Analytical Results for the 107-N and 1310-N Basin Sedimentdisposition Sample Characterization Project

Analytical Results for the 107-N and 1310-N Basin Sedimentdisposition Sample Characterization Project PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 231

Get Book Here

Book Description
Turnaround time for this project was 60 days, as required in Reference 2. The analyses were to be performed using SW-846 procedures whenever possible to meet analytical requirements as a Resource Conservation Recovery Act (RCRA) protocol project. Except for the preparation and analyses of polychlorinated biphenyl hydrocarbons (PCB) and Nickel-63, which the program deleted as a required analyte for 222-S Laboratory, all preparative and analytical work was performed at the 222-S Laboratory. Quanterra Environmental Services of Earth City, Missouri, performed the PCB analyses. During work on this project, two events occurred nearly simultaneously, which negatively impacted the 60 day deliverable schedule: an analytical hold due to waste handling issues at the 222-S Laboratory, and the discovery of PCBs at concentrations of regulatory significance in the 105-N Basin samples. Due to findings of regulatory non-compliance by the Washington State, Department of Ecology, the 222-S Laboratory placed a temporary administrative hold on its analytical work until all waste handling, designation and segregation issues were resolved. During the hold of approximately three weeks, all analytical and waste.handling procedures were rewritten to comply with the legal regulations, and all staff were retrained in the designation, segregation and disposal of RCRA liquid and solid wastes.

Analytical Results for the 107-N and 1310-N Basin Sedimentdisposition Sample Characterization Project

Analytical Results for the 107-N and 1310-N Basin Sedimentdisposition Sample Characterization Project PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 231

Get Book Here

Book Description
Turnaround time for this project was 60 days, as required in Reference 2. The analyses were to be performed using SW-846 procedures whenever possible to meet analytical requirements as a Resource Conservation Recovery Act (RCRA) protocol project. Except for the preparation and analyses of polychlorinated biphenyl hydrocarbons (PCB) and Nickel-63, which the program deleted as a required analyte for 222-S Laboratory, all preparative and analytical work was performed at the 222-S Laboratory. Quanterra Environmental Services of Earth City, Missouri, performed the PCB analyses. During work on this project, two events occurred nearly simultaneously, which negatively impacted the 60 day deliverable schedule: an analytical hold due to waste handling issues at the 222-S Laboratory, and the discovery of PCBs at concentrations of regulatory significance in the 105-N Basin samples. Due to findings of regulatory non-compliance by the Washington State, Department of Ecology, the 222-S Laboratory placed a temporary administrative hold on its analytical work until all waste handling, designation and segregation issues were resolved. During the hold of approximately three weeks, all analytical and waste.handling procedures were rewritten to comply with the legal regulations, and all staff were retrained in the designation, segregation and disposal of RCRA liquid and solid wastes.

Final Report for 105-N Basin Sediment Disposition Task, Phase 2 -- Samples BOMPC8 and BOMPC9

Final Report for 105-N Basin Sediment Disposition Task, Phase 2 -- Samples BOMPC8 and BOMPC9 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 137

Get Book Here

Book Description
This document is the final report deliverable for Phase 2 analytical work for the 105-N Basin Sediment Disposition Task. On December 23, 1997, ten samples were received at the 222-S Laboratory as follows: two (2) bottles of potable water, six (6) samples for process control testing and two (2) samples for characterization. Analyses were performed in accordance with the Letter of Instruction for Phase 2 Analytical Work for the 105-N Basin Sediment Disposition Task (Logan and Kessner, 1997) (Attachment 7) and 105-N Basin Sediment Disposition Phase-Two Sampling and Analysis Plan (SAP) (Smith, 1997). The analytical results are included in Table 1. This document provides the values of X/Qs for the onsite and offsite receptors, taking into account the building wake and the atmospheric stability effects. X/Qs values for the potential fire accident were also calculated. In addition, the unit dose were calculated for the mixtures of isotopes.

The Toxicology and Biochemistry of Insecticides

The Toxicology and Biochemistry of Insecticides PDF Author: Simon J. Yu
Publisher: CRC Press
ISBN: 1420059769
Category : Science
Languages : en
Pages : 294

Get Book Here

Book Description
The first book in two decades to address this multi-faceted field, The Toxicology and Biochemistry of Insecticides provides the most up-to-date information on insecticide classification, formulation, mode of action, resistance, metabolism, environmental fate, and regulatory legislation. The book draws on the author's groundbreaking research