Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 184
Book Description
US-54 Upgrade, Hoover Road to K-2, K-42 Interchange, I-235 Interchange Construction, Wichita
EIS Cumulative
Author:
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages : 464
Book Description
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages : 464
Book Description
US-54/K-96, Kellogg St and Hillside St Widening, Improvement, Wichita
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 142
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 142
Book Description
Route US-54 - Upgrade Existing US-54 to Freeway Standards, from Hoover Road Wast [sic] 1.9 Miles to Kansas Routes 2 and 42 (Edwards Avenue)
Author: United States. Federal Highway Administration
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
US-54 Improvement, Seville Lane to Hoover Road, Wichita
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 66
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 66
Book Description
I-235 and US-54/400 (Kellogg Ave.) and Central Study
Author: Kansas. Department of Transportation
Publisher:
ISBN:
Category : Express highway interchanges
Languages : en
Pages : 137
Book Description
"Kansas Secretary of Transportation Deb Miller directed KDOT staff to take a fresh look at the I-235 and US-54/400 (Kellogg Ave.) interchange and the I-235 and Central Avenue interchange."--Page 1-1.
Publisher:
ISBN:
Category : Express highway interchanges
Languages : en
Pages : 137
Book Description
"Kansas Secretary of Transportation Deb Miller directed KDOT staff to take a fresh look at the I-235 and US-54/400 (Kellogg Ave.) interchange and the I-235 and Central Avenue interchange."--Page 1-1.
Improvement of 4.1 Miles of Existing US-54 Highway to Freeway Standards, from Hoover Road East to Topeka Avenue, All in the City of Wichita, Kansas
Author: United States. Federal Highway Administration
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
Investigation of Production and Schedule Improvement Methods for Urban Interchange Reconstruction Projects
Author: Seonghoon Kim
Publisher:
ISBN:
Category :
Languages : en
Pages : 422
Book Description
This research was conducted to (1) analyze an earthmoving productivity, (2) develop detailed schedules for uban interchange reconstruction for the Iowa Department of Transportation (Iowa DOT), and (3) determine whether expediting urban interchange construction is possible solution for shortening duration for the reconstruction of Interstate 235 (I-235). The following projects were used as case studies in this research: (1) interchange reconstruction projects for the 14th Street, 19th Street, and 42nd Street in Des Moines, and 35th Street in West Des moines, (2) bridge demolition projects for the 19th Street, Martin Luther King Street, and 42nd Street in Des Moines in the reconstruction of I-235. The analysis results based on site observation and statistical analysis were described in the case studies. In earthmoving analysis, factors influencing earthmoving production rates, such as bucket capacity, number of passes, and hauling distance in urban interchange construction were significant. For the scheduling part, the as-built schedules for 35th Street in West Des Moines and 42nd Street in Des Moines were developed and compared with contractor's original schedule. The actual urban interchange construction schedule resulted in later completion than originally estimated by contractors. Even if earthwork, utility work, and paving processes were expedited based on the as-built schedules, the activities could be expedited aggresively to reduce the construction duration more. Expedited urban interchange construction is an alternative method to reduce total duration of the I-235 corridor work. Moreover, duration, cost, resource, and sequence for urban bridge demolition were influenced by traffic control and bridge type.
Publisher:
ISBN:
Category :
Languages : en
Pages : 422
Book Description
This research was conducted to (1) analyze an earthmoving productivity, (2) develop detailed schedules for uban interchange reconstruction for the Iowa Department of Transportation (Iowa DOT), and (3) determine whether expediting urban interchange construction is possible solution for shortening duration for the reconstruction of Interstate 235 (I-235). The following projects were used as case studies in this research: (1) interchange reconstruction projects for the 14th Street, 19th Street, and 42nd Street in Des Moines, and 35th Street in West Des moines, (2) bridge demolition projects for the 19th Street, Martin Luther King Street, and 42nd Street in Des Moines in the reconstruction of I-235. The analysis results based on site observation and statistical analysis were described in the case studies. In earthmoving analysis, factors influencing earthmoving production rates, such as bucket capacity, number of passes, and hauling distance in urban interchange construction were significant. For the scheduling part, the as-built schedules for 35th Street in West Des Moines and 42nd Street in Des Moines were developed and compared with contractor's original schedule. The actual urban interchange construction schedule resulted in later completion than originally estimated by contractors. Even if earthwork, utility work, and paving processes were expedited based on the as-built schedules, the activities could be expedited aggresively to reduce the construction duration more. Expedited urban interchange construction is an alternative method to reduce total duration of the I-235 corridor work. Moreover, duration, cost, resource, and sequence for urban bridge demolition were influenced by traffic control and bridge type.
Springs of Texas
Author: Gunnar M. Brune
Publisher: Texas A&M University Press
ISBN: 9781585441969
Category : Business & Economics
Languages : en
Pages : 616
Book Description
This text explores the natural history of Texas and more than 2900 springs in 183 Texas counties. It also includes an in-depth discussion of the general characteristics of springs - their physical and prehistoric settings, their historical significance, and their associated flora and fauna.
Publisher: Texas A&M University Press
ISBN: 9781585441969
Category : Business & Economics
Languages : en
Pages : 616
Book Description
This text explores the natural history of Texas and more than 2900 springs in 183 Texas counties. It also includes an in-depth discussion of the general characteristics of springs - their physical and prehistoric settings, their historical significance, and their associated flora and fauna.
The Army Air Forces in World War II: Men and planes
Author:
Publisher:
ISBN:
Category : Electronic government information
Languages : en
Pages : 920
Book Description
Publisher:
ISBN:
Category : Electronic government information
Languages : en
Pages : 920
Book Description