Supporting Evaluation for the Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

Supporting Evaluation for the Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri PDF Author: United States. Department of Energy. Weldon Spring Site Remedial Project
Publisher:
ISBN:
Category : Hazardous waste site remediation
Languages : en
Pages : 0

Get Book Here

Book Description

Supporting Evaluation for the Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

Supporting Evaluation for the Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri PDF Author: United States. Department of Energy. Weldon Spring Site Remedial Project
Publisher:
ISBN:
Category : Hazardous waste site remediation
Languages : en
Pages : 0

Get Book Here

Book Description


Supporting Evaluation for the Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

Supporting Evaluation for the Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 104

Get Book Here

Book Description
This report presents the technical information developed since the interim record of decision (IROD) was issued in September 2000 (U.S. Department of Energy [DOE] 2000). The information was incorporated into the evaluation that was performed in selecting the preferred alternative for the Chemical Plant groundwater operable unit (GWOU) of the Weldon Spring site. The contaminants of concern (COCs) in groundwater and springs are trichloroethylene (TCE), nitrate, uranium, and nitroaromatic compounds. The preferred alternative of monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities is described in the ''Proposed Plan (PP) for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri'' (DOE 2003b).

Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 62

Get Book Here

Book Description
This Proposed Plan addresses the remediation of groundwater contamination at the chemical plant area of the Weldon Spring site in Weldon Spring, Missouri. The site is located approximately 48 km (30 mi) west of St. Louis in St. Charles County . Remedial activities at the site will be conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The U.S. Department of Energy (DOE), in conjunction with the U.S. Department of the Army (DA), conducted a joint remedial investigation/feasibility study (RI/FS) to allow for a comprehensive evaluation of groundwater conditions at the Weldon Spring chemical plant area and the Weldon Spring ordnance works area, which is an Army site adjacent to the chemical plant area. Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. That is, the analysis conducted and presented in the RVFS reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This Proposed Plan summarizes information about chemical plant area groundwater that is presented in the following documents: (1) The Remedial Investigation (RI), which presents information on the nature and extent of contamination; (2) The Baseline Risk Assessment (BRA), which evaluates impacts to human health and the environment that could occur if no cleanup action of the groundwater were taken (DOE and DA 1997a); and (3) The Feasibility Study (FS) and the Supplemental FS, which develop and evaluate remedial action alternatives for groundwater remediation.

Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri PDF Author: United States. Department of Energy. Weldon Spring Site Remedial Action Project
Publisher:
ISBN:
Category : Hazardous waste site remediation
Languages : en
Pages : 0

Get Book Here

Book Description


Work Plan for the Remedial Investigation

Work Plan for the Remedial Investigation PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


The Office of Environmental Management Technical Reports

The Office of Environmental Management Technical Reports PDF Author:
Publisher:
ISBN:
Category : Environmental management
Languages : en
Pages : 972

Get Book Here

Book Description


Feasibility Study for Remedial Action for the Groundwater Operable Units at the Chemical Plant Area and the Ordnance Works Area at the Weldon Spring Site, Weldon Spring, Missouri

Feasibility Study for Remedial Action for the Groundwater Operable Units at the Chemical Plant Area and the Ordnance Works Area at the Weldon Spring Site, Weldon Spring, Missouri PDF Author:
Publisher:
ISBN:
Category : Groundwater
Languages : en
Pages :

Get Book Here

Book Description
This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP (Weldon Spring Chemical Plant) and the WSOW (Weldon Spring Ordnance Works).

Energy Research Abstracts

Energy Research Abstracts PDF Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 444

Get Book Here

Book Description


Weldon Spring Site, Remedial Action

Weldon Spring Site, Remedial Action PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 414

Get Book Here

Book Description


Final Record of Decision for the Final Remedial Action for Operable Unit 2 Groundwater at the Former Weldon Spring Ordinance Works Site, Weldon Spring, Missouri

Final Record of Decision for the Final Remedial Action for Operable Unit 2 Groundwater at the Former Weldon Spring Ordinance Works Site, Weldon Spring, Missouri PDF Author:
Publisher:
ISBN:
Category : Groundwater
Languages : en
Pages : 30

Get Book Here

Book Description
This decision document presents the selected final remedial action for Operable Unit 2 (OU2) groundwater at the former Weldon Spring Ordnance Works (WSOW) site in Weldon Spring, Missouri.