Precast Concrete Elements for Accelerated Bridge Construction

Precast Concrete Elements for Accelerated Bridge Construction PDF Author: Terry J. Wipf
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 4

Get Book Here

Book Description

Precast Concrete Elements for Accelerated Bridge Construction

Precast Concrete Elements for Accelerated Bridge Construction PDF Author: Terry J. Wipf
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 4

Get Book Here

Book Description


Precast Concrete Elements for Accelerated Bridge Construction

Precast Concrete Elements for Accelerated Bridge Construction PDF Author:
Publisher:
ISBN:
Category : Concrete bridges
Languages : en
Pages : 104

Get Book Here

Book Description


Precast Concrete Elements for Accelerated Bridge Construction

Precast Concrete Elements for Accelerated Bridge Construction PDF Author:
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages :

Get Book Here

Book Description
The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed in 2007 over a stream. The bridge's precast elements included precast cap beams and precast box girders. Precast element fabrication and bridge construction were observed, two precast box girders were tested in the laboratory, and the completed bridge was field tested in 2007 and 2008.

Precast Concrete Elements for Accelerated Bridge Construction

Precast Concrete Elements for Accelerated Bridge Construction PDF Author: Brent Phares
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages :

Get Book Here

Book Description
The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed in 2007 over a stream. The bridge's precast elements included precast cap beams and precast box girders. Precast element fabrication and bridge construction were observed, two precast box girders were tested in the laboratory, and the completed bridge was field tested in 2007 and 2008.

Precast Concrete Elements for Accelerated Bridge Construction: Laboratory testing of full-depth precast, prestressed concrete deck panels : Boone County bridge

Precast Concrete Elements for Accelerated Bridge Construction: Laboratory testing of full-depth precast, prestressed concrete deck panels : Boone County bridge PDF Author: Terry J. Wipf
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages :

Get Book Here

Book Description
Also available via the Internet.

Precast Concrete Elements for Accelerated Bridge Construction: Laboratory testing, field testing, and evaluation of a precast concrete bridge: Madison County bridge

Precast Concrete Elements for Accelerated Bridge Construction: Laboratory testing, field testing, and evaluation of a precast concrete bridge: Madison County bridge PDF Author:
Publisher:
ISBN:
Category : Concrete bridges
Languages : en
Pages :

Get Book Here

Book Description


Available Accelerated Bridge Construction Options for Short Span Bridges

Available Accelerated Bridge Construction Options for Short Span Bridges PDF Author: Armin Mehrabi
Publisher: Cambridge Scholars Publishing
ISBN: 1036401979
Category : Technology & Engineering
Languages : en
Pages : 319

Get Book Here

Book Description
By employing prefabricated bridge elements and systems, Accelerated Bridge Construction reduces on-site construction time and traffic disruptions, and enhances long-term performance. ABC is particularly advantageous for short-span bridges that are well-suited to standardized prefabrication. In such cases, the entire superstructure and substructure can often be constructed using prefabricated deck elements, modular decks, or systems that span the full bridge width. The construction methods can range from traditional crane installations to Self-Propelled Modular Transport units or slide-in techniques for moving the entire superstructures. This book introduces the concept of ABC and examines its application in the context of short-span bridge construction. It categorizes and details short-span bridges based on various criteria and evaluates the performance of the existing bridges. Decision-making processes regarding the adoption of ABC, choice of elements, systems, and construction methods are also discussed. Additionally, the book covers the inspection of short-span bridges and includes a design example.

Accelerated Bridge Construction

Accelerated Bridge Construction PDF Author: Mohiuddin Ali Khan
Publisher: Elsevier
ISBN: 0124072259
Category : Technology & Engineering
Languages : en
Pages : 651

Get Book Here

Book Description
The traveling public has no patience for prolonged, high cost construction projects. This puts highway construction contractors under intense pressure to minimize traffic disruptions and construction cost. Actively promoted by the Federal Highway Administration, there are hundreds of accelerated bridge construction (ABC) construction programs in the United States, Europe and Japan. Accelerated Bridge Construction: Best Practices and Techniques provides a wide range of construction techniques, processes and technologies designed to maximize bridge construction or reconstruction operations while minimizing project delays and community disruption. Describes design methods for accelerated bridge substructure construction; reducing foundation construction time and methods by using pile bents Explains applications to steel bridges, temporary bridges in place of detours using quick erection and demolition Covers design-build systems' boon to ABC; development of software; use of fiber reinforced polymer (FRP) Includes applications to glulam and sawn lumber bridges, precast concrete bridges, precast joints details; use of lightweight aggregate concrete, aluminum and high-performance steel

Innovative Bridge Designs for Rapid Renewal: ABC Toolkit

Innovative Bridge Designs for Rapid Renewal: ABC Toolkit PDF Author: TRANSPORTATION RESEARCH BOARD
Publisher: Transportation Research Board
ISBN: 030927284X
Category :
Languages : en
Pages : 323

Get Book Here

Book Description


Improving Bridges with Prefabricated Precast Concrete Systems

Improving Bridges with Prefabricated Precast Concrete Systems PDF Author:
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages :

Get Book Here

Book Description
In order to minimize the impact of construction on the traveling public, MDOT utilizes innovative and specialized construction methods such as Accelerated Bridge Construction (ABC). Michigan, like other highway agencies in the region, has several challenges in specifying prefabricated bridge elements and systems (PBES) and accelerated bridge construction (ABC) techniques for bridge replacement projects. Among those challenges, the following are the most common: (1) justification of initial project costs, (2) defining a rational process for selecting ABC over conventional construction, (3) absence of PBES selection guidelines and proven standard and successful designs, (4) absence of constructability evaluation guidelines, and (5) uncertain durability performance of PBES and connections. This research project was initiated with several objectives. They were achieved by (1) synthesizing the state-of-the-art practices, challenges, and lessons learned from the implemented ABC projects, (2) developing a Michigan-specific decision-making platform based on the site specific data to identify the optimal construction alternative between conventional construction and ABC, (3) developing a comprehensive list of connection details and cementitious materials for connections, (4) developing standard deck level longitudinal connection details for typical highway bridges, (5) developing a template of special provisions for grout selection and application procedures, (6) documenting construction procedures, equipment, and implementation limitations, (7) developing a constructability review checklist, and (6) providing recommendations for further research and implementation of PBES based on constructability, maintainability, repairability, and durability.