Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit No. 456

Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit No. 456 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 50

Get Book Here

Book Description
The underground storage tank (UST) release site 23-111-1 is located in Mercury, Nevada. The site is in Area 23 of the Nevada Test Site, (NTS) located on the north side of Building 111. The tank associated with the release was closed in place using cement grout on September 6, 1990. The tank was not closed by removal due to numerous active underground utilities, a high-voltage transformer pad, and overhead power lines. Soil samples collected below the tank bottom at the time of tank closure activities exceeded the Nevada Administrative Code Action Level of 100 milligrams per kilogram (mg/kg) for petroleum hydrocarbons. Maximum concentrations detected were 119 mg/kg. Two passive venting wells were subsequently installed at the tank ends to monitor the progress of biodegradation at the site. Quarterly air sampling from the wells was completed for approximately one year, but was discontinued since data indicated that considerable biodegradation was not occurring at the site.

Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit No. 456

Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit No. 456 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 50

Get Book Here

Book Description
The underground storage tank (UST) release site 23-111-1 is located in Mercury, Nevada. The site is in Area 23 of the Nevada Test Site, (NTS) located on the north side of Building 111. The tank associated with the release was closed in place using cement grout on September 6, 1990. The tank was not closed by removal due to numerous active underground utilities, a high-voltage transformer pad, and overhead power lines. Soil samples collected below the tank bottom at the time of tank closure activities exceeded the Nevada Administrative Code Action Level of 100 milligrams per kilogram (mg/kg) for petroleum hydrocarbons. Maximum concentrations detected were 119 mg/kg. Two passive venting wells were subsequently installed at the tank ends to monitor the progress of biodegradation at the site. Quarterly air sampling from the wells was completed for approximately one year, but was discontinued since data indicated that considerable biodegradation was not occurring at the site.

Bij den hondertsten geboortedag van J.H. Dünner

Bij den hondertsten geboortedag van J.H. Dünner PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 72

Get Book Here

Book Description


Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 416, Mud Pit, Project Shoal Area

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 416, Mud Pit, Project Shoal Area PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 42

Get Book Here

Book Description
This plan addresses the actions necessary for the restoration and closure of the Project Shoal Area (PSA), Surface Corrective Action Unit (CAU) 416, Mud Pit (Corrective Action Site No. 57-09-01), a pit that was used to store effluent produced during drilling of the Post-Shot Borehole PS-1 in 1963. This plan describes the activities that will occur at the site and the steps that will be taken to gather enough data to obtain a notice of completion from the Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented with the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996) and the Industrial Sites Quality Assurance Project Plan (DOE/NV, 1994). The SAFER process is being employed at this CAU where enough information exists about the nature and extent of contamination to propose an appropriate corrective action without completing a Corrective Action Decision Document and Corrective Action Plan. This process combines elements of the Data Quality Objective (DQO) process and the observational approach to help plan and conduct corrective actions. DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the process. This has already been completed for the mud pit so it will not be repeated here. The DQOs for the mud pit are presented in the Corrective Action Investigation Plan for Project Shoal Area, CAU No. 416 (DOE/NV, 1996). This observational approach provides a framework for managing uncertainty and planning decision making.

Streamlined Approach for Environmental Restoration Plan for Corrective Action Units 530, 531, 532, 533, 534, and 535, Nevada Test Site Mud Pits, Nevada Test Site, Nevada, Revision 0 with ROTC 1 and 2

