil
Languages : en
Pages :

Get Book Here

Book Description


An Ecological Study of the Craney Island Disposal Area in Hampton Roads, Virginia

An Ecological Study of the Craney Island Disposal Area in Hampton Roads, Virginia PDF Author: David Wallace Laist
Publisher:
ISBN:
Category : Craney Island (Va.)
Languages : en
Pages : 170

Get Book Here

Book Description


Geotechnical Feasibility Study Replacement Or Extension of the Craney Island Disposal Area, Norfolk, Virginia

Geotechnical Feasibility Study Replacement Or Extension of the Craney Island Disposal Area, Norfolk, Virginia PDF Author: S. J. Spigolon
Publisher:
ISBN:
Category : Craney Island (Va.)
Languages : en
Pages : 41

Get Book Here

Book Description
Several alternatives were investigated to replace or extend the 2,500-acre Craney Island Disposal Area for continued dredged material disposal for the Norfolk harbor and channels. The disposal area was completed in 1957 and has been used continuously since that time and the dikes have been raised several times to the present e1 +26 ft Mean Low Water (MLW). Because of new plans to deepen the existing channel and continued maintenance dredging, the estimated storage life has greatly reduced. Five alternate configurations of the extension of Craney Island to the west and/or north were investigated as to their estimated storage capacity, their effect on the hydrodynamics of the harbor and river system, and the stability and constructibility of the retaining dikes which is the subject of this report. It was determined that: 1) it is technically feasible to design and construct the required dikes to e1 +8 ft MLW by hydraulic placement of sand; and 2) these dikes could be protected from erosion by the placement of riprap on the inside and outside slopes. The most economically feasible alternatives for storage capacity were configurations 5 and 2 which had an estimated cost per cubic yard of storage of $0.58 and $0.70, respectively. Keywords: Dike stability.

102 Monitor

102 Monitor PDF Author:
Publisher:
ISBN:
Category : Administrative agencies
Languages : en
Pages : 160

Get Book Here

Book Description


Public Works for Water and Power Development and Energy Research Appropriations for Fiscal Year 1979

Public Works for Water and Power Development and Energy Research Appropriations for Fiscal Year 1979 PDF Author: United States. Congress. Senate. Committee on Appropriations. Subcommittee on Public Works
Publisher:
ISBN:
Category : Public works
Languages : en
Pages : 1284

Get Book Here

Book Description


Norfolk Harbor and Channels, Deepening and Disposal

Norfolk Harbor and Channels, Deepening and Disposal PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 568

Get Book Here

Book Description


The Craney Island Disposal Area

The Craney Island Disposal Area PDF Author: United States. Army. Corps of Engineers. Norfolk District
Publisher:
ISBN:
Category : Dredging spoil
Languages : en
Pages : 69

Get Book Here

Book Description


Federal Register

Federal Register PDF Author:
Publisher:
ISBN:
Category : Delegated legislation
Languages : en
Pages : 1588

Get Book Here

Book Description