Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
OAK RIDGE RESEARCH REACTOR QUARTERLY REPORT, JANUARY, FEBRUARY, AND MARCH OF 1967
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Oak Ridge Research Reactor Quarterly Report, January, February, and March of 1973
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, JANUARY, FEBRUARY, AND MARCH OF 1967
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Nuclear Science Abstracts
Author:
Publisher:
ISBN:
Category : Nuclear energy
Languages : en
Pages : 934
Book Description
Publisher:
ISBN:
Category : Nuclear energy
Languages : en
Pages : 934
Book Description
Oak Ridge Research Reactor Quarterly Report, January--March 1972
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Oak Ridge Research Reactor Quarterly Report, January, February, and March of 1978
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 28.7 MW for 73.4 percent of the time during January, February, and March of 1978. Eight new fuel elements were placed in service. The reactor was shut down on sixteen occasions, one of which was unscheduled. Reactor downtime needed for refueling, maintenance and checks was quite low, with the reactor remaining available for operation 88.9 percent of the time. Maintenance activities, both mechanical and instrument were essentially routine in nature. Special tests or measurements completed during the quarter included: (1) reactivity measurement of the Metals and Ceramics Division's (ORR-MFE-1) experiment in CP-C7; (2) flux mapping for core No. 143-B; and (3) calibration of all six shim rods on February 12, 1978 (Appendix A), and calibration of shim rods Nos. 2 through 6 on February 16, 1978.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 28.7 MW for 73.4 percent of the time during January, February, and March of 1978. Eight new fuel elements were placed in service. The reactor was shut down on sixteen occasions, one of which was unscheduled. Reactor downtime needed for refueling, maintenance and checks was quite low, with the reactor remaining available for operation 88.9 percent of the time. Maintenance activities, both mechanical and instrument were essentially routine in nature. Special tests or measurements completed during the quarter included: (1) reactivity measurement of the Metals and Ceramics Division's (ORR-MFE-1) experiment in CP-C7; (2) flux mapping for core No. 143-B; and (3) calibration of all six shim rods on February 12, 1978 (Appendix A), and calibration of shim rods Nos. 2 through 6 on February 16, 1978.
Oak Ridge Research Reactor Quarterly Report, January, February, and March of 1976
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.9 Mw for 82.8 percent of the time during January, February, and March of 1976. Two fuel elements were declared spent (58.8 percent average burnup) during the quarter, while twenty-eight new elements were placed in service. Four shim-rod elements were retired from service at an average burnup of 64.4 percent. The reactor was shutdown on nine occasions, one of which was unscheduled. Two end-of-cycle shutdowns accounted for 92.1 percent of the total downtime. The remaining downtime was used principally for refueling and experiment work. Maintenance activities, both mechanical and instrument, were essentially routine in nature. Special tests or measurements completed during the quarter were three calorimeter gamma heating runs made in CP-E5 during the end of Cycle 129 shutdown.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.9 Mw for 82.8 percent of the time during January, February, and March of 1976. Two fuel elements were declared spent (58.8 percent average burnup) during the quarter, while twenty-eight new elements were placed in service. Four shim-rod elements were retired from service at an average burnup of 64.4 percent. The reactor was shutdown on nine occasions, one of which was unscheduled. Two end-of-cycle shutdowns accounted for 92.1 percent of the total downtime. The remaining downtime was used principally for refueling and experiment work. Maintenance activities, both mechanical and instrument, were essentially routine in nature. Special tests or measurements completed during the quarter were three calorimeter gamma heating runs made in CP-E5 during the end of Cycle 129 shutdown.
Oak Ridge Research Reactor Quarterly Report July, August, and September of 1979
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 25
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 25
Book Description
OAK RIDGE RESEARCH REACTOR QUARTERLY REPORT, OCTOBER, NOVEMBER, AND DECEMBER OF 1966
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
OAK RIDGE RESEARCH REACTOR QUARTERLY REPORT, JULY, AUGUST, AND SEPTEMBER OF 1966
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description