Streamlined Approach for Environmental Restoration Plan for Corrective Action Units 530, 531, 532, 533, 534, and 535, Nevada Test Site Mud Pits, Nevada Test Site, Nevada, Revision 0 with ROTC 1 and 2 PDF Author: Alfred Wickline
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses closure for the following six corrective action units (CAUs) identified in the ''Federal Facility Agreement and Consent Order'' (1996): (1) CAU 530 - LANL Preshot Mud Pits; (2) CAU 531 - LANL Postshot Mud Pits; (3) CAU 532 - LLNL Preshot Mud Pits; (4) CAU 533 - LLNL Postshot Mud Pits; (5) CAU 534 - Exploratory/Instrumentation Mud Pits; and (6) CAU 535 - Mud Pits/Disposal Areas. Corrective Action Units 530-535 consist of corrective action sites (CASs) located in Areas 1-10, 14, 17, 19, and 20 of the Nevada Test Site (NTS). This plan provides the approach for activities needed to gather the necessary information for closing all the CASs within these CAUs. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of all CASs within CAUs 530-535 using the SAFER process. The Data Quality Objective (DQO) process utilized in this investigation follows the approved risk-based closure strategy outlined in the ''Mud Pit Risk-Based Closure Strategy Report'' (NNSA/NSO, 2004b). The closure strategy was developed based on available information including historical documentation of process knowledge, analytical results from previous sampling activities for contaminants of potential concern at similar mud pits located at the NTS and at off-site locations, future land-use scenarios for each NTS area, and potential exposure scenarios along with the calculated risk for human and ecological receptors.

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 249

Get Book Here

Book Description


Streamlined Approach for Environmental Restoration Plan, CAU No. 400

Streamlined Approach for Environmental Restoration Plan, CAU No. 400 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 94

Get Book Here

Book Description
This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept. The SAFER process is employed at Corrective Action Units (CAUs) where enough information exists about the nature and extent of contamination to propose an appropriate corrective action prior to the implementation of a Corrective Action Investigation (CAI). This process combines elements of the Data Quality Objectives (DQO) process and the observational approach to help plan and conduct corrective actions. DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the process. The observational approach provides a framework for managing uncertainty and planning decision-making. The purpose of the investigation in the SAFER process is to document and verify the adequacy of existing information (such as process knowledge); to affirm the decision for clean closure, closure in place, or to take no further action; and to provide sufficient data to implement the corrective action.

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 484

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 484 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
This Streamlined Approach for Environmental Restoration plan details the activities necessary to close Corrective Action Unit (CAU) 484: Surface Debris, Waste Sites, and Burn Area (Tonopah Test Range). CAU 484 consists of sites located at the Tonopah Test Range, Nevada, and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order. CAU 484 consists of the following six Corrective Action Sites: (1) CAS RG-52-007-TAML, Davis Gun Penetrator Test; (2) CAS TA-52-001-TANL, NEDS Detonation Area; (3) CAS TA-52-004-TAAL, Metal Particle Dispersion Test; (4) CAS TA-52-005-TAAL, Joint Test Assembly DU Sites; (5) CAS TA-52-006-TAPL, Depleted Uranium Site; and (6) CAS TA-54-001-TANL, Containment Tank and Steel Structure.

Closure Report for Corrective Action Unit 271

Closure Report for Corrective Action Unit 271 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
The purpose of this CR is to document that closure activities have met the approved closure standards detailed in the NDEP-approved CAP for CAU 271. The purpose of the Errata Sheet is as follows: In Appendix G, Use Restriction (UR) Documentation, the UR form and drawing of the UR area do not reflect the correct coordinates. Since the original UR was put into place, the UR Form has been updated to include additional information that was not on the original form. This Errata Sheet replaces the original UR Form and drawing. In place of the drawing of the UR area, an aerial photograph is included which reflects the UR area and the correct coordinates for the UR area.

Cleaning Up the Nation's Waste Sites

Cleaning Up the Nation's Waste Sites PDF Author:
Publisher:
ISBN:
Category : Hazardous waste site remediation
Languages : en
Pages : 344

Get Book Here

Book Description


Integrated Approach to Planning the Remediation of Sites Undergoing Decommissioning

Integrated Approach to Planning the Remediation of Sites Undergoing Decommissioning PDF Author: International Atomic Energy Agency
Publisher:
ISBN: 9789201020093
Category : Business & Economics
Languages : en
Pages : 0

Get Book Here

Book Description
Investigates the potential synergies between decommissioning and site remediation in order to allow for the implementation of both processes in an integrated and cost effective way. The publication reviews the planning procedures for, and operational constraints on, partial remediation of sites.