Recommended Revisions to Nuclear Regulatory Commission Seismic Design Criteria

Recommended Revisions to Nuclear Regulatory Commission Seismic Design Criteria PDF Author: D. W. Coats
Publisher:
ISBN:
Category : Nuclear power plants
Languages : en
Pages : 236

Get Book Here

Book Description

Recommended Revisions to Nuclear Regulatory Commission Seismic Design Criteria

Recommended Revisions to Nuclear Regulatory Commission Seismic Design Criteria PDF Author: D. W. Coats
Publisher:
ISBN:
Category : Nuclear power plants
Languages : en
Pages : 236

Get Book Here

Book Description


Regulatory Guide 1.29

Regulatory Guide 1.29 PDF Author: U.S. Nuclear Regulatory Commission. Office of Standards Development
Publisher:
ISBN:
Category : Nuclear power plants
Languages : en
Pages : 3

Get Book Here

Book Description
"This guide describes a method acceptable to the NRC staff for identifying and classifying those features of light-water-cooled nuclear power plants that should be designed to withstand the effects of the SSE [Safe Shutdown Earthquake]"--Introd.

NRC Regulatory Guides

NRC Regulatory Guides PDF Author: U.S. Nuclear Regulatory Commission
Publisher:
ISBN:
Category : Nuclear industry
Languages : en
Pages : 12

Get Book Here

Book Description
A compilation of currently available electronic versions of NRC regulatory guides.

Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 2. Evaluation of Seismic Designs

Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 2. Evaluation of Seismic Designs PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
This document reports the position and recommendations of the NRC Piping Review Committee, Task Group on Seismic Design. The Task Group considered overlapping conservation in the various steps of seismic design, the effects of using two levels of earthquake as a design criterion, and current industry practices. Issues such as damping values, spectra modification, multiple response spectra methods, nozzle and support design, design margins, inelastic piping response, and the use of snubbers are addressed. Effects of current regulatory requirements for piping design are evaluated, and recommendations for immediate licensing action, changes in existing requirements, and research programs are presented. Additional background information and suggestions given by consultants are also presented.

Report of the U.S. Nuclear Regulatory Commission Piping Review Committee: Evaluation of seismic designs: a review of seismic design requirements for nuclear power plant piping

Report of the U.S. Nuclear Regulatory Commission Piping Review Committee: Evaluation of seismic designs: a review of seismic design requirements for nuclear power plant piping PDF Author: U.S. Nuclear Regulatory Commission. Piping Review Committee. Pipe Crack Task Group
Publisher:
ISBN:
Category : Boiling water reactors
Languages : en
Pages : 200

Get Book Here

Book Description


NUREG/CR.

NUREG/CR. PDF Author: U.S. Nuclear Regulatory Commission
Publisher:
ISBN:
Category : Nuclear energy
Languages : en
Pages : 60

Get Book Here

Book Description


Review of Public Comments on Proposed Seismic Design Criteria

Review of Public Comments on Proposed Seismic Design Criteria PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
During the first quarter of 1988, the Nuclear Regulatory Commission (NRC) prepared a proposed Revision 2 to the NUREG-0800 Standard Review Plan (SRP) Sections 2.5.2 (Vibratory Ground Motion), 3.7.1 (Seismic Design Parameters), 3.7.2 (Seismic Systems Analysis) and 3.7.3 (Seismic Subsystem Analysis). The proposed Revision 2 to the SRP was a result of many years' work carried out by the NRC and the nuclear industry on the Unresolved Safety Issue (USI) A-40: ''Seismic Design Criteria.'' The background material related to NRC's efforts for resolving the A-40 issue is described in NUREG-1233. In June 1988, the proposed Revision 2 of the SRP was issued by NRC for public review and comments. Comments were received from Sargent and Lundy Engineers, Westinghouse Electric Corporation, Stevenson and Associates, Duke Power Company, General Electric Company and Electric Power Research Institute. In September 1988, Brookhaven National Laboratory (BNL) and its consultants (C.J. Costantino, R.P. Kennedy, J. Stevenson, M. Shinozuka and A.S. Veletsos) were requested to carry out a review of the comments received from the above six organizations. The objective of this review was to assist the NRC staff with the evaluation and resolution of the public comments. This review was initiated during October 1988 and it was completed on January 1989. As a result of this review, a set of modifications to the above mentioned sections of the SRP were recommended by BNL and its consultants. This paper summarizes the recommended modifications. 4 refs.

Regulatory Guide 1.61

Regulatory Guide 1.61 PDF Author: U.S. Nuclear Regulatory Commission. Office of Nuclear Regulatory Research
Publisher:
ISBN:
Category : Earthquake resistant design
Languages : en
Pages : 12

Get Book Here

Book Description


Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants

Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants PDF Author: U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation
Publisher:
ISBN:
Category : Nuclear power plants
Languages : en
Pages : 458

Get Book Here

Book Description


NRC Regulatory Guides

NRC Regulatory Guides PDF Author: U.S. Nuclear Regulatory Commission
Publisher:
ISBN:
Category : Nuclear industry
Languages : en
Pages : 116

Get Book Here

Book Description
A compilation of currently available electronic versions of NRC regulatory guides.