Author: KAMAN TEMPO SANTA BARBARA CA.
Publisher:
ISBN:
Category :
Languages : en
Pages : 95
Book Description
Operation HARDTACK, Phase II.
Author: KAMAN TEMPO SANTA BARBARA CA.
Publisher:
ISBN:
Category :
Languages : en
Pages : 95
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 95
Book Description
Operation HARDTACK, Phase II. On-Site Radiological Safety Support Report, Nevada Test Site
Author: REYNOLDS ELECTRICAL AND ENGINEERING CO INC MERCURY NV RADIOLOGICAL SAFETY DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 144
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 144
Book Description
Operation Hardtack, April-October 1958
Author: B. Perkins
Publisher:
ISBN:
Category : Underground nuclear explosions
Languages : en
Pages : 21
Book Description
Publisher:
ISBN:
Category : Underground nuclear explosions
Languages : en
Pages : 21
Book Description
Operation HARDTACK, Phase II: Summary Report of Strong Motion Measurements, Underground Nuclear Detonations
Author: W. M. Adams
Publisher:
ISBN:
Category :
Languages : en
Pages : 80
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 80
Book Description
Operation Hardtack, Phase II
Author: L. M. Swift
Publisher:
ISBN:
Category : 650 0Operation Hardtack, 1958
Languages : en
Pages : 112
Book Description
Publisher:
ISBN:
Category : 650 0Operation Hardtack, 1958
Languages : en
Pages : 112
Book Description
Summary Report of Strong Motion Measurements, Underground Nuclear Detonations
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 80
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 80
Book Description
Operation Hardtack
Author: O. R. Placak
Publisher:
ISBN:
Category : Nuclear weapons
Languages : en
Pages : 244
Book Description
Publisher:
ISBN:
Category : Nuclear weapons
Languages : en
Pages : 244
Book Description
Operation Hardtack, Phase II
Author: Oliver R. Placak
Publisher:
ISBN:
Category : Nuclear weapons
Languages : en
Pages : 239
Book Description
The purpose of this report is to present a concise summary of off-site radiological safety activities during Phase II of Operation Hardtack held at the Nevada Test Site during September and October 1958. The report is intended to serve as a source of information to interested AEC and health agency personnel. In order to present the report in easily readable manner, detailed data are shown in the appendices rather than in the main body of the report. Graphs and/or other visual material are included with the narrative description where applicable.
Publisher:
ISBN:
Category : Nuclear weapons
Languages : en
Pages : 239
Book Description
The purpose of this report is to present a concise summary of off-site radiological safety activities during Phase II of Operation Hardtack held at the Nevada Test Site during September and October 1958. The report is intended to serve as a source of information to interested AEC and health agency personnel. In order to present the report in easily readable manner, detailed data are shown in the appendices rather than in the main body of the report. Graphs and/or other visual material are included with the narrative description where applicable.
Operation HARDTACK. Phase 2
Author: HOLMES AND NARVER INC LOS ANGELES CA.
Publisher:
ISBN:
Category :
Languages : en
Pages : 111
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 111
Book Description
Operation Hardtack. Phase 2: Timing and Firing
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 37
Book Description
Edgerton, Germeshausen and Grier, Inc. (EG & G) furnished timing and firing signals for the thirty-seven shots of Operation Hardtack, Phase II. Six independent timing systems were installed in the CP-l building and in five timing signal distribution stations at the Nevada Test Site. Signals from the sequence timers were distributed to experimenters and to zero sites by wire; voice-time announcements were transmitted to experimenters on radio frequencies. The world-time system was operated on surface, tower, and balloon shots and on certain of the underground detonations. Most of the above-ground shots were instrumented for Bhangmeter recording.
Publisher:
ISBN:
Category :
Languages : en
Pages : 37
Book Description
Edgerton, Germeshausen and Grier, Inc. (EG & G) furnished timing and firing signals for the thirty-seven shots of Operation Hardtack, Phase II. Six independent timing systems were installed in the CP-l building and in five timing signal distribution stations at the Nevada Test Site. Signals from the sequence timers were distributed to experimenters and to zero sites by wire; voice-time announcements were transmitted to experimenters on radio frequencies. The world-time system was operated on surface, tower, and balloon shots and on certain of the underground detonations. Most of the above-ground shots were instrumented for Bhangmeter recording.