Author:
Publisher:
ISBN:
Category : Chinook salmon
Languages : en
Pages : 900
Book Description
Lower Snake River Juvenile Salmon Migration Feasibility Report
Fish and Wildlife Implementation Plan
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 592
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 592
Book Description
A Cost-effectiveness Analysis of Snake River Salmon Management Activities
Author: David L. Halsing
Publisher:
ISBN:
Category : Chinook salmon
Languages : en
Pages : 134
Book Description
Publisher:
ISBN:
Category : Chinook salmon
Languages : en
Pages : 134
Book Description
Lower Snake River Juvenile Salmon Migration Feasibility Report/Environmental Impact Statement. Appendix J: Plan Formulation
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 119
Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U S Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project
Publisher:
ISBN:
Category :
Languages : en
Pages : 119
Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U S Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project
Federal Water Project Recreation Act
Author: United States. Congress. House. Committee on Interior and Insular Affairs
Publisher:
ISBN:
Category : Outdoor recreation
Languages : en
Pages : 30
Book Description
Publisher:
ISBN:
Category : Outdoor recreation
Languages : en
Pages : 30
Book Description
Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix C
Author:
Publisher:
ISBN: 9781423505198
Category :
Languages : en
Pages : 207
Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/ElS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower-Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U.S. Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project. The Final FR/EIS includes the best available information on the biological effectiveness, engineering components, costs, economic effects, and other environmental effects associated with the four alternatives: Alternative 1-Existing Conditions, Alternative 2-Maximum Transport of Juvenile Salmon, Alternative 3-Major System Improvements (Adaptive Migration), and Alternative 4-Dam Breaching. In the Final FR/EIS, the Corps identifies Alternative 3-Major System Improvements (Adaptive Migration as the recommended plan (preferred alternative) and explains the process for selecting that alternative.
Publisher:
ISBN: 9781423505198
Category :
Languages : en
Pages : 207
Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/ElS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower-Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U.S. Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project. The Final FR/EIS includes the best available information on the biological effectiveness, engineering components, costs, economic effects, and other environmental effects associated with the four alternatives: Alternative 1-Existing Conditions, Alternative 2-Maximum Transport of Juvenile Salmon, Alternative 3-Major System Improvements (Adaptive Migration), and Alternative 4-Dam Breaching. In the Final FR/EIS, the Corps identifies Alternative 3-Major System Improvements (Adaptive Migration as the recommended plan (preferred alternative) and explains the process for selecting that alternative.
Government Reports Announcements & Index
Author:
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 1130
Book Description
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 1130
Book Description
Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix L: Lower Snake River Mitigation History and Status. Appendix M
Author:
Publisher:
ISBN: 9781423505174
Category :
Languages : en
Pages : 393
Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U.S. Bureau of reclamation (BOR) as cooperating agencies, analyzed four alternative to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project. The Final FR/EIS includes the best available information on the biological effectiveness, engineering components, costs, economic effects, and other environmental effects associated with the four alternatives: Alternative 1-Existing Conditions, Alternative 2-Maximum Transport of Juvenile Salmon, Alternative 3-Major System Improvements (Adaptive Migration), and Alternative 4-Dam Breaching. In the Final FR/EIS, the Corps identifies Alternative 3-Major System Improvements (Adaptive Migration) as the recommended plan (preferred alternative) and explains the process for selecting that alternative.
Publisher:
ISBN: 9781423505174
Category :
Languages : en
Pages : 393
Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U.S. Bureau of reclamation (BOR) as cooperating agencies, analyzed four alternative to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project. The Final FR/EIS includes the best available information on the biological effectiveness, engineering components, costs, economic effects, and other environmental effects associated with the four alternatives: Alternative 1-Existing Conditions, Alternative 2-Maximum Transport of Juvenile Salmon, Alternative 3-Major System Improvements (Adaptive Migration), and Alternative 4-Dam Breaching. In the Final FR/EIS, the Corps identifies Alternative 3-Major System Improvements (Adaptive Migration) as the recommended plan (preferred alternative) and explains the process for selecting that alternative.
Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix D
Author:
Publisher:
ISBN: 9781423504924
Category :
Languages : en
Pages : 409
Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U S Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project
Publisher:
ISBN: 9781423504924
Category :
Languages : en
Pages : 409
Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U S Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project
Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix I
Author:
Publisher:
ISBN: 9781423505181
Category :
Languages : en
Pages : 543
Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U.S. Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project. The Final FR/EIS includes the best available information on the biological effectiveness, engineering components, costs, economic effects, and other environmental effects associated with the four alternatives: Alternative 1-Existing Conditions, Alternative 2-Maximum Transport of Juvenile Salmon, Alternative 3-Major System Improvements (adaptive Migration), and Alternative 4-Dam Breaching. In the Final FR/EIS, the Corps identifies Alternative 3-Major System Improvements (Adaptive Migration) as the recommended plan (preferred alternative) and explains the process for selecting that alternative.
Publisher:
ISBN: 9781423505181
Category :
Languages : en
Pages : 543
Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U.S. Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project. The Final FR/EIS includes the best available information on the biological effectiveness, engineering components, costs, economic effects, and other environmental effects associated with the four alternatives: Alternative 1-Existing Conditions, Alternative 2-Maximum Transport of Juvenile Salmon, Alternative 3-Major System Improvements (adaptive Migration), and Alternative 4-Dam Breaching. In the Final FR/EIS, the Corps identifies Alternative 3-Major System Improvements (Adaptive Migration) as the recommended plan (preferred alternative) and explains the process for selecting that alternative.