CIS US Congressional Committee Hearings Index: 74th Congress-78th Congress, 1935-1944 (6 v.)

CIS US Congressional Committee Hearings Index: 74th Congress-78th Congress, 1935-1944 (6 v.) PDF Author:
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 690

Get Book Here

Book Description

CIS US Congressional Committee Hearings Index: 74th Congress-78th Congress, 1935-1944 (6 v.)

CIS US Congressional Committee Hearings Index: 74th Congress-78th Congress, 1935-1944 (6 v.) PDF Author:
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 690

Get Book Here

Book Description


CIS US Congressional Committee Hearings Index

CIS US Congressional Committee Hearings Index PDF Author:
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 692

Get Book Here

Book Description


Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans PDF Author: Ronald O'Rourke
Publisher:
ISBN:
Category :
Languages : en
Pages : 145

Get Book Here

Book Description
Updated 12/10/2020: In December 2016, the Navy released a force-structure goal that callsfor achieving and maintaining a fleet of 355 ships of certain types and numbers. The 355-shipgoal was made U.S. policy by Section 1025 of the FY2018 National Defense AuthorizationAct (H.R. 2810/P.L. 115- 91 of December 12, 2017). The Navy and the Department of Defense(DOD) have been working since 2019 to develop a successor for the 355-ship force-level goal.The new goal is expected to introduce a new, more distributed fleet architecture featuring asmaller proportion of larger ships, a larger proportion of smaller ships, and a new third tier oflarge unmanned vehicles (UVs). On December 9, 2020, the Trump Administration released a document that can beviewed as its vision for future Navy force structure and/or a draft version of the FY202230-year Navy shipbuilding plan. The document presents a Navy force-level goal that callsfor achieving by 2045 a Navy with a more distributed fleet architecture, 382 to 446 mannedships, and 143 to 242 large UVs. The Administration that takes office on January 20, 2021,is required by law to release the FY2022 30-year Navy shipbuilding plan in connection withDOD's proposed FY2022 budget, which will be submitted to Congress in 2021. In preparingthe FY2022 30-year shipbuilding plan, the Administration that takes office on January 20,2021, may choose to adopt, revise, or set aside the document that was released on December9, 2020. The Navy states that its original FY2021 budget submission requests the procurement ofeight new ships, but this figure includes LPD-31, an LPD-17 Flight II amphibious ship thatCongress procured (i.e., authorized and appropriated procurement funding for) in FY2020.Excluding this ship, the Navy's original FY2021 budget submission requests the procurementof seven new ships rather than eight. In late November 2020, the Trump Administrationreportedly decided to request the procurement of a second Virginia-class attack submarinein FY2021. CRS as of December 10, 2020, had not received any documentation from theAdministration detailing the exact changes to the Virginia-class program funding linesthat would result from this reported change. Pending the delivery of that information fromthe administration, this CRS report continues to use the Navy's original FY2021 budgetsubmission in its tables and narrative discussions.

Interagency Grizzly Bear Guidelines

Interagency Grizzly Bear Guidelines PDF Author:
Publisher:
ISBN:
Category : Endangered species
Languages : en
Pages : 110

Get Book Here

Book Description


Navy Frigate (FFG[X]) Program

Navy Frigate (FFG[X]) Program PDF Author: Ronald O'Rourke
Publisher:
ISBN:
Category :
Languages : en
Pages : 40

Get Book Here

Book Description
The FFG(X) program is a Navy program to build a class of 20 guided-missile frigates (FFGs). Congress funded the procurement of the first FFG(X) in FY2020 at a cost of $1,281.2 million (i.e., about $1.3 billion). The Navy's proposed FY2021 budget requests $1,053.1 million (i.e., about $1.1 billion) for the procurement of the second FFG(X). The Navy estimates that subsequent ships in the class will cost roughly $940 million each in then-year dollars. On April 30, 2020, the Navy announced that it had awarded the FFG(X) contract to the team led by Fincantieri/Marinette Marine (F/MM) of Marinette, WI. F/MM was awarded a fixed-price incentive (firm target) contract for Detail Design and Construction (DD&C) for up to 10 ships in the program-the lead ship plus nine option ships.Under the DD&C contact awarded to F/MM, Navy has the option of recompeting the FFG(X) program after the lead ship (if none of the nine option ships are exercised), after the 10th ship (if all nine of the option ships are exercised), or somewhere in between (if some but not all of the nine option ships are exercised).

