Charleston Harbor Deepening Project, Charleston Harbor and Shipyard River, South Carolina

Charleston Harbor Deepening Project, Charleston Harbor and Shipyard River, South Carolina PDF Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category : Charleston (S.C.)
Languages : en
Pages : 264

Get Book Here

Book Description

Charleston Harbor Deepening Project, Charleston Harbor and Shipyard River, South Carolina

Charleston Harbor Deepening Project, Charleston Harbor and Shipyard River, South Carolina PDF Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category : Charleston (S.C.)
Languages : en
Pages : 264

Get Book Here

Book Description


Charleston Harbor Deepening Project : Charleston Harbor and Shipyard River, South Carolina

Charleston Harbor Deepening Project : Charleston Harbor and Shipyard River, South Carolina PDF Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages : 253

Get Book Here

Book Description


Charleston Harbor Deepening Project. Charleston Harbor and Shipyard River, South Carolina

Charleston Harbor Deepening Project. Charleston Harbor and Shipyard River, South Carolina PDF Author: CORPS OF ENGINEERS CHARLESTON SC CHARLESTON DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 238

Get Book Here

Book Description
The purpose of this project is to provide safe navigation for existing and prospective large vessel traffic by deepening existing channels providing new and enlarged turning basins, and providing minor alignment changes and easing of bends. The proposed plan of improvement for Charleston Harbor consists of the following: (a) Deepening the existing entrance channel from a depth of 35 feet to a depth of 42 feet; (b) Deepening the existing entrance channel from a depth of 35 feet to a depth of 40 feet from the Entrance Channel (Mile 0.6) to Mile 15.7 at Goose Creek; (c) Deepening the Shipyard River channel from 30 feet to 38 feet; (d) Enlargement of the anchorage basin at the harbor mouth; (e) Enlargement of the existing turning basin at the head of the commercial channel; (f) Dredging a new turning basin adjacent to the Columbus Street docks; (g) Widening North Charleston and Filbin reaches to 500 feet; (h) Shifting of channels near the various terminals to provide 125 feet between existing piers and the edge of the channel.

Charleston Harbor Deepening Project, Charleston Harbor and Shipyard River

Charleston Harbor Deepening Project, Charleston Harbor and Shipyard River PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 308

Get Book Here

Book Description


Charleston Harbor, South Carolina

Charleston Harbor, South Carolina PDF Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category : Harbors
Languages : en
Pages : 432

Get Book Here

Book Description


Charleston Harbor, South Carolina. Feasibility Report. Deepening and Extending Channels for Navigation

Charleston Harbor, South Carolina. Feasibility Report. Deepening and Extending Channels for Navigation PDF Author: CORPS OF ENGINEERS CHARLESTON SC CHARLESTON DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 92

Get Book Here

Book Description
This interim report presents the engineering, economic, and environmental studies conducted to determine the advisability of modifying the existing project in partial compliance to seven congressional resolutions. Various solutions to the problems and needs of continued harbor development were analyzed. Based on the results of this analysis and demonstrated interest by private industry and local authorities, it is concluded that the most feasible plan for satisfying future harbor needs consists of deepening the existing Charleston Harbor and Shipyard River channels. Minor channel widening and improving the anchorage and turning basins to commensurate depths with the channels will be provided. Therefore, it is recommended that the existing projects for Charleston Harbor and Shipyard River, South Carolina, be modified to provide for the construction and maintenance of a 40-foot and 38-foot Federal navigation project in Charleston Harbor (Cooper River) and Shipyard River, respectively, conditional to implementation of the Cooper River Rediversion Project. If the Cooper River Rediversion Project is delayed, it is recommended that the plan of improvement be reduced to 38 feet and 35 feet, respectively, for Charleston Harbor and Shipyard river during the interim period.

Prototype Confirmation of Model Investigation, Charleston Harbor, South Carolina

Prototype Confirmation of Model Investigation, Charleston Harbor, South Carolina PDF Author: Ellis B. Pickett
Publisher:
ISBN:
Category : Harbors
Languages : en
Pages : 116

Get Book Here

Book Description


Deepening and Extending Channels for Navigation. Charleston Harbor, South Carolina

Deepening and Extending Channels for Navigation. Charleston Harbor, South Carolina PDF Author: CORPS OF ENGINEERS CHARLESTON SC CHARLESTON DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 143

Get Book Here

Book Description
This report recommends deepening the existing Charleston and Shipyard River Project, to 40 and 38 feet respectively. Some additional basin and channel widening is also recommended. Ocean disposal was the most viable means of disposing of the dredged material. (Author).

Survey Report on Cooper River, S.C. (shoaling in Charleston Harbor)

Survey Report on Cooper River, S.C. (shoaling in Charleston Harbor) PDF Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category : Charleston Harbor (S.C.)
Languages : en
Pages : 222

Get Book Here

Book Description


Charleston Harbor, Ashley River, Cooper River Maintenance Dredging, Charleston/Berkeley Counties

Charleston Harbor, Ashley River, Cooper River Maintenance Dredging, Charleston/Berkeley Counties PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 138

Get Book Here

Book Description