Pool 5 Channel Management Study. Mississippi River 9-Foot Channel Project, Channel Management Program. Definite Project Report/Environmental Assessment. Pool 5, Upper Mississippi River, Buffalo County, Wisconsin and Wabasha and Winona Counties, Minnesota

Pool 5 Channel Management Study. Mississippi River 9-Foot Channel Project, Channel Management Program. Definite Project Report/Environmental Assessment. Pool 5, Upper Mississippi River, Buffalo County, Wisconsin and Wabasha and Winona Counties, Minnesota PDF Author:
Publisher:
ISBN: 9781423527220
Category :
Languages : en
Pages : 428

Get Book Here

Book Description
The purpose of this study was to evaluate channel management in pool 5 on the Mississippi River, from Lock and Dam 5 at river mile 738.2 upstream to Lock and Dam no. 4 at river mile 752.8. Study efforts focused on measures to reduce the frequency of dredging problem areas, preventive maintenance, and using dredged material to construct islands habitat purposes. No significant navigation problems were identified aside from channel shoaling in the mid-pool reach. There has been significant decline in fish and wildlife habitat in the lower portion of pool 5 due primarily to loss of islands, sand sediments in backwater habitats, decline in aquatic vegetation and a reduction in bathymetric diversity. The primary restoration measure is the construction of five small islands in lower Belvidere Slough area using channel maintenance dredged material. Wing dam notching will also improve fish habitat.

Pool 5 Channel Management Study. Mississippi River 9-Foot Channel Project, Channel Management Program. Definite Project Report/Environmental Assessment. Pool 5, Upper Mississippi River, Buffalo County, Wisconsin and Wabasha and Winona Counties, Minnesota

Pool 5 Channel Management Study. Mississippi River 9-Foot Channel Project, Channel Management Program. Definite Project Report/Environmental Assessment. Pool 5, Upper Mississippi River, Buffalo County, Wisconsin and Wabasha and Winona Counties, Minnesota PDF Author:
Publisher:
ISBN: 9781423527220
Category :
Languages : en
Pages : 428

Get Book Here

Book Description
The purpose of this study was to evaluate channel management in pool 5 on the Mississippi River, from Lock and Dam 5 at river mile 738.2 upstream to Lock and Dam no. 4 at river mile 752.8. Study efforts focused on measures to reduce the frequency of dredging problem areas, preventive maintenance, and using dredged material to construct islands habitat purposes. No significant navigation problems were identified aside from channel shoaling in the mid-pool reach. There has been significant decline in fish and wildlife habitat in the lower portion of pool 5 due primarily to loss of islands, sand sediments in backwater habitats, decline in aquatic vegetation and a reduction in bathymetric diversity. The primary restoration measure is the construction of five small islands in lower Belvidere Slough area using channel maintenance dredged material. Wing dam notching will also improve fish habitat.

Pool 5 Channel Management Study

Pool 5 Channel Management Study PDF Author: United States. Army. Corps of Engineers. St. Paul District
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages :

Get Book Here

Book Description


Lower Pool 8 Channel Management Study

Lower Pool 8 Channel Management Study PDF Author: United States. Army. Corps of Engineers. St. Paul District
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages :

Get Book Here

Book Description


9-foot Navigation Channel Project, Channel Maintenance Management Plan, Upper Mississippi River, Head of Navigation to Guttenburg

9-foot Navigation Channel Project, Channel Maintenance Management Plan, Upper Mississippi River, Head of Navigation to Guttenburg PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 398

Get Book Here

Book Description


Revision of Master Plan for Resource Management

Revision of Master Plan for Resource Management PDF Author:
Publisher:
ISBN:
Category : Mississippi River
Languages : en
Pages : 76

Get Book Here

Book Description


Pool 3/Upper Pool 4 Channel Management Study. Mississippi River 9-Foot Channel Project. Channel Management Program

Pool 3/Upper Pool 4 Channel Management Study. Mississippi River 9-Foot Channel Project. Channel Management Program PDF Author:
Publisher:
ISBN: 9781423527237
Category :
Languages : en
Pages : 322

Get Book Here

Book Description
The purpose of this study was to evaluate channel management in pool 3 and upper pool 4 on the Mississippi River. The study area is from the head of Lake Pepin upstream to Look and Dam 2 at Hastings, MN. A lateral current problem below Lock and Dam 2 might be solved by extending the lower guard wall, but this would need further study. Shoaling problems were identified in the Big River reach, and shoaling and associated channel maintenance requirements are needed at river miles 799-803. Restoration of 4 wing dams at river mile 805 is recommended to reduce shoaling. Fish habitat benefits will be achieved through notching 18 wing dams and partial removal of another. The notches are designed to promote the formation of scour holes and channels to improve bathymetric diversity. Construction of a new spot dike at Carter Slough (river mile 807.3) is recommended to prevent habitat degradation occurring as a result of a bypass of the existing spot dike, and to assure the long term integrity of pool 3.

Lower Pool 2 Channel Management Study

Lower Pool 2 Channel Management Study PDF Author: United States. Army. Corps of Engineers. St. Paul District
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages :

Get Book Here

Book Description


Mississippi River-Illinois Waterway 12 Foot Channel Study, Phase I, Minesota, Wisconsin, Iowa, Illinois, & Missouri

Mississippi River-Illinois Waterway 12 Foot Channel Study, Phase I, Minesota, Wisconsin, Iowa, Illinois, & Missouri PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 226

Get Book Here

Book Description


Implementation for GREAT I Study

Implementation for GREAT I Study PDF Author: United States. Army. Corps of Engineers. St. Paul District
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 388

Get Book Here

Book Description


Design Analysis Report, Lower Pool 5 Channel Maintenance

Design Analysis Report, Lower Pool 5 Channel Maintenance PDF Author: United States. Army. Corps of Engineers. St. Paul District
Publisher:
ISBN:
Category : Dredging spoil
Languages : en
Pages :

Get Book Here

Book Description