Navy Large Unmanned Surface and Undersea Vehicles

Navy Large Unmanned Surface and Undersea Vehicles PDF Author: Ronald O'Rourke
Publisher:
ISBN: 9781075833274
Category :
Languages : en
Pages : 30

Get Book Here

Book Description
The Navy wants to develop and procure three new types of unmanned vehicles (UVs) in FY2020 and beyond-Large Unmanned Surface Vehicles (LUSVs), Medium Unmanned Surface Vehicles (MUSVs), and Extra-Large Unmanned Undersea Vehicles (XLUUVs). The Navy is requesting $628.8 million in FY2020 research and development funding for these three UV programs and their enabling technologies. The Navy wants to acquire these three types of UVs (which this report refers to collectively as large UVs) as part of an effort to shift the Navy to a new fleet architecture (i.e., a new combination of ships and other platforms) that is more widely distributed than the Navy's current architecture. Compared to the current fleet architecture, this more-distributed architecture is to include proportionately fewer large surface combatants (i.e., cruisers and destroyers), proportionately more small surface combatants (i.e., frigates and Littoral Combat Ships), and the addition of significant numbers of large UVs. The Navy wants to employ accelerated acquisition strategies for procuring these large UVs, so as to get them into service more quickly. The emphasis that the Navy placed on UV programs in its FY2020 budget submission and the Navy's desire to employ accelerated acquisition strategies in acquiring these large UVs together can be viewed as an expression of the urgency that the Navy attaches to fielding large UVs for meeting future military challenges from countries such as China. The LUSV program is a proposed new start project for FY2020. The Navy wants to procure two LUSVs per year in FY2020FY2024. The Navy wants LUSVs to be low-cost, high-endurance, reconfigurable ships based on commercial ship designs, with ample capacity for carrying various modular payloads-particularly anti-surface warfare (ASuW) and strike payloads, meaning principally anti-ship and land-attack missiles. The Navy reportedly envisions LUSVs as being 200 feet to 300 feet in length and having a full load displacement of about 2,000 tons. The MUSV program began in FY2019. The Navy plans to award a contract for the first MUSV in FY2019 and wants to award a contract for the second MUSV in FY2023. The Navy wants MUSVs, like LUSVs, to be low-cost, high-endurance, reconfigurable ships that can accommodate various payloads. Initial payloads for MUSVs are to be intelligence, surveillance and reconnaissance (ISR) payloads and electronic warfare (EW) systems. The Navy defines MUSVs as having a length of between 12 meters (about 39 feet) and 50 meters (about 164 feet). The Navy wants to pursue the MUSV program as a rapid prototyping effort under what is known as Section 804 acquisition authority. The XLUUV program, also known as Orca, was established to address a Joint Emergent Operational Need (JEON). The Navy wants to procure nine XLUUVs in FY2020-FY2024. The Navy announced on February 13, 2019, that it had selected Boeing to fabricate, test, and deliver the first four Orca XLUUVs and associated support elements. On March 27, 2019, the Navy announced that the award to Boeing had been expanded to include the fifth Orca. The Navy's large UV programs pose a number of oversight issues for Congress, including issues relating to the analytical basis for the more-distributed fleet architecture; the Navy's accelerated acquisition strategies and funding method for these programs; technical, schedule, and cost risk in the programs; the proposed annual procurement rates for the programs; the industrial base implications of the programs; the personnel implications of the programs; and whether the Navy has accurately priced the work it is proposing to do in FY2020 on the programs.

