The Watts Bar steam plant; a comprehensive report on the planning

The Watts Bar steam plant; a comprehensive report on the planning PDF Author: Tennessee Valley Authority
Publisher:
ISBN:
Category :
Languages : en
Pages : 402

Get Book Here

Book Description

The Watts Bar steam plant; a comprehensive report on the planning

The Watts Bar steam plant; a comprehensive report on the planning PDF Author: Tennessee Valley Authority
Publisher:
ISBN:
Category :
Languages : en
Pages : 402

Get Book Here

Book Description


The Watts Bar Steam Plant

The Watts Bar Steam Plant PDF Author: Tennessee Valley Authority
Publisher:
ISBN:
Category : Electric power production
Languages : en
Pages : 404

Get Book Here

Book Description
The Watts Bar Steam Plant is the first fuel-burning electric power plant constructed by the TVA. The first two of its four 60,000-kilowatt generating units were placed in commercial operation in February and March 1942 at a time when the products of industry and agriculture in the valley region were critical items in the war effort. These units increased the continuous energy capacity of the TVA system to approximately 830,000 kilowatts and the system peak to about 1,100,000 kilowatts. The further addition of Cherokee, Chatuge, and Nottely Dams and the down-river units raised the continuous energy of the system to 960,000 kilowatts and the peak capability to about 1,300,000 kilowatts by the fall of 1942. The third Watts Bar Steam Plant unit began operation in February 1943 and the fourth in April 1945 - important factors in keeping ahead of system demands.

The Watts Bar project; a comprehensive report on the planning

The Watts Bar project; a comprehensive report on the planning PDF Author: Tennessee Valley Authority
Publisher:
ISBN:
Category :
Languages : en
Pages : 568

Get Book Here

Book Description


The Watts Bar Project

The Watts Bar Project PDF Author:
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 568

Get Book Here

Book Description


Technical Report

Technical Report PDF Author: Tennessee Valley Authority
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 696

Get Book Here

Book Description


The Colbert Steam Plant

The Colbert Steam Plant PDF Author:
Publisher:
ISBN:
Category : Steam power plants
Languages : en
Pages : 436

Get Book Here

Book Description
The Colbert Steam Plant is located on the south bank of Pickwick Landing Lake at mile 245 (Tennessee River mileage upstream from the confluence with the Ohio River) and 14.5 miles downstream, or west, of the Wilson Dam.

Bibliography of Technical Reports

Bibliography of Technical Reports PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 62

Get Book Here

Book Description


The Cherokee Project

The Cherokee Project PDF Author: Tennessee Valley Authority
Publisher:
ISBN:
Category : Cherokee Dam
Languages : en
Pages : 432

Get Book Here

Book Description
Cherokee is the tenth major hydro project authorized for construction of the Tennessee Valley Authority and the seventh to be completed. The dam is located at mile 52.3 on the Holston River which unites with the French Broad River just above Knoxville to form the Tennessee River. This main tributary project was the first of several TVA dams authorized under World War II emergency program and constructed on an emergency basis. Although operated primarily for power during the war emergency, Cherokee forms an integral unit in the overall system of water control projects in the Tennessee Valley, and under normal multiple purpose operation aids in reducing main-river flood stages and in stabilizing low water flows.

The Kentucky Project

The Kentucky Project PDF Author: Tennessee Valley Authority
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 908

Get Book Here

Book Description


The Upper Holston Projects

The Upper Holston Projects PDF Author: Tennessee Valley Authority
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 1270

Get Book Here

Book Description
The development from inception through initial operation of four major TVA water control projects in the upper or northeastern part of the Tennessee Valley - Watauga, South Holston, Boone, and Fort Patrick Henry, collectively designated Upper Holston - is presented in this technical report, The Upper Holston Projects. Improvement of the minor Wilbur project immediately below Watauga is included as an appendix. The manuscript was compiled from basic planning, design, construction and other development of the projects and comprises a record of the more important facts concerning the planning, design, construction, costs, and initial operations of these projects by the TVA.