Defense Demilitarization Manual

Defense Demilitarization Manual PDF Author: United States. Office of the Assistant Secretary of Defense (Installations and Logistics)
Publisher:
ISBN:
Category : Surplus military property
Languages : en
Pages : 148

Get Book Here

Book Description


Navy John Lewis (TAO-205) Class Oiler Shipbuilding Program

Navy John Lewis (TAO-205) Class Oiler Shipbuilding Program PDF Author: Ronald O'Rourke
Publisher:
ISBN:
Category : Armed Forces
Languages : en
Pages : 0

Get Book Here

Book Description


Commandant's Planning Guidance

Commandant's Planning Guidance PDF Author: General David H. Berger
Publisher:
ISBN: 9781608881475
Category : History
Languages : en
Pages : 28

Get Book Here

Book Description
The Commandant's Planning Guidance (CPG) provides the 38th Commandant's strategic direction for the Marine Corps and mirrors the function of the Secretary of Defense's Defense Planning Guidance (DPG). It serves as the authoritative document for Service-level planning and provides a common direction to the Marine Corps Total Force. It also serves as a road map describing where the Marine Corps is going and why; what the Marine Corps force development priorities are and are not; and, in some instances, how and when prescribed actions will be implemented. This CPG serves as my Commandant's Intent for the next four years. As Commandant Neller observed, "The Marine Corps is not organized, trained, equipped, or postured to meet the demands of the rapidly evolving future operating environment." I concur with his diagnosis. Significant change is required to ensure we are aligned with the 2018 National Defense Strategy (NDS) and DPG, and further, prepared to meet the demands of the Naval Fleet in executing current and emerging operational naval concepts. Effecting that change will be my top priority as your 38th Commandant. This CPG outlines my five priority focus areas: force design, warfighting, education and training, core values, and command and leadership. I will use these focal areas as logical lines of effort to frame my thinking, planning, and decision-making at Headquarters Marine Corps (HQMC), as well as to communicate to our civilian leadership. This document explains how we will translate those focus areas into action with measurable outcomes. The institutional changes that follow this CPG will be based on a long-term view and singular focus on where we want the Marine Corps to be in the next 5-15 years, well beyond the tenure of any one Commandant, Presidential administration, or Congress. We cannot afford to retain outdated policies, doctrine, organizations, or force development strategies. The coming decade will be characterized by conflict, crisis, and rapid change - just as every decade preceding it. And despite our best efforts, history demonstrates that we will fail to accurately predict every conflict; will be surprised by an unforeseen crisis; and may be late to fully grasp the implications of rapid change around us. The Arab Spring, West African Ebola Outbreak, Scarborough Shoal standoff, Russian invasion of eastern Ukraine, and weaponization of social media are but a few recent examples illustrating the point. While we must accept an environment characterized by uncertainty, we cannot ignore strong signals of change nor be complacent when it comes to designing and preparing the force for the future. What is abundantly clear is that the future operating environment will place heavy demands on our Nation's Naval Services. Context and direction is clearly articulated in the NDS and DPG as well as testimony from our uniformed and civilian leadership. No further guidance is required; we are moving forward. The Marine Corps will be trained and equipped as a naval expeditionary force-in-readiness and prepared to operate inside actively contested maritime spaces in support of fleet operations. In crisis prevention and crisis response, the Fleet Marine Force - acting as an extension of the Fleet - will be first on the scene, first to help, first to contain a brewing crisis, and first to fight if required to do so. The Marine Corps will be the "force of choice" for the President, Secretary, and Combatant Commander - "a certain force for an uncertain world" as noted by Commandant Krulak. No matter what the crisis, our civilian leaders should always have one shared thought - Send in the Marines.

Grizzly Bear Recovery Plan

Grizzly Bear Recovery Plan PDF Author: Christopher Servheen
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 66

Get Book Here

Book Description